ASHWAMEDH BUILDERS AND DEVELOPERS | P50300009753 | Amravati | Amravati | CC002000000000008 | 2019 | Nov | Complete | N | N | 1 |
CC002000000000017 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
ASHWAMEDH BUILDERS AND DEVELOPERS Total | 2 | |||||||||
Daga Infratech Pvt Ltd | P50300007253 | Amravati | Amravati | CC002000000000016 | 2020 | Aug | Hearing Schedule | N | N | 1 |
CC002000000000021 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
Daga Infratech Pvt Ltd Total | 2 | |||||||||
RUPESH GAJANAN BURGHATE | P50300015999 | Amravati | Amravati | CC002000000000024 | 2021 | Jun | Hearing Schedule | N | N | 1 |
CC002000000000025 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC002000000000027 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC002000000000029 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
CC002000000000033 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
RUPESH GAJANAN BURGHATE Total | 5 | |||||||||
Vitthal Purushottam Sarap | P50100013464 | Amravati | Akola | CC002000000000011 | 2020 | Jul | Hearing Schedule | N | N | 1 |
Vitthal Purushottam Sarap Total | 1 | |||||||||
Grand Total | 10 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
A.M.PATEL INFRA PVT LTD | P51500004770 | Aurangabad | Aurangabad | CC003000000010089 | 2021 | Nov | Complete | N | N | 1 |
A.M.PATEL INFRA PVT LTD Total | 1 | |||||||||
Empire Mall Private Limited | P51500003693 | Aurangabad | Aurangabad | CC003000000000019 | 2018 | Jun | Complete | N | N | 1 |
CC003000000000020 | 2018 | Jun | Complete | N | N | 1 | ||||
CC003000000000038 | 2018 | Sep | Complete | N | N | 1 | ||||
CC003000000000039 | 2018 | Sep | Complete | N | N | 1 | ||||
Empire Mall Private Limited Total | 4 | |||||||||
Ganesh Parvatrao Jaybhaye | P51500002890 | Aurangabad | Aurangabad | CC003000000010075 | 2020 | Dec | Complete | N | N | 1 |
Ganesh Parvatrao Jaybhaye Total | 1 | |||||||||
GOLDENDREAM BUILDCON PVT LTD | P51500002918 | Aurangabad | Aurangabad | CC003000000000048 | 2018 | Nov | Complete | N | N | 1 |
P51500005457 | Aurangabad | Aurangabad | CC003000000000058 | 2019 | Jul | Complete | N | N | 1 | |
GOLDENDREAM BUILDCON PVT LTD Total | 2 | |||||||||
HIMANSHU CONSTRUCTIONS | P51500009107 | Aurangabad | Aurangabad | CC003000000000042 | 2018 | Oct | Complete | N | N | 1 |
HIMANSHU CONSTRUCTIONS Total | 1 | |||||||||
KALYAN TOLL INFRASTUCTRURE LTD | P51500027584 | Aurangabad | Aurangabad | CC003000000010087 | 2021 | Oct | Hearing Schedule | N | N | 1 |
KALYAN TOLL INFRASTUCTRURE LTD Total | 1 | |||||||||
MR SANJAY BALAPRASAD BIYANI | P51100024990 | Aurangabad | Nanded | CC003000000010069 | 2020 | Sep | Hearing Schedule | N | N | 1 |
MR SANJAY BALAPRASAD BIYANI Total | 1 | |||||||||
NARHARI BUILDERS | P51500015344 | Aurangabad | Aurangabad | CC003000000000011 | 2018 | Feb | Complete | N | N | 1 |
CC003000000000012 | 2018 | Mar | Complete | N | N | 1 | ||||
CC003000000000013 | 2018 | Mar | Complete | N | N | 1 | ||||
CC003000000000014 | 2018 | Mar | Complete | N | N | 1 | ||||
CC003000000000049 | 2019 | Jan | Complete | Y | N | 1 | ||||
CC003000000000050 | 2019 | Jan | Complete | Y | N | 1 | ||||
CC003000000000051 | 2019 | Jan | Complete | Y | N | 1 | ||||
NARHARI BUILDERS Total | 7 | |||||||||
PRATHAMESH BUILDERS | P51500019184 | Aurangabad | Aurangabad | CC003000000010062 | 2020 | Jan | Complete | N | N | 1 |
PRATHAMESH BUILDERS Total | 1 | |||||||||
RAJVEER INFRA PROJECTS | P51500008230 | Aurangabad | Aurangabad | CC003000000000060 | 2019 | Oct | Hearing Schedule | N | N | 1 |
RAJVEER INFRA PROJECTS Total | 1 | |||||||||
S S SINGLETON | P51500009966 | Aurangabad | Aurangabad | CC003000000000022 | 2018 | Jun | Complete | N | N | 1 |
CC003000000000024 | 2018 | Jul | Complete | N | N | 1 | ||||
CC003000000000025 | 2018 | Jul | Complete | N | N | 1 | ||||
S S SINGLETON Total | 3 | |||||||||
Shivam Promoters and Builders P Ltd | P51400014239 | Aurangabad | Jalna | CC003000000000010 | 2018 | Feb | Complete | N | N | 1 |
Shivam Promoters and Builders P Ltd Total | 1 | |||||||||
SHREE HARI HOUSING RESORTS AND INFRA | P51500020749 | Aurangabad | Aurangabad | CC003000000010074 | 2020 | Dec | Complete | N | N | 1 |
SHREE HARI HOUSING RESORTS AND INFRA Total | 1 | |||||||||
SIMAR PRIDE VENTURES LLP | P51500015775 | Aurangabad | Aurangabad | CC003000000010076 | 2020 | Dec | Hearing Schedule | N | N | 1 |
SIMAR PRIDE VENTURES LLP Total | 1 | |||||||||
SUNDER SIDDHI | P51500011267 | Aurangabad | Aurangabad | CC003000000000007 | 2017 | Oct | Complete | Y | Y | 1 |
CC003000000000008 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC003000000000017 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC003000000000018 | 2018 | May | Complete | Y | Y | 1 | ||||
CC003000000000021 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC003000000000026 | 2018 | Jul | Complete | Y | Y | 1 | ||||
SUNDER SIDDHI Total | 6 | |||||||||
UNIVERSAL ENTERPRISES | P51500011995 | Aurangabad | Aurangabad | CC003000000000027 | 2018 | Aug | Complete | Y | Y | 1 |
CC003000000000028 | 2018 | Aug | Complete | N | N | 1 | ||||
CC003000000000029 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000030 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000031 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000032 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000033 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000034 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000035 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000036 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000037 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000041 | 2018 | Sep | Complete | N | N | 1 | ||||
CC003000000000043 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC003000000000044 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC003000000000045 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC003000000000046 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC003000000000047 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC003000000010064 | 2020 | Feb | Complete | N | N | 1 | ||||
CC003000000010065 | 2020 | Feb | Complete | N | N | 1 | ||||
UNIVERSAL ENTERPRISES Total | 19 | |||||||||
Vishwa Developers | P51500010410 | Aurangabad | Aurangabad | CC003000000010085 | 2021 | Sep | Hearing Schedule | N | N | 1 |
Vishwa Developers Total | 1 | |||||||||
Grand Total | 52 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
A A Estates Pvt Ltd | P51800004643 | Konkan | Mumbai Suburban | CC006000000000268 | 2018 | Feb | Complete | N | N | 1 |
CC006000000055294 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000078291 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000079039 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079044 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089660 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100354 | 2019 | Sep | Complete | N | N | 1 | ||||
P51800004918 | Konkan | Mumbai Suburban | CC006000000054819 | 2018 | Jun | Complete | N | N | 1 | |
P51800005826 | Konkan | Mumbai Suburban | CC006000000044525 | 2018 | May | Complete | N | N | 1 | |
CC006000000044526 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054635 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054639 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054680 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000054699 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000054775 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054799 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054896 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054909 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054992 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000055088 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000055099 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055102 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055105 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055109 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055123 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000055158 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055172 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055174 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055176 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055182 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055288 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055292 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055358 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055360 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055361 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055489 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055509 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055523 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055633 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055674 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055801 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055942 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055946 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000056144 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000056180 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056181 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000057356 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078870 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000194258 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194394 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194622 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000194636 | 2020 | Nov | Pending | N | N | 1 | ||||
A A Estates Pvt Ltd Total | 52 | |||||||||
A J OM ENTERPRISES | P51700004721 | Konkan | Thane | CC006000000197422 | 2021 | Jun | Hearing Schedule | N | N | 1 |
A J OM ENTERPRISES Total | 1 | |||||||||
A K DEVELOPERS | P52000008553 | Konkan | Raigarh | CC006000000110650 | 2019 | Aug | Complete | N | N | 1 |
CC006000000110656 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110664 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110665 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110666 | 2019 | Aug | Complete | N | N | 1 | ||||
A K DEVELOPERS Total | 5 | |||||||||
A PLUS DEVELOPERS | P52000009823 | Konkan | Raigarh | CC006000000100428 | 2019 | Aug | Complete | N | N | 1 |
A PLUS DEVELOPERS Total | 1 | |||||||||
AADI DEVELOPERS | P51700003336 | Konkan | Thane | CC006000000199257 | 2021 | Dec | Hearing Schedule | N | N | 1 |
AADI DEVELOPERS Total | 1 | |||||||||
AADI PROPERTIES LLP | P51800008521 | Konkan | Mumbai Suburban | CC006000000058106 | 2019 | Feb | Complete | N | N | 1 |
CC006000000078820 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089694 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000192196 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000194362 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194731 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194732 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000197690 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000198521 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
AADI PROPERTIES LLP Total | 9 | |||||||||
Aadinath Builders and Developers | P52000000187 | Konkan | Raigarh | CC006000000194101 | 2020 | Sep | Pending | N | N | 1 |
Aadinath Builders and Developers Total | 1 | |||||||||
AADINATH DEVELOPERS | P51900015259 | Konkan | Mumbai City | CC006000000044445 | 2018 | May | Complete | Y | N | 1 |
CC006000000194879 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194888 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194889 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194891 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
AADINATH DEVELOPERS Total | 5 | |||||||||
Aakaar Tanishq Nirmaan J. V. | P51900006567 | Konkan | Mumbai City | CC006000000023938 | 2018 | Mar | Complete | N | N | 1 |
Aakaar Tanishq Nirmaan J. V. Total | 1 | |||||||||
AAKAR CONSTRUCTIONS | P51800003282 | Konkan | Mumbai Suburban | CC006000000055478 | 2018 | Jul | Complete | N | N | 1 |
AAKAR CONSTRUCTIONS Total | 1 | |||||||||
AAKASH BUILDERS & DEVELOPERS | P51700011846 | Konkan | Thane | CC006000000192936 | 2020 | Mar | Hearing Schedule | N | N | 1 |
CC006000000195193 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195356 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195388 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000197967 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
AAKASH BUILDERS & DEVELOPERS Total | 5 | |||||||||
AALAY DEVELOPERS | P51900004114 | Konkan | Mumbai City | CC006000000197023 | 2021 | May | Hearing Schedule | N | N | 1 |
AALAY DEVELOPERS Total | 1 | |||||||||
AANYA REALTORS | P51700005912 | Konkan | Thane | CC006000000000227 | 2017 | Aug | Complete | Y | Y | 1 |
CC006000000055705 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055708 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055773 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000056343 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056564 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000056660 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057965 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000079201 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000182036 | 2019 | Dec | Complete | N | N | 1 | ||||
P51700006040 | Konkan | Thane | CC006000000001409 | 2017 | Oct | Complete | Y | Y | 1 | |
CC006000000044227 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000055063 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055379 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000089967 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000141077 | 2019 | Oct | Complete | N | N | 1 | ||||
AANYA REALTORS Total | 16 | |||||||||
AANYA RESIDENCES | P51700011065 | Konkan | Thane | CC006000000000378 | 2017 | Sep | Complete | N | N | 1 |
CC006000000055068 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000193291 | 2020 | Jun | Complete | N | N | 1 | ||||
CC006000000194037 | 2020 | Sep | Complete | N | N | 1 | ||||
P51700014064 | Konkan | Thane | CC006000000055064 | 2018 | Aug | Complete | N | N | 1 | |
CC006000000161294 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
AANYA RESIDENCES Total | 6 | |||||||||
AAP Realtors Ltd. | P51800004278 | Konkan | Mumbai Suburban | CC006000000000924 | 2017 | Sep | Complete | N | N | 1 |
CC006000000022984 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000055694 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000056686 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000197298 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197373 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197435 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000198308 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198309 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
AAP Realtors Ltd. Total | 9 | |||||||||
AAradhya Landmarks & Infra Pvt. Ltd. | P52900010548 | Konkan | Sindhudurg | CC006000000182014 | 2019 | Dec | Complete | N | N | 1 |
AAradhya Landmarks & Infra Pvt. Ltd. Total | 1 | |||||||||
AARIAASH DEVELOPERS | P51900005993 | Konkan | Mumbai City | CC006000000057392 | 2018 | Dec | Complete | N | N | 1 |
AARIAASH DEVELOPERS Total | 1 | |||||||||
Aaryadeep Builders & Developers | P51700006499 | Konkan | Mumbai Suburban | CC006000000056559 | 2018 | Oct | Complete | Y | N | 1 |
CC006000000057863 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000194964 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194972 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195667 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195730 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
Aaryadeep Builders & Developers Total | 6 | |||||||||
aasanghar construction | P51700012086 | Konkan | Thane | CC006000000055993 | 2018 | Aug | Complete | N | N | 1 |
CC006000000055994 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055997 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056001 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056003 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056006 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056007 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056008 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056009 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056010 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000078513 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078514 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078516 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078518 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078519 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078520 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078521 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078522 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078523 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078527 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078528 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078546 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078547 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078548 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078550 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078552 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078554 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078555 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078558 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078560 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078562 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078563 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078564 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078622 | 2019 | Mar | Complete | N | N | 1 | ||||
aasanghar construction Total | 34 | |||||||||
AASANJO AMBER | P51700012721 | Konkan | Thane | CC006000000100321 | 2019 | Jul | Complete | N | N | 1 |
AASANJO AMBER Total | 1 | |||||||||
AASHRAY DEVELOPERS | P51700010653 | Konkan | Thane | CC006000000022811 | 2018 | Jan | Complete | N | N | 1 |
CC006000000022812 | 2018 | Jan | Complete | N | N | 1 | ||||
AASHRAY DEVELOPERS Total | 2 | |||||||||
AASTHA ASSOCIATES | P51900016659 | Konkan | Mumbai City | CC006000000079244 | 2019 | May | Complete | N | N | 1 |
AASTHA ASSOCIATES Total | 1 | |||||||||
AATMAY REALTORS | P52000011324 | Konkan | Raigarh | CC006000000141024 | 2019 | Sep | Complete | N | N | 1 |
AATMAY REALTORS Total | 1 | |||||||||
Aayush Developers | P51800002056 | Konkan | Mumbai Suburban | CC006000000195915 | 2021 | Feb | Hearing Schedule | N | N | 1 |
Aayush Developers Total | 1 | |||||||||
ABHAY BUILDERS | P51700012936 | Konkan | Thane | CC006000000000570 | 2017 | Sep | Complete | N | N | 1 |
CC006000000012117 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000023826 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044356 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000197638 | 2021 | Jul | Pending | N | N | 1 | ||||
ABHAY BUILDERS Total | 5 | |||||||||
ABHAY YASHWANT THITE | P99000007407 | Konkan | Palghar | CC006000000023086 | 2018 | Jan | Complete | N | N | 1 |
CC006000000057073 | 2018 | Nov | Complete | Y | N | 1 | ||||
ABHAY YASHWANT THITE Total | 2 | |||||||||
ABHIGNA ENTERPRISES | P51800007245 | Konkan | Mumbai Suburban | CC006000000198858 | 2021 | Oct | Pending | N | N | 1 |
ABHIGNA ENTERPRISES Total | 1 | |||||||||
ABHIJEET MADHUKAR KADAM | P51800009817 | Konkan | Mumbai Suburban | CC006000000199092 | 2021 | Nov | Hearing Schedule | N | N | 1 |
ABHIJEET MADHUKAR KADAM Total | 1 | |||||||||
Abhishek Consttruction Co | P51700003360 | Konkan | Thane | CC006000000012574 | 2017 | Dec | Complete | N | N | 1 |
CC006000000078318 | 2019 | Mar | Complete | Y | N | 1 | ||||
Abhishek Consttruction Co Total | 2 | |||||||||
Accanoor Associates | P51800007994 | Konkan | Mumbai Suburban | CC006000000197989 | 2021 | Aug | Pending | N | N | 1 |
P51900007718 | Konkan | Mumbai City | CC006000000078850 | 2019 | Apr | Complete | N | N | 1 | |
Accanoor Associates Total | 2 | |||||||||
Accord Builders | P51800005985 | Konkan | Mumbai Suburban | CC006000000000440 | 2017 | Sep | Complete | N | N | 1 |
CC006000000012448 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000044212 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044213 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044214 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044215 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000055024 | 2018 | Jun | Complete | N | N | 1 | ||||
P51800009440 | Konkan | Mumbai Suburban | CC006000000022809 | 2018 | Jan | Complete | Y | N | 1 | |
CC006000000056645 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000089889 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089989 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000100402 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000100484 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000110774 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000110865 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000161299 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000193560 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193766 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000193786 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000194759 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000194887 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195808 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000195983 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196143 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196988 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
Accord Builders Total | 25 | |||||||||
Ace Property Developers | P99000011832 | Konkan | Palghar | CC006000000197912 | 2021 | Aug | Pending | N | N | 1 |
CC006000000198392 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
Ace Property Developers Total | 2 | |||||||||
Acme Avenue Infrastructure Pvt. Ltd. | P51800000777 | Konkan | Mumbai Suburban | CC006000000120986 | 2019 | Sep | Hearing Schedule | N | N | 1 |
CC006000000161246 | 2019 | Oct | Complete | N | N | 1 | ||||
Acme Avenue Infrastructure Pvt. Ltd. Total | 2 | |||||||||
Acme Housing India Private Limited | P51700000778 | Konkan | Thane | CC006000000078600 | 2019 | Apr | Complete | Y | Y | 1 |
CC006000000079085 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000100395 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000192582 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000193084 | 2020 | Jun | Complete | Y | N | 1 | ||||
P51700001033 | Konkan | Thane | CC006000000056503 | 2018 | Oct | Complete | N | N | 1 | |
CC006000000193980 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198662 | 2021 | Oct | Pending | N | N | 1 | ||||
P51700001038 | Konkan | Thane | CC006000000000680 | 2017 | Sep | Complete | N | N | 1 | |
CC006000000192621 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000198686 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000198782 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198838 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198839 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198841 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198842 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198869 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198894 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198964 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198974 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199040 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199078 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000199256 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199273 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199322 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209417 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
P51700010837 | Konkan | Thane | CC006000000000961 | 2017 | Sep | Complete | N | N | 1 | |
P51700010925 | Konkan | Thane | CC006000000000594 | 2017 | Sep | Complete | N | N | 1 | |
P51800001238 | Konkan | Mumbai Suburban | CC006000000055022 | 2018 | Jun | Complete | N | N | 1 | |
CC006000000056713 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056734 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056770 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000057410 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000058121 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000089896 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000110779 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141017 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000192948 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192949 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192952 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192954 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192956 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193427 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000195340 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000197071 | 2021 | May | Complete | N | N | 1 | ||||
CC006000000209421 | 2021 | Dec | Pending | N | N | 1 | ||||
Acme Housing India Private Limited Total | 46 | |||||||||
Acme Realties Private Limited | P51800001690 | Konkan | Mumbai Suburban | CC006000000195224 | 2020 | Dec | Pending | N | N | 1 |
CC006000000196123 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000198314 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198343 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
P51800002133 | Konkan | Mumbai Suburban | CC006000000012454 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000089917 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000197220 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197259 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000198174 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198379 | 2021 | Sep | Pending | N | N | 1 | ||||
Acme Realties Private Limited Total | 10 | |||||||||
Acropolis infrastructure development | P99000010537 | Konkan | Palghar | CC006000000000967 | 2017 | Oct | Complete | N | N | 1 |
CC006000000056171 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000057043 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000058143 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000192916 | 2020 | Mar | Complete | N | N | 1 | ||||
Acropolis infrastructure development Total | 5 | |||||||||
ADANI ESTATES PRIVATE LIMITED | P51800001290 | Konkan | Mumbai Suburban | CC006000000000262 | 2017 | Aug | Complete | N | N | 1 |
CC006000000055117 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055187 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055189 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055198 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055212 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055257 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055260 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055265 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055272 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055286 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055301 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055479 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056094 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056395 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056408 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056865 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057368 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000089768 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000195776 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000196252 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196357 | 2021 | Mar | Complete | N | N | 1 | ||||
ADANI ESTATES PRIVATE LIMITED Total | 22 | |||||||||
ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED | P51800005832 | Konkan | Mumbai Suburban | CC006000000055134 | 2018 | Jun | Complete | N | N | 1 |
CC006000000055215 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055227 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055926 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000056307 | 2018 | Oct | Complete | Y | N | 1 | ||||
CC006000000057084 | 2018 | Nov | Complete | Y | N | 1 | ||||
CC006000000110795 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000197489 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED Total | 8 | |||||||||
ADCON INFRASTRUCTURE | P51800012085 | Konkan | Mumbai Suburban | CC006000000012457 | 2018 | Jan | Complete | Y | Y | 1 |
ADCON INFRASTRUCTURE Total | 1 | |||||||||
Adhiraj Constructions Private Limited | P52000003039 | Konkan | Raigarh | CC006000000001996 | 2017 | Nov | Complete | N | N | 1 |
CC006000000012167 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000196665 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
P52000004493 | Konkan | Raigarh | CC006000000194735 | 2020 | Oct | Hearing Schedule | N | N | 1 | |
P52000007539 | Konkan | Raigarh | CC006000000001515 | 2018 | Jan | Complete | N | N | 1 | |
CC006000000197820 | 2021 | Jul | Pending | N | N | 1 | ||||
P52000014859 | Konkan | Raigarh | CC006000000199023 | 2021 | Nov | Hearing Schedule | N | N | 1 | |
P52000022907 | Konkan | Raigarh | CC006000000195934 | 2021 | Feb | Complete | N | N | 1 | |
P52000022975 | Konkan | Raigarh | CC006000000196279 | 2021 | Mar | Hearing Schedule | N | N | 1 | |
Adhiraj Constructions Private Limited Total | 9 | |||||||||
ADINATH DEVELOPERS | P99000024787 | Konkan | Palghar | CC006000000196719 | 2021 | Apr | Hearing Schedule | N | N | 1 |
CC006000000197647 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
ADINATH DEVELOPERS Total | 2 | |||||||||
ADINATH ENTERPRISE | P51800003448 | Konkan | Mumbai Suburban | CC006000000055778 | 2018 | Aug | Complete | Y | Y | 1 |
ADINATH ENTERPRISE Total | 1 | |||||||||
ADITYA DEVELOPERS | P51800007177 | Konkan | Mumbai Suburban | CC006000000089778 | 2019 | Jun | Hearing Schedule | N | N | 1 |
CC006000000089823 | 2019 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000089865 | 2019 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000090145 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000100508 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000209523 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209531 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209533 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209534 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209564 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209802 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209803 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209805 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209806 | 2022 | Jan | Pending | N | N | 1 | ||||
P51800007179 | Konkan | Mumbai Suburban | CC006000000056526 | 2018 | Oct | Complete | N | N | 1 | |
CC006000000056529 | 2018 | Oct | Complete | N | N | 1 | ||||
P51800007224 | Konkan | Mumbai Suburban | CC006000000198716 | 2021 | Oct | Pending | N | N | 1 | |
CC006000000198717 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000198718 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198719 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198720 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000199288 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199289 | 2021 | Dec | Pending | N | N | 1 | ||||
P51800007225 | Konkan | Mumbai Suburban | CC006000000171635 | 2019 | Nov | Hearing Schedule | N | N | 1 | |
CC006000000171919 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195460 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
P51800007227 | Konkan | Mumbai Suburban | CC006000000194341 | 2020 | Oct | Pending | N | N | 1 | |
P51800007346 | Konkan | Mumbai Suburban | CC006000000055235 | 2018 | Jul | Complete | N | N | 1 | |
CC006000000056184 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000056188 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000056189 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000056210 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056220 | 2018 | Sep | Complete | N | N | 1 | ||||
P51800009323 | Konkan | Mumbai Suburban | CC006000000193072 | 2020 | Mar | Hearing Schedule | N | N | 1 | |
ADITYA DEVELOPERS Total | 34 | |||||||||
Aditya Enterprise | P51800004821 | Konkan | Mumbai Suburban | CC006000000141118 | 2019 | Oct | Complete | N | N | 1 |
Aditya Enterprise Total | 1 | |||||||||
ADITYA ENTERPRISES | P51700015954 | Konkan | Thane | CC006000000090012 | 2019 | Jul | Complete | Y | N | 1 |
P51800009006 | Konkan | Mumbai Suburban | CC006000000001580 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000023311 | 2018 | Feb | Complete | Y | Y | 1 | ||||
P51800013097 | Konkan | Mumbai Suburban | CC006000000056485 | 2018 | Oct | Complete | N | N | 1 | |
P52000019274 | Konkan | Raigarh | CC006000000193023 | 2020 | Mar | Hearing Schedule | N | N | 1 | |
CC006000000196447 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196795 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
ADITYA ENTERPRISES Total | 7 | |||||||||
Admire Revive Builder & Developer | P51800002086 | Konkan | Mumbai Suburban | CC006000000022866 | 2018 | Aug | Complete | N | N | 1 |
CC006000000056257 | 2018 | Sep | Complete | Y | N | 1 | ||||
Admire Revive Builder & Developer Total | 2 | |||||||||
ADVENT DEVELOPERS PRIVATE LIMITED | P51800002649 | Konkan | Mumbai Suburban | CC006000000192125 | 2020 | Feb | Complete | N | N | 1 |
ADVENT DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
AGARWAL BUILDERS | P99000003833 | Konkan | Palghar | CC006000000012038 | 2017 | Nov | Complete | N | N | 1 |
AGARWAL BUILDERS Total | 1 | |||||||||
Agile Real Estate Pvt. Ltd. | P51700000635 | Konkan | Thane | CC006000000100579 | 2019 | Aug | Complete | N | N | 1 |
P51700000640 | Konkan | Thane | CC006000000078279 | 2019 | Feb | Complete | N | N | 1 | |
CC006000000078296 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000100411 | 2019 | Aug | Complete | N | N | 1 | ||||
P51700000732 | Konkan | Thane | CC006000000196863 | 2021 | Apr | Hearing Schedule | N | N | 1 | |
CC006000000209510 | 2021 | Dec | Pending | N | N | 1 | ||||
P51700000927 | Konkan | Thane | CC006000000044179 | 2018 | May | Complete | N | N | 1 | |
P51700001039 | Konkan | Thane | CC006000000054962 | 2018 | Jul | Complete | N | N | 1 | |
P51700001040 | Konkan | Thane | CC006000000012394 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000012551 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000078377 | 2019 | Mar | Complete | N | N | 1 | ||||
P51700001083 | Konkan | Thane | CC006000000100231 | 2019 | Jul | Complete | N | N | 1 | |
P51700001278 | Konkan | Thane | CC006000000012249 | 2017 | Dec | Complete | N | N | 1 | |
Agile Real Estate Pvt. Ltd. Total | 13 | |||||||||
AHIMSA BUILDER | P51800007486 | Konkan | Mumbai Suburban | CC006000000023643 | 2018 | May | Complete | N | N | 1 |
CC006000000057755 | 2019 | Jan | Complete | N | N | 1 | ||||
AHIMSA BUILDER Total | 2 | |||||||||
AIBANI ENTERPRISE | P51800009415 | Konkan | Mumbai Suburban | CC006000000022885 | 2018 | Feb | Complete | N | N | 1 |
CC006000000022927 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000022929 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000022949 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000022950 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000090169 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000100184 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000193089 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193090 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193091 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193092 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193093 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193094 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193095 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193096 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193097 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193098 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193099 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193104 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193105 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193106 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193107 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193109 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193110 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193119 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193121 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193122 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193123 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193124 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193125 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
AIBANI ENTERPRISE Total | 30 | |||||||||
AIMS PROMOTERS PVT LTD | P51700004956 | Konkan | Thane | CC006000000044138 | 2018 | Apr | Complete | N | N | 1 |
CC006000000044175 | 2018 | Apr | Complete | Y | N | 1 | ||||
CC006000000044290 | 2018 | Apr | Complete | Y | N | 1 | ||||
CC006000000044359 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000044361 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000044397 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054704 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054761 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054871 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054877 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000194922 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
AIMS PROMOTERS PVT LTD Total | 11 | |||||||||
Aishwarya Avant Builders LLP | P51800009299 | Konkan | Mumbai Suburban | CC006000000057111 | 2019 | Jan | Complete | N | N | 1 |
CC006000000078221 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000079406 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089666 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000090049 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000110796 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000110862 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000161270 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000171946 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000194255 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195467 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195761 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000196933 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197316 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
P51800015537 | Konkan | Mumbai Suburban | CC006000000171648 | 2019 | Nov | Complete | N | N | 1 | |
CC006000000192629 | 2020 | Feb | Pending | N | N | 1 | ||||
Aishwarya Avant Builders LLP Total | 16 | |||||||||
AISHWARYA LIGHT CONSTRUCTION COMPANY | P51800006084 | Konkan | Mumbai Suburban | CC006000000141152 | 2019 | Oct | Complete | N | N | 1 |
AISHWARYA LIGHT CONSTRUCTION COMPANY Total | 1 | |||||||||
AJANTA AIRAVAT INFRASTRUCTURE LIMITED LIABILITY PARTNERSHIP | P51800013296 | Konkan | Mumbai Suburban | CC006000000012116 | 2017 | Dec | Complete | N | N | 1 |
CC006000000023950 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000044182 | 2018 | Apr | Complete | Y | N | 1 | ||||
CC006000000192876 | 2020 | Apr | Complete | N | N | 1 | ||||
CC006000000195489 | 2021 | Jan | Complete | N | N | 1 | ||||
AJANTA AIRAVAT INFRASTRUCTURE LIMITED LIABILITY PARTNERSHIP Total | 5 | |||||||||
Ajanta Karmvir Constructions LLP | P51800005894 | Konkan | Mumbai Suburban | CC006000000100617 | 2019 | Aug | Complete | Y | N | 1 |
Ajanta Karmvir Constructions LLP Total | 1 | |||||||||
AJAY MADHUKAR THANEKAR | P51700000644 | Konkan | Thane | CC006000000056127 | 2018 | Sep | Complete | N | N | 1 |
AJAY MADHUKAR THANEKAR Total | 1 | |||||||||
AJAY SITARAM SURVE | P51800013678 | Konkan | Mumbai Suburban | CC006000000057625 | 2019 | Jan | Complete | N | N | 1 |
CC006000000193334 | 2020 | Jun | Complete | N | N | 1 | ||||
AJAY SITARAM SURVE Total | 2 | |||||||||
AJAYRAJ REALTORS PVT LTD | P99000007945 | Konkan | Palghar | CC006000000000531 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000571 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000023313 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000055191 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056199 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000057216 | 2018 | Dec | Complete | Y | Y | 1 | ||||
CC006000000057467 | 2018 | Dec | Complete | Y | N | 1 | ||||
CC006000000057503 | 2019 | Jan | Complete | Y | Y | 1 | ||||
CC006000000058052 | 2019 | Feb | Complete | Y | Y | 1 | ||||
CC006000000079252 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079256 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079281 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079283 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079288 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089515 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089645 | 2019 | Jun | Complete | Y | Y | 1 | ||||
CC006000000089716 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000090045 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090115 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090117 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090118 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000161371 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161438 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000161441 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000192151 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192152 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192173 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192197 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192199 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192207 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000194049 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
P99000012864 | Konkan | Palghar | CC006000000078301 | 2019 | Feb | Complete | N | N | 1 | |
CC006000000078928 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000195177 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000197552 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197576 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198788 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198798 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000209401 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
AJAYRAJ REALTORS PVT LTD Total | 39 | |||||||||
Ajit Shreenath Singh | P52000023683 | Konkan | Raigarh | CC006000000193223 | 2020 | Jul | Complete | N | N | 1 |
CC006000000193267 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193350 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193402 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193407 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193418 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193420 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193428 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193432 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193433 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193434 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193437 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193438 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193439 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193441 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193443 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193449 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193450 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193452 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193455 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193456 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193460 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193461 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193463 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193464 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193473 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193509 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193521 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193528 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193533 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193537 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193541 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000198827 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000198828 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000198831 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000198832 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000199108 | 2021 | Nov | Complete | N | N | 1 | ||||
CC006000000199179 | 2021 | Nov | Complete | N | N | 1 | ||||
Ajit Shreenath Singh Total | 38 | |||||||||
Ajitsingh Shreenath Singh | P52000009146 | Konkan | Raigarh | CC006000000196536 | 2021 | Mar | Hearing Schedule | N | N | 1 |
Ajitsingh Shreenath Singh Total | 1 | |||||||||
Ajmera Realty & Infra India Ltd. | P51800000776 | Konkan | Mumbai Suburban | CC006000000089828 | 2019 | Jun | Complete | N | N | 1 |
CC006000000198058 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Ajmera Realty & Infra India Ltd. Total | 2 | |||||||||
AJS DEVELOPERS | P51900004629 | Konkan | Mumbai City | CC006000000192997 | 2020 | Apr | Hearing Schedule | N | N | 1 |
AJS DEVELOPERS Total | 1 | |||||||||
Akar Creations Private Limited | P51800010382 | Konkan | Mumbai Suburban | CC006000000171727 | 2019 | Nov | Complete | N | N | 1 |
Akar Creations Private Limited Total | 1 | |||||||||
Akruti GM Joint Venture | P51800009175 | Konkan | Mumbai Suburban | CC006000000055382 | 2018 | Jul | Complete | N | N | 1 |
CC006000000057122 | 2018 | Dec | Complete | N | N | 1 | ||||
Akruti GM Joint Venture Total | 2 | |||||||||
Akshar Developers | P51700009578 | Konkan | Thane | CC006000000012602 | 2018 | Jan | Complete | N | N | 1 |
CC006000000056816 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057203 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000192235 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000194421 | 2020 | Oct | Pending | N | N | 1 | ||||
Akshar Developers Total | 5 | |||||||||
AKSHAR SHANTI REALTORS PRIVATE LIMITED | P51700006296 | Konkan | Thane | CC006000000197036 | 2021 | Nov | Hearing Schedule | N | N | 1 |
CC006000000197092 | 2021 | May | Complete | N | N | 1 | ||||
CC006000000197864 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
AKSHAR SHANTI REALTORS PRIVATE LIMITED Total | 3 | |||||||||
AKSHAR SPACE PVT LTD | P51700003889 | Konkan | Thane | CC006000000000089 | 2017 | Sep | Complete | Y | Y | 1 |
CC006000000000733 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000870 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000950 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000977 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000985 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000987 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000001014 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001092 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000001294 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000001407 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001573 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001581 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001586 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001597 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001720 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000001737 | 2017 | Dec | Complete | Y | Y | 1 | ||||
CC006000000012669 | 2017 | Dec | Complete | Y | Y | 1 | ||||
CC006000000012750 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000012758 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000022905 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000022920 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000022978 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000023649 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000023844 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000023859 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023869 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000023880 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000023887 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000054663 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000054816 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054837 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054842 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054969 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054976 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054995 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000055000 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000055006 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000055015 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000055144 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055254 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055331 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055342 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055404 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055418 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055426 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055452 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055476 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055516 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055774 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000056364 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000056366 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000057099 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057103 | 2018 | Nov | Complete | Y | N | 1 | ||||
CC006000000057112 | 2018 | Nov | Complete | Y | N | 1 | ||||
CC006000000057363 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078624 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078630 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000089795 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100458 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100580 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000110676 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000171806 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000192263 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192719 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000193026 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000195420 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196424 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196427 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196821 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000198071 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198320 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
AKSHAR SPACE PVT LTD Total | 72 | |||||||||
AKSHAY GRUHPRAVESH LLP | P51800000487 | Konkan | Mumbai Suburban | CC006000000054818 | 2018 | Jun | Complete | N | N | 1 |
AKSHAY GRUHPRAVESH LLP Total | 1 | |||||||||
Akshay Sthapatya H.S.A. | P51800004991 | Konkan | Mumbai Suburban | CC006000000000717 | 2017 | Sep | Complete | Y | Y | 1 |
CC006000000001392 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000057525 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078911 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079022 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000141113 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000195936 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000198482 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Akshay Sthapatya H.S.A. Total | 8 | |||||||||
AKSHAY STHAPATYA PVT. LTD. | P51900005352 | Konkan | Mumbai City | CC006000000001911 | 2017 | Nov | Complete | N | N | 1 |
AKSHAY STHAPATYA PVT. LTD. Total | 1 | |||||||||
AL - RAHBAR CONSTRUCTION | P51700018514 | Konkan | Thane | CC006000000056931 | 2020 | Feb | Complete | N | N | 1 |
AL - RAHBAR CONSTRUCTION Total | 1 | |||||||||
ALF DEVELOPERS | P51900010150 | Konkan | Mumbai City | CC006000000023740 | 2018 | Apr | Complete | N | N | 1 |
ALF DEVELOPERS Total | 1 | |||||||||
ALFA ENTERPRISES | P51700009447 | Konkan | Thane | CC006000000057096 | 2018 | Dec | Complete | N | N | 1 |
CC006000000057322 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057327 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057346 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057364 | 2018 | Dec | Complete | N | N | 1 | ||||
P51700010237 | Konkan | Thane | CC006000000197040 | 2021 | May | Hearing Schedule | N | N | 1 | |
P51700024240 | Konkan | Thane | CC006000000197039 | 2021 | May | Hearing Schedule | N | N | 1 | |
ALFA ENTERPRISES Total | 7 | |||||||||
ALLIANCE REALTY | P51700009468 | Konkan | Thane | CC006000000195225 | 2020 | Dec | Hearing Schedule | N | N | 1 |
ALLIANCE REALTY Total | 1 | |||||||||
ALTAA BUIILDERS | P51800010872 | Konkan | Mumbai Suburban | CC006000000057643 | 2019 | Jan | Hearing Schedule | N | N | 1 |
CC006000000209621 | 2022 | Jan | Pending | N | N | 1 | ||||
ALTAA BUIILDERS Total | 2 | |||||||||
AMAR ENTERPRISES | P51800011527 | Konkan | Mumbai Suburban | CC006000000057022 | 2018 | Nov | Complete | N | N | 1 |
AMAR ENTERPRISES Total | 1 | |||||||||
AMARDEEP CONSTRUCTIONS | P51800006653 | Konkan | Mumbai Suburban | CC006000000193396 | 2020 | Jul | Complete | Y | N | 1 |
CC006000000193397 | 2020 | Jul | Complete | Y | N | 1 | ||||
CC006000000198895 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198896 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198898 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198899 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198906 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198908 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198909 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198924 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198925 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198927 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198928 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198933 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198934 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198935 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198937 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
AMARDEEP CONSTRUCTIONS Total | 17 | |||||||||
AMAZON MANA & ASSOCIATES AOP | P51800006074 | Konkan | Mumbai Suburban | CC006000000058079 | 2019 | Feb | Complete | N | N | 1 |
CC006000000192881 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000194417 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000196385 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
AMAZON MANA & ASSOCIATES AOP Total | 4 | |||||||||
AMBALAL BHANJI GAMI | P51700017119 | Konkan | Thane | CC006000000194834 | 2020 | Nov | Hearing Schedule | N | N | 1 |
AMBALAL BHANJI GAMI Total | 1 | |||||||||
Ambika Brickwell LLP | P51700008966 | Konkan | Thane | CC006000000171889 | 2019 | Dec | Complete | N | N | 1 |
Ambika Brickwell LLP Total | 1 | |||||||||
AMEX DEVELOPERS PVT. LTD., | P51900009319 | Konkan | Mumbai City | CC006000000044208 | 2018 | Apr | Complete | N | N | 1 |
AMEX DEVELOPERS PVT. LTD., Total | 1 | |||||||||
Amisha Associates | P51700010847 | Konkan | Thane | CC006000000090157 | 2019 | Aug | Complete | N | N | 1 |
CC006000000100554 | 2019 | Aug | Complete | N | N | 1 | ||||
Amisha Associates Total | 2 | |||||||||
AMKB BUILDER AND DEVELOPERS | P99000012845 | Konkan | Palghar | CC006000000054830 | 2018 | Jun | Complete | Y | Y | 1 |
AMKB BUILDER AND DEVELOPERS Total | 1 | |||||||||
ANANTNATH DEVELOPERS | P51700002966 | Konkan | Thane | CC006000000161422 | 2019 | Nov | Complete | N | N | 1 |
P51700008885 | Konkan | Thane | CC006000000100323 | 2019 | Jul | Complete | N | N | 1 | |
ANANTNATH DEVELOPERS Total | 2 | |||||||||
Anaya Infrastructure Pvt. Ltd. | P51800001504 | Konkan | Mumbai Suburban | CC006000000001393 | 2017 | Dec | Complete | N | N | 1 |
Anaya Infrastructure Pvt. Ltd. Total | 1 | |||||||||
ANGEL CONSTRUCTION COMPANY | P51800032085 | Konkan | Mumbai Suburban | CC006000000209481 | 2021 | Dec | Hearing Schedule | N | N | 1 |
ANGEL CONSTRUCTION COMPANY Total | 1 | |||||||||
ANI ANU DEVELOPERS PRIVATE LIMITED | P51800006089 | Konkan | Mumbai Suburban | CC006000000193650 | 2020 | Aug | Hearing Schedule | N | N | 1 |
ANI ANU DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
Anil Arora | P51800005593 | Konkan | Mumbai Suburban | CC006000000193680 | 2020 | Aug | Hearing Schedule | N | N | 1 |
Anil Arora Total | 1 | |||||||||
Anil Ramrao Naik | P51900011122 | Konkan | Mumbai City | CC006000000055591 | 2018 | Jul | Complete | Y | Y | 1 |
CC006000000055592 | 2018 | Jul | Complete | Y | Y | 1 | ||||
Anil Ramrao Naik Total | 2 | |||||||||
ANIL thakurdas kursija | P51700008216 | Konkan | Thane | CC006000000001725 | 2017 | Nov | Complete | N | N | 1 |
CC006000000012719 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023340 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023409 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023752 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000044235 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000055407 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055647 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056441 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000057954 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000192271 | 2020 | Jan | Complete | N | N | 1 | ||||
P51700008758 | Konkan | Thane | CC006000000000210 | 2017 | Aug | Complete | N | N | 1 | |
CC006000000000785 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000001823 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000044150 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000055202 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055438 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055453 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055571 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000090165 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090166 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090170 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000196341 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000197635 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
P51700016602 | Konkan | Thane | CC006000000055844 | 2018 | Aug | Complete | Y | N | 1 | |
CC006000000057837 | 2019 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000089613 | 2019 | Jun | Complete | Y | N | 1 | ||||
CC006000000193207 | 2020 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197748 | 2021 | Jul | Pending | N | N | 1 | ||||
ANIL thakurdas kursija Total | 29 | |||||||||
Aniline Construction Company Private Limited | P51700007024 | Konkan | Thane | CC006000000197644 | 2021 | Jul | Hearing Schedule | N | N | 1 |
Aniline Construction Company Private Limited Total | 1 | |||||||||
Aniline Properties Private Limited | P51800003202 | Konkan | Mumbai Suburban | CC006000000055935 | 2018 | Sep | Complete | N | N | 1 |
CC006000000057949 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000079185 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079187 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000141104 | 2019 | Oct | Complete | N | N | 1 | ||||
Aniline Properties Private Limited Total | 5 | |||||||||
Anis Yakub Khan | P51800005115 | Konkan | Mumbai Suburban | CC006000000001609 | 2018 | Jan | Complete | Y | Y | 1 |
CC006000000090128 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000090129 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000090131 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000090132 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000090133 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000090137 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000090143 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000090147 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000110724 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000193241 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195879 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195880 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195883 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195885 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195889 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195893 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000196772 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
Anis Yakub Khan Total | 18 | |||||||||
Anjali Anil Patil | P99000028110 | Konkan | Palghar | CC006000000198511 | 2021 | Sep | Hearing Schedule | N | N | 1 |
Anjali Anil Patil Total | 1 | |||||||||
ANJANA SAHEBRAO CHAVAN | P51700003329 | Konkan | Thane | CC006000000141207 | 2019 | Nov | Hearing Schedule | N | N | 1 |
ANJANA SAHEBRAO CHAVAN Total | 1 | |||||||||
ANKIT ARVIND DHARIYA | P52000013074 | Konkan | Raigarh | CC006000000209799 | 2022 | Jan | Pending | N | N | 1 |
ANKIT ARVIND DHARIYA Total | 1 | |||||||||
Ankit Overseas | P51800002495 | Konkan | Mumbai Suburban | CC006000000078871 | 2019 | Apr | Complete | N | N | 1 |
Ankit Overseas Total | 1 | |||||||||
ANKUR SHUBHAM DEVELOPERS | P51800006885 | Konkan | Mumbai Suburban | CC006000000057766 | 2019 | Jan | Complete | N | N | 1 |
ANKUR SHUBHAM DEVELOPERS Total | 1 | |||||||||
ANMOL ALLIANCE | P51800004209 | Konkan | Mumbai Suburban | CC006000000023100 | 2018 | Jan | Complete | N | N | 1 |
CC006000000044442 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000090029 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090030 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090031 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090032 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090033 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090034 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090035 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090036 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000110662 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000161276 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000181966 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000193667 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000198473 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198474 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198475 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198478 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198479 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198509 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198510 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198522 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
ANMOL ALLIANCE Total | 22 | |||||||||
Antariksh Infraprojects LLP | P51800000903 | Konkan | Mumbai Suburban | CC006000000089616 | 2019 | Jun | Complete | N | N | 1 |
Antariksh Infraprojects LLP Total | 1 | |||||||||
Anubhav Anilkumar Aggarwal | P51800005383 | Konkan | Mumbai Suburban | CC006000000078389 | 2019 | Mar | Complete | N | N | 1 |
Anubhav Anilkumar Aggarwal Total | 1 | |||||||||
Anuradha Real Estate Developers Pvt Ltd | P51800011594 | Konkan | Mumbai Suburban | CC006000000001941 | 2017 | Nov | Complete | N | N | 1 |
CC006000000197147 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197225 | 2021 | Jun | Pending | N | N | 1 | ||||
Anuradha Real Estate Developers Pvt Ltd Total | 3 | |||||||||
ANUSHKA DEVELOPERS | P51800020573 | Konkan | Mumbai Suburban | CC006000000196720 | 2021 | Apr | Hearing Schedule | N | N | 1 |
ANUSHKA DEVELOPERS Total | 1 | |||||||||
ANUSMERA REALTY & INFRA PRIVATE LIMITED | P51800002260 | Konkan | Mumbai Suburban | CC006000000197013 | 2021 | May | Hearing Schedule | N | N | 1 |
ANUSMERA REALTY & INFRA PRIVATE LIMITED Total | 1 | |||||||||
APCON CONSTRUCTION COMPANY | P51800015420 | Konkan | Mumbai Suburban | CC006000000023708 | 2018 | Mar | Complete | N | N | 1 |
CC006000000195496 | 2021 | Jan | Complete | Y | N | 1 | ||||
APCON CONSTRUCTION COMPANY Total | 2 | |||||||||
APT REALCON | P51800006899 | Konkan | Mumbai Suburban | CC006000000055980 | 2018 | Aug | Complete | Y | Y | 1 |
CC006000000055981 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056017 | 2018 | Aug | Complete | Y | Y | 1 | ||||
APT REALCON Total | 3 | |||||||||
ARDENT PROPERTIES PRIVATE LIMITED | P51700000295 | Konkan | Thane | CC006000000056945 | 2020 | Jan | Complete | N | N | 1 |
CC006000000193454 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193594 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000194973 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195064 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195717 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195719 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000196110 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000197162 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000209436 | 2021 | Dec | Pending | N | N | 1 | ||||
ARDENT PROPERTIES PRIVATE LIMITED Total | 10 | |||||||||
ARHAM ENGINEERS | P51800005828 | Konkan | Mumbai Suburban | CC006000000012207 | 2018 | Nov | Complete | N | N | 1 |
CC006000000056834 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057219 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057786 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000100437 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000171548 | 2019 | Nov | Complete | N | N | 1 | ||||
ARHAM ENGINEERS Total | 6 | |||||||||
ARIHANT AASHIYANA PRIVATE LIMITED | P52000009246 | Konkan | Raigarh | CC006000000195199 | 2020 | Dec | Complete | N | N | 1 |
ARIHANT AASHIYANA PRIVATE LIMITED Total | 1 | |||||||||
ARIHANT ABODE LIMITED | P52000014107 | Konkan | Raigarh | CC006000000195236 | 2020 | Dec | Complete | N | N | 1 |
CC006000000195238 | 2020 | Dec | Pending | N | N | 1 | ||||
CC006000000199305 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
ARIHANT ABODE LIMITED Total | 3 | |||||||||
ARIHANT ASSOCIATES | P51800005015 | Konkan | Mumbai Suburban | CC006000000055576 | 2018 | Aug | Complete | Y | N | 1 |
CC006000000055577 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055578 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055579 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055623 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055625 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000171494 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171518 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171520 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171521 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000181956 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192134 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
ARIHANT ASSOCIATES Total | 12 | |||||||||
ARIHANT DEVLOPERS | P51900015921 | Konkan | Mumbai City | CC006000000196659 | 2021 | Apr | Hearing Schedule | N | N | 1 |
ARIHANT DEVLOPERS Total | 1 | |||||||||
ARIHANT INFRASTRUCTURE COMPANY | P51800008281 | Konkan | Mumbai Suburban | CC006000000195570 | 2021 | Jan | Hearing Schedule | N | N | 1 |
CC006000000198917 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
ARIHANT INFRASTRUCTURE COMPANY Total | 2 | |||||||||
ARIHANT REALTORS | P51800011649 | Konkan | Mumbai Suburban | CC006000000197543 | 2021 | Jul | Hearing Schedule | N | N | 1 |
ARIHANT REALTORS Total | 1 | |||||||||
ARIHANT SUPERSTRUCTURES LIMITED | P52000003422 | Konkan | Raigarh | CC006000000090077 | 2019 | Jul | Complete | N | N | 1 |
ARIHANT SUPERSTRUCTURES LIMITED Total | 1 | |||||||||
ARIHANT VATIKA REALTY PRIVATE LIMITED | P51700003112 | Konkan | Thane | CC006000000078599 | 2019 | Mar | Complete | N | N | 1 |
CC006000000195439 | 2020 | Dec | Complete | N | N | 1 | ||||
P52000001869 | Konkan | Raigarh | CC006000000193352 | 2020 | Jun | Hearing Schedule | N | N | 1 | |
P52000006391 | Konkan | Raigarh | CC006000000054626 | 2018 | Jun | Complete | Y | N | 1 | |
P52000017271 | Konkan | Raigarh | CC006000000197421 | 2021 | Jul | Hearing Schedule | N | N | 1 | |
ARIHANT VATIKA REALTY PRIVATE LIMITED Total | 5 | |||||||||
ARIISTO DEVELOPERS PRIVATE LIMITED | P51800002847 | Konkan | Mumbai Suburban | CC006000000000982 | 2017 | Oct | Complete | N | N | 1 |
CC006000000022976 | 2018 | Jan | Complete | Y | N | 1 | ||||
CC006000000078534 | 2019 | Mar | Complete | N | N | 1 | ||||
P51800005285 | Konkan | Mumbai Suburban | CC006000000001668 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000022887 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000044438 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054900 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000056109 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056239 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000057275 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078495 | 2019 | Mar | Complete | N | N | 1 | ||||
ARIISTO DEVELOPERS PRIVATE LIMITED Total | 11 | |||||||||
ARION DEVELOPERS & REALTORS PVT. LTD. | P52000012163 | Konkan | Raigarh | CC006000000195261 | 2020 | Dec | Hearing Schedule | N | N | 1 |
ARION DEVELOPERS & REALTORS PVT. LTD. Total | 1 | |||||||||
ARISTOCRAT REALTY PVT LTD | P51800005783 | Konkan | Mumbai Suburban | CC006000000194206 | 2020 | Oct | Hearing Schedule | N | N | 1 |
ARISTOCRAT REALTY PVT LTD Total | 1 | |||||||||
ARJUN ANANT WAGHMARE | P51800004827 | Konkan | Mumbai Suburban | CC006000000057487 | 2018 | Dec | Complete | N | N | 1 |
CC006000000198352 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000209593 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
ARJUN ANANT WAGHMARE Total | 3 | |||||||||
Arkade Developers Private Limited | P51800004750 | Konkan | Mumbai Suburban | CC006000000079094 | 2019 | May | Complete | N | N | 1 |
P51800014422 | Konkan | Mumbai Suburban | CC006000000195656 | 2021 | Jan | Pending | N | N | 1 | |
CC006000000198558 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000209425 | 2021 | Dec | Pending | N | N | 1 | ||||
Arkade Developers Private Limited Total | 4 | |||||||||
ARKADE REALTY | P51700004092 | Konkan | Thane | CC006000000000332 | 2017 | Aug | Complete | N | N | 1 |
P51700004429 | Konkan | Thane | CC006000000001110 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000001135 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001146 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001147 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001279 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000012274 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000012407 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000044365 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000054690 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055619 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000195009 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
ARKADE REALTY Total | 12 | |||||||||
ARPITA REALTORS AND INFRA PRIVATE LIMITED | P99000014281 | Konkan | Palghar | CC006000000100349 | 2019 | Jul | Complete | N | N | 1 |
ARPITA REALTORS AND INFRA PRIVATE LIMITED Total | 1 | |||||||||
ARSIWALA CONSTRUCTIONS PRIVATE LIMITED | P99000010587 | Konkan | Palghar | CC006000000089711 | 2019 | Jun | Complete | N | N | 1 |
ARSIWALA CONSTRUCTIONS PRIVATE LIMITED Total | 1 | |||||||||
ARYAMAN INFRATECH INDIA PVT LTD | P51800009494 | Konkan | Mumbai Suburban | CC006000000056318 | 2018 | Sep | Complete | N | N | 1 |
P51800012284 | Konkan | Mumbai Suburban | CC006000000000430 | 2017 | Sep | Complete | N | N | 1 | |
CC006000000056574 | 2018 | Oct | Complete | Y | Y | 1 | ||||
ARYAMAN INFRATECH INDIA PVT LTD Total | 3 | |||||||||
Aryan Realtors | P52000006942 | Konkan | Raigarh | CC006000000054821 | 2018 | Jul | Complete | Y | Y | 1 |
Aryan Realtors Total | 1 | |||||||||
ASHAPURA DEVELOPERS | P51800007105 | Konkan | Mumbai Suburban | CC006000000110784 | 2019 | Oct | Complete | N | N | 1 |
ASHAPURA DEVELOPERS Total | 1 | |||||||||
ASHAPURA HOMES PRIVATE LIMITED | P51800005944 | Konkan | Mumbai Suburban | CC006000000195103 | 2020 | Dec | Pending | N | N | 1 |
CC006000000198329 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
ASHAPURA HOMES PRIVATE LIMITED Total | 2 | |||||||||
ASHAPURA HOUSING PRIVATE LIMITED | P51800005475 | Konkan | Mumbai Suburban | CC006000000057431 | 2018 | Dec | Complete | N | N | 1 |
CC006000000078250 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000193264 | 2020 | Jun | Complete | N | N | 1 | ||||
CC006000000193740 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193743 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193744 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193746 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193748 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193749 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193799 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193800 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193801 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193833 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000195805 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000196051 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000197050 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197424 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197987 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198833 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199084 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
ASHAPURA HOUSING PRIVATE LIMITED Total | 20 | |||||||||
Ashapura Realty | P51700002533 | Konkan | Raigarh | CC006000000194647 | 2020 | Oct | Complete | N | N | 1 |
Ashapura Realty Total | 1 | |||||||||
ASHIRWAD DEVELOPERS | P51700001476 | Konkan | Thane | CC006000000001087 | 2017 | Oct | Complete | N | N | 1 |
ASHIRWAD DEVELOPERS Total | 1 | |||||||||
Ashok Kumar Narayanlal Sahlot | P51700005077 | Konkan | Thane | CC006000000194843 | 2020 | Nov | Hearing Schedule | N | N | 1 |
Ashok Kumar Narayanlal Sahlot Total | 1 | |||||||||
Ashok Pawar & Sons | P52800012763 | Konkan | Ratnagiri | CC006000000195114 | 2020 | Dec | Hearing Schedule | N | N | 1 |
Ashok Pawar & Sons Total | 1 | |||||||||
Ashok Rajaram Gupta | P51800010062 | Konkan | Mumbai Suburban | CC006000000012333 | 2020 | Feb | Complete | N | N | 1 |
CC006000000012336 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000012643 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000044001 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000054848 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000058070 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078262 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078263 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078586 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078795 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078883 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079065 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079075 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000079157 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089707 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000090096 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000090100 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000090103 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000090105 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000090126 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100444 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100473 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100475 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000120987 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000171498 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171515 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171516 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171582 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171590 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171676 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171711 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171840 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192127 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192143 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192163 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192164 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192166 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192167 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192169 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192177 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192179 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192180 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192182 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192185 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192186 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192189 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192190 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192745 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192847 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192848 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192849 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192851 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192852 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192853 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192854 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192857 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192858 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192870 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192871 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192872 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192873 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192874 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192875 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192877 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192878 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192879 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192906 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192910 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192911 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192913 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193379 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000196344 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000197785 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198396 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Ashok Rajaram Gupta Total | 74 | |||||||||
Ashoka Developers | P51800005798 | Konkan | Mumbai Suburban | CC006000000056129 | 2018 | Sep | Complete | N | N | 1 |
CC006000000089526 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000182010 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000182022 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192521 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000193161 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195301 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000197578 | 2021 | Jul | Complete | N | N | 1 | ||||
CC006000000198901 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Ashoka Developers Total | 9 | |||||||||
ASHTAVINAYAK CONSTRUCTION BUILDERS AND DEVELOPERS | P51700025968 | Konkan | Thane | CC006000000198504 | 2021 | Sep | Complete | N | N | 1 |
ASHTAVINAYAK CONSTRUCTION BUILDERS AND DEVELOPERS Total | 1 | |||||||||
ASHVI DEVELOPERS PRIVATE LIMITED | P51800009848 | Konkan | Mumbai Suburban | CC006000000056158 | 2018 | Sep | Complete | N | N | 1 |
CC006000000057811 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078962 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078963 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078966 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078967 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079042 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089922 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000110623 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000141123 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000192131 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192376 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000195175 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196949 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
ASHVI DEVELOPERS PRIVATE LIMITED Total | 14 | |||||||||
Ashwamedh Builders & Developers | P51700005079 | Konkan | Thane | CC006000000044034 | 2018 | Apr | Complete | Y | N | 1 |
CC006000000161328 | 2019 | Oct | Complete | N | N | 1 | ||||
Ashwamedh Builders & Developers Total | 2 | |||||||||
ASHWAMEDH BUILDERS AND DEVELOPERS | P51700001143 | Konkan | Thane | CC006000000078975 | 2019 | Apr | Complete | N | N | 1 |
ASHWAMEDH BUILDERS AND DEVELOPERS Total | 1 | |||||||||
ASHWAMEDH BUILDERS AND DEVELOPERS MUMBAI | P51800005636 | Konkan | Mumbai Suburban | CC006000000054570 | 2018 | May | Complete | Y | Y | 1 |
ASHWAMEDH BUILDERS AND DEVELOPERS MUMBAI Total | 1 | |||||||||
Ashwatha Developers | P51900012105 | Konkan | Mumbai City | CC006000000194883 | 2020 | Nov | Complete | N | N | 1 |
Ashwatha Developers Total | 1 | |||||||||
Ashwin kumar Jain | P51700014458 | Konkan | Thane | CC006000000023419 | 2018 | Feb | Complete | N | N | 1 |
CC006000000057514 | 2019 | Jan | Complete | N | N | 1 | ||||
Ashwin kumar Jain Total | 2 | |||||||||
ASHWINI AJIT KARANDIKAR | P51800005872 | Konkan | Mumbai Suburban | CC006000000195352 | 2020 | Dec | Pending | N | N | 1 |
ASHWINI AJIT KARANDIKAR Total | 1 | |||||||||
ASPY PHIROZE CAPTAIN | P51800006599 | Konkan | Mumbai Suburban | CC006000000056242 | 2018 | Sep | Complete | Y | N | 1 |
CC006000000057544 | 2019 | Jan | Complete | Y | N | 1 | ||||
ASPY PHIROZE CAPTAIN Total | 2 | |||||||||
ASSETS REALITY | P51700008568 | Konkan | Thane | CC006000000023906 | 2018 | Mar | Complete | N | N | 1 |
CC006000000044180 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000057076 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000078285 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078288 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078290 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078292 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078293 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078297 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078299 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078302 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000078303 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078446 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078479 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078500 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078535 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078539 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078542 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078543 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078609 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000196221 | 2021 | Mar | Complete | Y | N | 1 | ||||
ASSETS REALITY Total | 21 | |||||||||
ATHARVA DEVELOPERS | P51800007651 | Konkan | Mumbai Suburban | CC006000000078653 | 2019 | Apr | Complete | N | N | 1 |
P52000016373 | Konkan | Raigarh | CC006000000089887 | 2019 | Jul | Complete | Y | N | 1 | |
P52000018183 | Konkan | Raigarh | CC006000000195786 | 2021 | Feb | Complete | N | N | 1 | |
ATHARVA DEVELOPERS Total | 3 | |||||||||
Atharva Realtors | P51800012451 | Konkan | Mumbai Suburban | CC006000000054809 | 2018 | Jun | Complete | Y | Y | 1 |
Atharva Realtors Total | 1 | |||||||||
ATLANTA ASSOCIATES | P51800003044 | Konkan | Mumbai Suburban | CC006000000000348 | 2017 | Sep | Complete | N | N | 1 |
CC006000000001874 | 2017 | Dec | Complete | N | N | 1 | ||||
ATLANTA ASSOCIATES Total | 2 | |||||||||
Atmosphere Realty Pvt Ltd | P51800001243 | Konkan | Mumbai Suburban | CC006000000001047 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001779 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000044486 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000057413 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000089949 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100282 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000193495 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
P51800019950 | Konkan | Mumbai Suburban | CC006000000196482 | 2021 | Mar | Hearing Schedule | N | N | 1 | |
Atmosphere Realty Pvt Ltd Total | 8 | |||||||||
ATUL CORPORATES | P51800006783 | Konkan | Mumbai Suburban | CC006000000023720 | 2018 | Apr | Complete | N | N | 1 |
ATUL CORPORATES Total | 1 | |||||||||
ATUL PROJECTS INDIA PRIVATE LIMITED | P51800010900 | Konkan | Mumbai Suburban | CC006000000078758 | 2019 | Apr | Complete | N | N | 1 |
ATUL PROJECTS INDIA PRIVATE LIMITED Total | 1 | |||||||||
Aurum Platz IT Private Limited | P51700001722 | Konkan | Thane | CC006000000198804 | 2021 | Oct | Hearing Schedule | N | N | 1 |
CC006000000199150 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
P51700017304 | Konkan | Thane | CC006000000196229 | 2021 | Aug | Pending | N | N | 1 | |
Aurum Platz IT Private Limited Total | 3 | |||||||||
AVAAS BUILDERS AND DEVELOPERS | P99000008526 | Konkan | Palghar | CC006000000195023 | 2020 | Nov | Complete | N | N | 1 |
AVAAS BUILDERS AND DEVELOPERS Total | 1 | |||||||||
AVAJ BUILDERS AND DEVELOPERS PRIVATE LIMITED | P52000012402 | Konkan | Raigarh | CC006000000000826 | 2017 | Oct | Complete | Y | Y | 1 |
CC006000000012573 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000056975 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000078873 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000110625 | 2019 | Aug | Complete | N | N | 1 | ||||
AVAJ BUILDERS AND DEVELOPERS PRIVATE LIMITED Total | 5 | |||||||||
AVANI RESIDENCY | P99000006263 | Konkan | Palghar | CC006000000197931 | 2021 | Nov | Hearing Schedule | N | N | 1 |
AVANI RESIDENCY Total | 1 | |||||||||
Avant Jakhar Natural Resources LLP | P51800022151 | Konkan | Mumbai Suburban | CC006000000196251 | 2021 | Mar | Hearing Schedule | N | N | 1 |
Avant Jakhar Natural Resources LLP Total | 1 | |||||||||
AVARSEKAR REALTY PVT LTD | P51900002867 | Konkan | Mumbai City | CC006000000023202 | 2018 | Feb | Complete | Y | N | 1 |
CC006000000023233 | 2018 | Feb | Complete | Y | N | 1 | ||||
CC006000000023236 | 2018 | Feb | Complete | Y | N | 1 | ||||
CC006000000023237 | 2018 | Feb | Complete | Y | N | 1 | ||||
CC006000000078414 | 2019 | Mar | Complete | Y | Y | 1 | ||||
CC006000000209390 | 2021 | Dec | Pending | N | N | 1 | ||||
AVARSEKAR REALTY PVT LTD Total | 6 | |||||||||
Avi Housing | P51800012724 | Konkan | Mumbai Suburban | CC006000000195782 | 2021 | Jan | Pending | N | N | 1 |
CC006000000197753 | 2021 | Jul | Complete | N | N | 1 | ||||
Avi Housing Total | 2 | |||||||||
AVIATION HOTELS PVT. LTD. | P51800005153 | Konkan | Mumbai Suburban | CC006000000058101 | 2019 | Feb | Complete | Y | Y | 1 |
CC006000000195468 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000195469 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000195720 | 2021 | Feb | Complete | Y | N | 1 | ||||
CC006000000196431 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000198734 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000209727 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
AVIATION HOTELS PVT. LTD. Total | 7 | |||||||||
Axiom Realty Pvt ltd | P51800012463 | Konkan | Mumbai Suburban | CC006000000197903 | 2021 | Aug | Pending | N | N | 1 |
CC006000000198376 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198378 | 2021 | Sep | Pending | N | N | 1 | ||||
Axiom Realty Pvt ltd Total | 3 | |||||||||
AYG Realty Pvt. Ltd. | P52000005747 | Konkan | Raigarh | CC006000000161225 | 2019 | Oct | Hearing Schedule | Y | N | 1 |
CC006000000197500 | 2021 | Jul | Pending | N | N | 1 | ||||
P52000007147 | Konkan | Raigarh | CC006000000012472 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000022872 | 2018 | Jan | Complete | N | N | 1 | ||||
AYG Realty Pvt. Ltd. Total | 4 | |||||||||
AYODHYA CONSTRUCTION CO | P51800007485 | Konkan | Mumbai Suburban | CC006000000001708 | 2017 | Nov | Complete | N | N | 1 |
CC006000000056871 | 2018 | Nov | Complete | Y | N | 1 | ||||
CC006000000078628 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079066 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
AYODHYA CONSTRUCTION CO Total | 4 | |||||||||
AYUB ISHAQUE MOHAMMED KHAN | P52000018751 | Konkan | Raigarh | CC006000000110866 | 2019 | Sep | Complete | N | N | 1 |
AYUB ISHAQUE MOHAMMED KHAN Total | 1 | |||||||||
AYYAPPA DEVELOPERS PVT. LTD. | P51800005812 | Konkan | Mumbai Suburban | CC006000000055374 | 2018 | Jul | Complete | Y | Y | 1 |
CC006000000055386 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055607 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000057933 | 2019 | Feb | Complete | Y | Y | 1 | ||||
CC006000000089827 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000161442 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000161443 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000196398 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196450 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196453 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
AYYAPPA DEVELOPERS PVT. LTD. Total | 10 | |||||||||
B P Gangar Constructions Pvt Ltd | P51900002859 | Konkan | Mumbai City | CC006000000171672 | 2019 | Nov | Complete | N | N | 1 |
B P Gangar Constructions Pvt Ltd Total | 1 | |||||||||
BAJAJ INTERNATIONAL REALTY PRIVATE LIMITED | P51800012464 | Konkan | Mumbai Suburban | CC006000000000958 | 2017 | Sep | Complete | N | N | 1 |
CC006000000161393 | 2019 | Nov | Complete | N | N | 1 | ||||
BAJAJ INTERNATIONAL REALTY PRIVATE LIMITED Total | 2 | |||||||||
Balaji Associates | P51900007376 | Konkan | Mumbai City | CC006000000197781 | 2021 | Jul | Pending | N | N | 1 |
Balaji Associates Total | 1 | |||||||||
Balaji Construction Co. | P51800009622 | Konkan | Mumbai Suburban | CC006000000055118 | 2018 | Jul | Complete | N | N | 1 |
CC006000000079482 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000192778 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000194706 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195552 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000197884 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198548 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198549 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198550 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198551 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198552 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198554 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198555 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
Balaji Construction Co. Total | 13 | |||||||||
BALAJI CORPORATION PRIVATE LIMITED | P51900005401 | Konkan | Mumbai City | CC006000000001519 | 2017 | Dec | Complete | N | N | 1 |
CC006000000089799 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089800 | 2019 | Jun | Complete | N | N | 1 | ||||
BALAJI CORPORATION PRIVATE LIMITED Total | 3 | |||||||||
BALAJI DEVELOPERS | P51800003420 | Konkan | Mumbai Suburban | CC006000000057608 | 2019 | Jan | Complete | Y | N | 1 |
CC006000000192988 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
BALAJI DEVELOPERS Total | 2 | |||||||||
BALAJI ENTERPRISE | P51800008986 | Konkan | Mumbai Suburban | CC006000000195708 | 2021 | Jan | Pending | N | N | 1 |
BALAJI ENTERPRISE Total | 1 | |||||||||
Balaji Homes | P51700019194 | Konkan | Thane | CC006000000209368 | 2021 | Dec | Hearing Schedule | N | N | 1 |
P52000015351 | Konkan | Raigarh | CC006000000192502 | 2020 | Feb | Pending | N | N | 1 | |
Balaji Homes Total | 2 | |||||||||
BALAJI REGENCY PROPERTIES | P51700002262 | Konkan | Thane | CC006000000012671 | 2017 | Dec | Complete | N | N | 1 |
CC006000000022919 | 2018 | Jan | Complete | N | N | 1 | ||||
BALAJI REGENCY PROPERTIES Total | 2 | |||||||||
BALAJI WORLD | P51700015155 | Konkan | Thane | CC006000000195791 | 2021 | Jan | Pending | N | N | 1 |
BALAJI WORLD Total | 1 | |||||||||
Balkrishna Construction | P51800005852 | Konkan | Mumbai Suburban | CC006000000044029 | 2018 | Apr | Complete | Y | Y | 1 |
Balkrishna Construction Total | 1 | |||||||||
BALSAM DEVELOPERS PVT LTD | P52000006638 | Konkan | Raigarh | CC006000000000582 | 2017 | Sep | Complete | N | N | 1 |
BALSAM DEVELOPERS PVT LTD Total | 1 | |||||||||
BEAUTY GANRAJ CONSTRUCTION LLP | P51800023266 | Konkan | Mumbai Suburban | CC006000000196733 | 2021 | May | Complete | N | N | 1 |
BEAUTY GANRAJ CONSTRUCTION LLP Total | 1 | |||||||||
BEEJAY REALTORS PRIVATE LIMITED | P51800009796 | Konkan | Mumbai Suburban | CC006000000012349 | 2017 | Dec | Complete | N | N | 1 |
CC006000000209607 | 2022 | Jan | Pending | N | N | 1 | ||||
BEEJAY REALTORS PRIVATE LIMITED Total | 2 | |||||||||
BEHOLD SPACE DEVELOPERS PRIVATE LIMITED | P51800001443 | Konkan | Mumbai Suburban | CC006000000199118 | 2021 | Nov | Hearing Schedule | N | N | 1 |
CC006000000199145 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
BEHOLD SPACE DEVELOPERS PRIVATE LIMITED Total | 2 | |||||||||
BENCHMARK PROJECTS PVT LTD | P51800006237 | Konkan | Mumbai Suburban | CC006000000056049 | 2018 | Sep | Complete | N | N | 1 |
CC006000000056050 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000079266 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000079268 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079273 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000196874 | 2021 | May | Pending | N | N | 1 | ||||
BENCHMARK PROJECTS PVT LTD Total | 6 | |||||||||
BETTER BUILDERS AND INFRASTRUCTURE PRIVATE LTD | P51800004762 | Konkan | Mumbai Suburban | CC006000000090135 | 2019 | Jul | Complete | Y | N | 1 |
CC006000000090138 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000090139 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000090140 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000090141 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000193742 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193783 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193784 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
BETTER BUILDERS AND INFRASTRUCTURE PRIVATE LTD Total | 8 | |||||||||
Bhairav Realty | P52000006668 | Konkan | Raigarh | CC006000000054707 | 2018 | Jun | Complete | Y | N | 1 |
CC006000000055745 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056973 | 2018 | Nov | Complete | N | N | 1 | ||||
Bhairav Realty Total | 3 | |||||||||
Bhalchandra Wadnerkar | P51900004420 | Konkan | Mumbai City | CC006000000055722 | 2018 | Aug | Complete | N | N | 1 |
Bhalchandra Wadnerkar Total | 1 | |||||||||
BHARAT INFRASTRUCTURE & ENGINEERING PRIVATE LIMITED | P51700000111 | Konkan | Thane | CC006000000055847 | 2018 | Aug | Complete | Y | N | 1 |
CC006000000057375 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057992 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000193006 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193704 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193711 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000197619 | 2021 | Jul | Pending | N | N | 1 | ||||
BHARAT INFRASTRUCTURE & ENGINEERING PRIVATE LIMITED Total | 7 | |||||||||
BHARAT MAHAN DEVELOPERS & BUILDERS | P51800005064 | Konkan | Mumbai Suburban | CC006000000000500 | 2017 | Sep | Complete | N | N | 1 |
CC006000000023078 | 2018 | Jan | Complete | N | N | 1 | ||||
BHARAT MAHAN DEVELOPERS & BUILDERS Total | 2 | |||||||||
BHARAT MANUBHAI PATEL | P51800013319 | Konkan | Mumbai Suburban | CC006000000001432 | 2017 | Oct | Complete | N | N | 1 |
BHARAT MANUBHAI PATEL Total | 1 | |||||||||
BHARAT NAVINCHANDRA GALA | P51800002243 | Konkan | Mumbai Suburban | CC006000000192552 | 2020 | Feb | Hearing Schedule | N | N | 1 |
P51800007795 | Konkan | Mumbai Suburban | CC006000000078383 | 2019 | Mar | Complete | N | N | 1 | |
CC006000000195376 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195546 | 2021 | Jan | Complete | N | N | 1 | ||||
BHARAT NAVINCHANDRA GALA Total | 4 | |||||||||
BHARAT PRANJIVAN VALIA | P51800001306 | Konkan | Mumbai Suburban | CC006000000193258 | 2020 | Jun | Hearing Schedule | N | N | 1 |
BHARAT PRANJIVAN VALIA Total | 1 | |||||||||
BHARATBHAI KESHAVLAL UNADKAT | P51700019586 | Konkan | Thane | CC006000000171920 | 2019 | Dec | Complete | N | N | 1 |
CC006000000171929 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171939 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171940 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000198135 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000209536 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
BHARATBHAI KESHAVLAL UNADKAT Total | 6 | |||||||||
BHASIN PROPERTIES AND DEVELOPERS PVT LTD | P52000014959 | Konkan | Raigarh | CC006000000209520 | 2021 | Dec | Pending | N | N | 1 |
BHASIN PROPERTIES AND DEVELOPERS PVT LTD Total | 1 | |||||||||
BHATIA BUILDERS AND DEVELOPERS PVT LTDC | P51800007805 | Konkan | Mumbai Suburban | CC006000000023026 | 2018 | Jan | Complete | N | N | 1 |
CC006000000171538 | 2019 | Nov | Complete | N | N | 1 | ||||
BHATIA BUILDERS AND DEVELOPERS PVT LTDC Total | 2 | |||||||||
BHAVANI DEVELOPERS PVT LTD | P51800012042 | Konkan | Mumbai Suburban | CC006000000196111 | 2021 | Feb | Hearing Schedule | N | N | 1 |
CC006000000198600 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198601 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
BHAVANI DEVELOPERS PVT LTD Total | 3 | |||||||||
BHAVANI ENTERPRISES | P51700004730 | Konkan | Thane | CC006000000171756 | 2019 | Dec | Complete | N | N | 1 |
BHAVANI ENTERPRISES Total | 1 | |||||||||
Bhaveshwar Properties Pvt Ltd | P51800002669 | Konkan | Mumbai Suburban | CC006000000193193 | 2020 | May | Hearing Schedule | N | N | 1 |
Bhaveshwar Properties Pvt Ltd Total | 1 | |||||||||
Bhavya Infrastructures (India) Private Limited | P51900013855 | Konkan | Mumbai City | CC006000000012383 | 2017 | Dec | Complete | N | N | 1 |
Bhavya Infrastructures (India) Private Limited Total | 1 | |||||||||
BHOLANATH KAPILDEV GUPTA | P51800009449 | Konkan | Mumbai Suburban | CC006000000056941 | 2018 | Nov | Complete | N | N | 1 |
CC006000000194201 | 2020 | Oct | Complete | Y | N | 1 | ||||
CC006000000194233 | 2020 | Oct | Complete | Y | N | 1 | ||||
CC006000000194252 | 2020 | Oct | Complete | Y | N | 1 | ||||
CC006000000197153 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
BHOLANATH KAPILDEV GUPTA Total | 5 | |||||||||
Bhoomi & Arkade Associates | P99000006132 | Konkan | Palghar | CC006000000000224 | 2017 | Nov | Complete | N | N | 1 |
CC006000000000691 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000023768 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044090 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000054591 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000057038 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057050 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000057254 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057490 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000089573 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000193037 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193875 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000195151 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195155 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196172 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196809 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000196893 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197107 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197123 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197127 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197155 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197159 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197178 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197198 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197239 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197241 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197337 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197418 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197439 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197556 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197916 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198124 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198194 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198810 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199115 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199349 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209432 | 2021 | Dec | Pending | N | N | 1 | ||||
P99000007415 | Konkan | Palghar | CC006000000000754 | 2017 | Sep | Complete | N | N | 1 | |
CC006000000001398 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001449 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000001509 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000023738 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023809 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000044203 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044263 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000054826 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055505 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055852 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000056012 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056692 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056733 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056990 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000057018 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057212 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057225 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057252 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057437 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000182089 | 2020 | Jan | Pending | N | N | 1 | ||||
CC006000000195875 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000196275 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196909 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197417 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197904 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
Bhoomi & Arkade Associates Total | 63 | |||||||||
BHS HOUSING PRIVATE LIMITED | P51800012044 | Konkan | Mumbai Suburban | CC006000000193829 | 2020 | Sep | Pending | N | N | 1 |
BHS HOUSING PRIVATE LIMITED Total | 1 | |||||||||
BHUMIKA DEVELOPERS | P99000011671 | Konkan | Palghar | CC006000000078316 | 2019 | Mar | Complete | N | N | 1 |
BHUMIKA DEVELOPERS Total | 1 | |||||||||
BHUPESHBABU KARAPPAN NILLIPARAMBIL | P52000005271 | Konkan | Raigarh | CC006000000000534 | 2020 | Feb | Hearing Schedule | N | N | 1 |
CC006000000054966 | 2018 | Jul | Hearing Schedule | Y | Y | 1 | ||||
CC006000000058044 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000078785 | 2019 | May | Complete | N | N | 1 | ||||
P52000005585 | Konkan | Raigarh | CC006000000001738 | 2018 | Jan | Complete | Y | Y | 1 | |
CC006000000012712 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000012717 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000022917 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000023336 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023377 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023383 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023571 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000044017 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000044134 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000079457 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100356 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000197456 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
P52000006025 | Konkan | Raigarh | CC006000000199266 | 2021 | Dec | Hearing Schedule | N | N | 1 | |
P52000006667 | Konkan | Raigarh | CC006000000012520 | 2018 | Mar | Complete | Y | Y | 1 | |
CC006000000012668 | 2017 | Dec | Complete | Y | Y | 1 | ||||
CC006000000023446 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023735 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000044137 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000054754 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000192639 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000197626 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000197627 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
P52000006773 | Konkan | Raigarh | CC006000000068159 | 2019 | Feb | Complete | N | N | 1 | |
CC006000000209465 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
P52000009049 | Konkan | Raigarh | CC006000000001933 | 2017 | Dec | Complete | Y | Y | 1 | |
CC006000000012525 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023359 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023518 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000054792 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055205 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000055869 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000056866 | 2018 | Nov | Complete | Y | Y | 1 | ||||
P52000009573 | Konkan | Raigarh | CC006000000000736 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000055470 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056910 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000078356 | 2019 | Mar | Complete | Y | Y | 1 | ||||
P52000010054 | Konkan | Raigarh | CC006000000023339 | 2018 | Feb | Complete | Y | N | 1 | |
CC006000000023451 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000054595 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056227 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000057508 | 2019 | Jun | Complete | Y | Y | 1 | ||||
CC006000000079443 | 2019 | May | Complete | Y | Y | 1 | ||||
CC006000000089999 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100357 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000110677 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000161226 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000192257 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
P52000010454 | Konkan | Raigarh | CC006000000012387 | 2017 | Dec | Complete | Y | Y | 1 | |
P52000012218 | Konkan | Raigarh | CC006000000023444 | 2018 | Feb | Complete | Y | Y | 1 | |
CC006000000023452 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000044133 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000056248 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000100257 | 2019 | Jul | Complete | N | N | 1 | ||||
BHUPESHBABU KARAPPAN NILLIPARAMBIL Total | 58 | |||||||||
BHURJI DEVELOPERS LLP | P51900016656 | Konkan | Mumbai City | CC006000000057953 | 2019 | Feb | Complete | Y | N | 1 |
CC006000000078856 | 2019 | Apr | Complete | N | N | 1 | ||||
BHURJI DEVELOPERS LLP Total | 2 | |||||||||
Bhushan Enterprises | P51800012948 | Konkan | Mumbai Suburban | CC006000000023964 | 2018 | May | Complete | N | N | 1 |
Bhushan Enterprises Total | 1 | |||||||||
BINEETA | P51900005602 | Konkan | Mumbai City | CC006000000171488 | 2019 | Nov | Hearing Schedule | N | N | 1 |
CC006000000171489 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
BINEETA Total | 2 | |||||||||
BIPIN RANCHHOD GOTHI | P52000009153 | Konkan | Raigarh | CC006000000012442 | 2017 | Dec | Complete | N | N | 1 |
BIPIN RANCHHOD GOTHI Total | 1 | |||||||||
BKS galaxy realtors Pvt ltd | P52000001151 | Konkan | Raigarh | CC006000000199203 | 2021 | Dec | Hearing Schedule | N | N | 1 |
CC006000000199212 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199213 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199215 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199219 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000199220 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199228 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199231 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199234 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199237 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199238 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199239 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199240 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199241 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199243 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199245 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199252 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199255 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199259 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199260 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199263 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199272 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199274 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199275 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199277 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199279 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199280 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199282 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000199284 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199286 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199292 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199294 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199296 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199298 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199300 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199302 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199303 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199304 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199313 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199337 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199343 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209357 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209470 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209542 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209574 | 2021 | Dec | Pending | N | N | 1 | ||||
BKS galaxy realtors Pvt ltd Total | 45 | |||||||||
BLUE BARON REALTORS | P99000003182 | Konkan | Palghar | CC006000000193821 | 2020 | Sep | Hearing Schedule | N | N | 1 |
CC006000000193927 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194072 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000196835 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197955 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000209422 | 2021 | Dec | Pending | N | N | 1 | ||||
BLUE BARON REALTORS Total | 6 | |||||||||
BLUE CANYON REALTY PVT LTD | P51800014896 | Konkan | Mumbai Suburban | CC006000000192631 | 2020 | Feb | Complete | Y | Y | 1 |
BLUE CANYON REALTY PVT LTD Total | 1 | |||||||||
BP INFRA PROJECTS LLP | P51800024694 | Konkan | Mumbai Suburban | CC006000000192922 | 2020 | Apr | Hearing Schedule | N | N | 1 |
BP INFRA PROJECTS LLP Total | 1 | |||||||||
Bridgeview Real Estate Development LLP | P51900001325 | Konkan | Mumbai City | CC006000000196577 | 2021 | Mar | Hearing Schedule | N | N | 1 |
CC006000000196578 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
Bridgeview Real Estate Development LLP Total | 2 | |||||||||
BRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED | P51700005683 | Konkan | Thane | CC006000000057500 | 2018 | Dec | Complete | Y | Y | 1 |
CC006000000057736 | 2019 | Jan | Complete | Y | Y | 1 | ||||
CC006000000195590 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195591 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
P51700009788 | Konkan | Thane | CC006000000055911 | 2018 | Aug | Complete | Y | N | 1 | |
CC006000000193160 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000195959 | 2021 | Feb | Pending | N | N | 1 | ||||
BRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED Total | 7 | |||||||||
BRIJESH SATISH DATTANI | P99000008471 | Konkan | Palghar | CC006000000192522 | 2020 | Feb | Hearing Schedule | N | N | 1 |
BRIJESH SATISH DATTANI Total | 1 | |||||||||
BUILDPRO | P51800006435 | Konkan | Mumbai Suburban | CC006000000110769 | 2019 | Oct | Hearing Schedule | N | N | 1 |
CC006000000194442 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
BUILDPRO Total | 2 | |||||||||
BUILDTECH GROUP | P51800009965 | Konkan | Mumbai Suburban | CC006000000054755 | 2018 | Jun | Complete | Y | N | 1 |
CC006000000054768 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054769 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000057926 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078204 | 2019 | Feb | Complete | Y | N | 1 | ||||
BUILDTECH GROUP Total | 5 | |||||||||
C G HOUSING INFRA PVT LTD C G HOUSING INFRA PVT LTD C G HOUSING INFRA PVT LTD | P51800000603 | Konkan | Mumbai Suburban | CC006000000195071 | 2020 | Nov | Hearing Schedule | N | N | 1 |
CC006000000197700 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
C G HOUSING INFRA PVT LTD C G HOUSING INFRA PVT LTD C G HOUSING INFRA PVT LTD Total | 2 | |||||||||
C9 BUILDCON | P51700012669 | Konkan | Thane | CC006000000192764 | 2020 | Feb | Complete | N | N | 1 |
CC006000000209584 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209585 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
C9 BUILDCON Total | 3 | |||||||||
Callista Realty Limited | P52000005604 | Konkan | Raigarh | CC006000000057654 | 2019 | Feb | Complete | N | N | 1 |
CC006000000193508 | 2020 | Aug | Pending | N | N | 1 | ||||
Callista Realty Limited Total | 2 | |||||||||
CAROA PROPERTIES LLP | P52000001298 | Konkan | Raigarh | CC006000000023955 | 2018 | Apr | Complete | N | N | 1 |
CC006000000057058 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000193318 | 2020 | Jun | Complete | N | N | 1 | ||||
CC006000000198387 | 2021 | Sep | Pending | N | N | 1 | ||||
P52000018146 | Konkan | Raigarh | CC006000000057270 | 2018 | Dec | Complete | N | N | 1 | |
P52000026790 | Konkan | Raigarh | CC006000000197704 | 2021 | Jul | Pending | N | N | 1 | |
CC006000000197795 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000198880 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000209849 | 2022 | Jan | Pending | N | N | 1 | ||||
CAROA PROPERTIES LLP Total | 9 | |||||||||
Castle Floors PMS Pvt Ltd | P51800015109 | Konkan | Mumbai Suburban | CC006000000196259 | 2021 | Mar | Complete | N | N | 1 |
CC006000000209497 | 2021 | Dec | Pending | N | N | 1 | ||||
Castle Floors PMS Pvt Ltd Total | 2 | |||||||||
CCI PROJECTS PRIVATE LIMITED | P51800002287 | Konkan | Mumbai Suburban | CC006000000000834 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000835 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000836 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000935 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000955 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000044340 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000100486 | 2019 | Aug | Complete | N | N | 1 | ||||
P51800003067 | Konkan | Mumbai Suburban | CC006000000001752 | 2020 | Dec | Hearing Schedule | N | N | 1 | |
CC006000000012599 | 2017 | Dec | Complete | Y | N | 1 | ||||
CC006000000022900 | 2019 | Nov | Complete | Y | Y | 1 | ||||
CC006000000023191 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023579 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044076 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044118 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000054636 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054777 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000054855 | 2018 | Jun | Hearing Schedule | Y | Y | 1 | ||||
CC006000000054956 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000055491 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055723 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055728 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056115 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056117 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056120 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056532 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000057389 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000068148 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078611 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000078815 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079150 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000079241 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000079308 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000079357 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000100485 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100522 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000110671 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000110736 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000120991 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000141144 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000141159 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000151223 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000151225 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000161239 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000161287 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161358 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000161363 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161364 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000171479 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171482 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171567 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171579 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171746 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171760 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171767 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171771 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171799 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000171805 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171816 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171817 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171830 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171834 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171839 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000171918 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171932 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000181958 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000182025 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000182039 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000182059 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000182062 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000182066 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000192156 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000192188 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192390 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000192499 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192529 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192533 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192534 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192535 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192536 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192537 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192539 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192540 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192541 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192542 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192544 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192553 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192554 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192555 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192557 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192559 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192560 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192561 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192562 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192563 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192565 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192566 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192567 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192568 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192583 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192585 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192586 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192587 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192590 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192591 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192592 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192593 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192601 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192602 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192603 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192604 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192605 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192606 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192607 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192608 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192610 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192660 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192740 | 2020 | Mar | Complete | Y | N | 1 | ||||
CC006000000193146 | 2020 | Mar | Complete | Y | N | 1 | ||||
CC006000000193656 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193659 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193683 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193693 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193723 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193795 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000193815 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193854 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193858 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193885 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193886 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193903 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193916 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000193926 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193930 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193941 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193943 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193944 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193968 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193990 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193993 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194015 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194063 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000194064 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194066 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194068 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194069 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194070 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194071 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194075 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194076 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194107 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194114 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000194121 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194123 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194124 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194126 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194127 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194128 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194129 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194130 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194131 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194133 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194134 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194139 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194141 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194142 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194143 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194145 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194146 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000194147 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194168 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194170 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194172 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194173 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194174 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194175 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194256 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194260 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194336 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194357 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194404 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194446 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194529 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194538 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194565 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194567 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194572 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194573 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194580 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194665 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194675 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194708 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194723 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194744 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194745 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194747 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194750 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194752 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194773 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194780 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194782 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194783 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194784 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194785 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194786 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194787 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194820 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194827 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194905 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194906 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194911 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194912 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194913 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194914 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194915 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194933 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194938 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194962 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194963 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194980 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194989 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194990 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195017 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195021 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195030 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195040 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195044 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195048 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195056 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195057 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195060 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195061 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195062 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195080 | 2020 | Dec | Pending | N | N | 1 | ||||
CC006000000195144 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195156 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195180 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195191 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195237 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195240 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195241 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195251 | 2020 | Dec | Pending | N | N | 1 | ||||
CC006000000195259 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195287 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195318 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195320 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195324 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195330 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195333 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195334 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195339 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195341 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195349 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195350 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195359 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195366 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195381 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195398 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195430 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195436 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195444 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195445 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195455 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195494 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195597 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195599 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195663 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195700 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195722 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195723 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195957 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195962 | 2021 | Feb | Pending | N | N | 1 | ||||
CC006000000195963 | 2021 | Feb | Pending | N | N | 1 | ||||
CC006000000196008 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196010 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196034 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196332 | 2021 | Mar | Pending | N | N | 1 | ||||
CC006000000196497 | 2021 | Jun | Complete | N | N | 1 | ||||
CC006000000196535 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196553 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196561 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196575 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196579 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196582 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196589 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196591 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196592 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196603 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196619 | 2021 | Apr | Pending | N | N | 1 | ||||
CC006000000196625 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196631 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196633 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196642 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196646 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196651 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196654 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196660 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196680 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196794 | 2021 | Apr | Pending | N | N | 1 | ||||
CC006000000196815 | 2021 | Apr | Pending | N | N | 1 | ||||
CC006000000196991 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197010 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197451 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197537 | 2021 | Jul | Complete | N | N | 1 | ||||
CC006000000197587 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197676 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197818 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000198002 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198006 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198243 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198245 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198476 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198486 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198684 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000209355 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209366 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CCI PROJECTS PRIVATE LIMITED Total | 315 | |||||||||
CELLO SONAL CONSTRUCTION | P51800002490 | Konkan | Mumbai Suburban | CC006000000033969 | 2018 | Apr | Complete | N | N | 1 |
CC006000000192611 | 2020 | Feb | Complete | N | N | 1 | ||||
CELLO SONAL CONSTRUCTION Total | 2 | |||||||||
Century Textiles & Industries Ltd | P51700019178 | Konkan | Thane | CC006000000141163 | 2019 | Oct | Complete | Y | N | 1 |
CC006000000193482 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000198641 | 2022 | Jan | Pending | N | N | 1 | ||||
Century Textiles & Industries Ltd Total | 3 | |||||||||
CHANDIWALA ENTERPRISES | P51800010505 | Konkan | Mumbai Suburban | CC006000000197950 | 2021 | Aug | Hearing Schedule | N | N | 1 |
CHANDIWALA ENTERPRISES Total | 1 | |||||||||
CHANDULAL JORAWARMAL MEHTA | P51900004764 | Konkan | Mumbai City | CC006000000012575 | 2017 | Dec | Complete | N | N | 1 |
CHANDULAL JORAWARMAL MEHTA Total | 1 | |||||||||
Charms Developers | P51700002055 | Konkan | Thane | CC006000000057071 | 2018 | Nov | Complete | Y | Y | 1 |
Charms Developers Total | 1 | |||||||||
CHARMS PRIDE | P51700010110 | Konkan | Thane | CC006000000193253 | 2020 | Jun | Hearing Schedule | N | N | 1 |
CHARMS PRIDE Total | 1 | |||||||||
CHAUBEY REALTIES PRIVATE LIMITED | P51800004538 | Konkan | Mumbai Suburban | CC006000000001069 | 2017 | Oct | Complete | N | N | 1 |
CC006000000056694 | 2018 | Oct | Complete | N | N | 1 | ||||
CHAUBEY REALTIES PRIVATE LIMITED Total | 2 | |||||||||
CHETANA BUILDERS AND DEVELOPERS | P99000012456 | Konkan | Palghar | CC006000000100531 | 2019 | Aug | Complete | N | N | 1 |
CHETANA BUILDERS AND DEVELOPERS Total | 1 | |||||||||
Chetna Global | P51800000906 | Konkan | Mumbai Suburban | CC006000000199204 | 2021 | Nov | Hearing Schedule | N | N | 1 |
Chetna Global Total | 1 | |||||||||
CHINNAIAH VENKATESH GOWDA | P51800002790 | Konkan | Mumbai Suburban | CC006000000197791 | 2021 | Jul | Hearing Schedule | N | N | 1 |
P51800009157 | Konkan | Mumbai Suburban | CC006000000023306 | 2018 | Feb | Complete | Y | Y | 1 | |
CC006000000044355 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000044380 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000055093 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055136 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000057047 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078477 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078489 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000195391 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CHINNAIAH VENKATESH GOWDA Total | 10 | |||||||||
CHINTAMANI DEVELOPERS | P52000001437 | Konkan | Raigarh | CC006000000193984 | 2020 | Oct | Pending | N | N | 1 |
CHINTAMANI DEVELOPERS Total | 1 | |||||||||
CHINTAN ARUN ZAVERI | P51800006507 | Konkan | Mumbai Suburban | CC006000000054596 | 2018 | Jun | Complete | N | N | 1 |
CC006000000056652 | 2018 | Oct | Complete | Y | N | 1 | ||||
P51800009670 | Konkan | Mumbai Suburban | CC006000000055406 | 2018 | Jul | Complete | Y | N | 1 | |
CHINTAN ARUN ZAVERI Total | 3 | |||||||||
CHOICE ENTERPRISES | P51800009779 | Konkan | Mumbai Suburban | CC006000000197265 | 2021 | Jun | Hearing Schedule | N | N | 1 |
CHOICE ENTERPRISES Total | 1 | |||||||||
Citimake Builders Private Limtied | P51800002996 | Konkan | Mumbai Suburban | CC006000000193878 | 2020 | Sep | Complete | N | N | 1 |
CC006000000197236 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
Citimake Builders Private Limtied Total | 2 | |||||||||
CITY BUILDCON | P52000016409 | Konkan | Raigarh | CC006000000195525 | 2021 | Jan | Hearing Schedule | N | N | 1 |
CITY BUILDCON Total | 1 | |||||||||
Citywood Builders Private Limited | P51900000465 | Konkan | Mumbai City | CC006000000198584 | 2021 | Oct | Hearing Schedule | N | N | 1 |
Citywood Builders Private Limited Total | 1 | |||||||||
Citywood Builders Pvt.Ltd. | P51900000839 | Konkan | Mumbai City | CC006000000193624 | 2020 | Jul | Hearing Schedule | N | N | 1 |
Citywood Builders Pvt.Ltd. Total | 1 | |||||||||
CLASSIC BUILDER & DEVELOPER | P52900024612 | Konkan | Sindhudurg | CC006000000196462 | 2021 | Mar | Hearing Schedule | N | N | 1 |
CLASSIC BUILDER & DEVELOPER Total | 1 | |||||||||
CLORIS CONSTRUCTION PRIVATE LIMITED | P99000021893 | Konkan | Palghar | CC006000000197915 | 2021 | Aug | Hearing Schedule | N | N | 1 |
CLORIS CONSTRUCTION PRIVATE LIMITED Total | 1 | |||||||||
CLUBLIFE REALTORS PRIVATE LIMITED | P51700012319 | Konkan | Thane | CC006000000001339 | 2017 | Oct | Complete | Y | N | 1 |
CC006000000012020 | 2017 | Nov | Complete | N | N | 1 | ||||
CLUBLIFE REALTORS PRIVATE LIMITED Total | 2 | |||||||||
CONCRETE BUILDERS | P51800017405 | Konkan | Mumbai Suburban | CC006000000057545 | 2019 | Jan | Complete | N | N | 1 |
CONCRETE BUILDERS Total | 1 | |||||||||
Conoor Builders Private Limited | P51800002922 | Konkan | Mumbai Suburban | CC006000000057098 | 2018 | Nov | Complete | N | N | 1 |
CC006000000161461 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171459 | 2019 | Nov | Pending | Y | N | 1 | ||||
CC006000000171612 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171758 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192256 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000192261 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000193270 | 2020 | Jun | Pending | Y | N | 1 | ||||
CC006000000193558 | 2020 | Jul | Complete | Y | N | 1 | ||||
CC006000000193705 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000195664 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195665 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195666 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000198335 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Conoor Builders Private Limited Total | 14 | |||||||||
CONSOLIDATED CROP PROTECTION PRIVATE LIMITED | P51800011758 | Konkan | Mumbai Suburban | CC006000000197154 | 2021 | Jun | Hearing Schedule | N | N | 1 |
CC006000000197156 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CONSOLIDATED CROP PROTECTION PRIVATE LIMITED Total | 2 | |||||||||
CONTINENTAL BUILDERS AND DEVELOPERS | P51700004314 | Konkan | Thane | CC006000000209883 | 2022 | Feb | Pending | N | N | 1 |
CONTINENTAL BUILDERS AND DEVELOPERS Total | 1 | |||||||||
CONTINENTAL MANIRATNA BUILDERS & DEVELOPERS | P51700014203 | Konkan | Thane | CC006000000198620 | 2021 | Oct | Hearing Schedule | N | N | 1 |
CC006000000198621 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CONTINENTAL MANIRATNA BUILDERS & DEVELOPERS Total | 2 | |||||||||
CONWOOD REALTY PRIVATE LIMITED | P51700006934 | Konkan | Thane | CC006000000001699 | 2017 | Nov | Complete | N | N | 1 |
CC006000000022862 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000054876 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000079200 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079254 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000090089 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000192118 | 2020 | Jan | Complete | N | N | 1 | ||||
P51800008188 | Konkan | Mumbai Suburban | CC006000000001858 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000001871 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012368 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000012705 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023569 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023570 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000055278 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055555 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055558 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055559 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055560 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000057003 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000078456 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000194356 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195818 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000197622 | 2021 | Jul | Pending | N | N | 1 | ||||
P51800012007 | Konkan | Mumbai Suburban | CC006000000056829 | 2018 | Nov | Complete | N | N | 1 | |
CC006000000195544 | 2021 | Jan | Complete | N | N | 1 | ||||
CONWOOD REALTY PRIVATE LIMITED Total | 25 | |||||||||
CORDCON BUILDERS PVT LTD | P51800010364 | Konkan | Mumbai Suburban | CC006000000012775 | 2018 | Jan | Complete | N | N | 1 |
CC006000000100297 | 2019 | Aug | Complete | Y | N | 1 | ||||
CORDCON BUILDERS PVT LTD Total | 2 | |||||||||
COREDELIA REALTY PRIVATE LIMITED | P52000011624 | Konkan | Raigarh | CC006000000012523 | 2018 | Jul | Complete | N | N | 1 |
CC006000000055964 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056054 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000161453 | 2019 | Nov | Complete | Y | Y | 1 | ||||
CC006000000196062 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196644 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197190 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197193 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197281 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
COREDELIA REALTY PRIVATE LIMITED Total | 9 | |||||||||
Cosmos Associates | P99000006962 | Konkan | Palghar | CC006000000022971 | 2018 | Jan | Complete | N | N | 1 |
Cosmos Associates Total | 1 | |||||||||
Cosmos Homes India Pvt. Ltd. | P51800012114 | Konkan | Mumbai Suburban | CC006000000000989 | 2017 | Sep | Complete | N | N | 1 |
CC006000000023493 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044286 | 2018 | Apr | Complete | N | N | 1 | ||||
Cosmos Homes India Pvt. Ltd. Total | 3 | |||||||||
COURTYARD REAL ESTATE PRIVATE LIMITED | P51700000611 | Konkan | Thane | CC006000000012340 | 2017 | Dec | Complete | N | N | 1 |
CC006000000198652 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
P51700000681 | Konkan | Thane | CC006000000012345 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000197646 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
P51700000714 | Konkan | Thane | CC006000000012343 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000193315 | 2020 | Jun | Complete | N | N | 1 | ||||
P51700000831 | Konkan | Thane | CC006000000012342 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000181997 | 2019 | Dec | Complete | N | N | 1 | ||||
P51700006312 | Konkan | Thane | CC006000000078780 | 2019 | Apr | Complete | N | N | 1 | |
COURTYARD REAL ESTATE PRIVATE LIMITED Total | 9 | |||||||||
CRATIVE HOME MAKERS | P51700010264 | Konkan | Thane | CC006000000055334 | 2018 | Jul | Complete | N | N | 1 |
CC006000000057733 | 2019 | Jan | Complete | Y | N | 1 | ||||
CRATIVE HOME MAKERS Total | 2 | |||||||||
CRESCENT AMITY REALTORS PVT.LTD | P51800008480 | Konkan | Mumbai Suburban | CC006000000199013 | 2021 | Nov | Hearing Schedule | N | N | 1 |
CC006000000209434 | 2021 | Dec | Pending | N | N | 1 | ||||
CRESCENT AMITY REALTORS PVT.LTD Total | 2 | |||||||||
CRESCENT CONSTRUCTION COMPANY | P52000004697 | Konkan | Raigarh | CC006000000054883 | 2018 | Jun | Complete | N | N | 1 |
CC006000000055023 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000057316 | 2018 | Dec | Complete | Y | N | 1 | ||||
CC006000000057436 | 2018 | Dec | Complete | N | N | 1 | ||||
CRESCENT CONSTRUCTION COMPANY Total | 4 | |||||||||
CRESCENT REALTY DEVELOPERS PRIVATE LIMITED | P51800010460 | Konkan | Mumbai Suburban | CC006000000022915 | 2018 | Jan | Complete | N | N | 1 |
CRESCENT REALTY DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
CRYSTAL CONSTRUCTION CO | P51700004766 | Konkan | Thane | CC006000000100198 | 2019 | Aug | Complete | N | N | 1 |
CRYSTAL CONSTRUCTION CO Total | 1 | |||||||||
D P HOMES INFRAPROJECTS PRIVATE LIMITED | P51700015751 | Konkan | Thane | CC006000000192251 | 2021 | Feb | Hearing Schedule | N | N | 1 |
D P HOMES INFRAPROJECTS PRIVATE LIMITED Total | 1 | |||||||||
D. D. ASSOCIATES | P51700005623 | Konkan | Thane | CC006000000100306 | 2019 | Aug | Complete | N | N | 1 |
CC006000000198544 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
D. D. ASSOCIATES Total | 2 | |||||||||
D. K. Enterprises | P51700017723 | Konkan | Thane | CC006000000079158 | 2019 | May | Complete | N | N | 1 |
D. K. Enterprises Total | 1 | |||||||||
D. K. REALTY (INDIA) PVT. LTD. | P51800000340 | Konkan | Mumbai Suburban | CC006000000057845 | 2019 | Jan | Hearing Schedule | N | N | 1 |
CC006000000181992 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000196366 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196845 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197382 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198249 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
D. K. REALTY (INDIA) PVT. LTD. Total | 6 | |||||||||
D. S. KULKARNI DEVELOPERS LIMITED | P51800009465 | Konkan | Mumbai Suburban | CC006000000012065 | 2017 | Nov | Complete | Y | N | 1 |
CC006000000055709 | 2018 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000056176 | 2018 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000056245 | 2019 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000057144 | 2018 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000057149 | 2019 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000057152 | 2018 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000057179 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057830 | 2019 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000057969 | 2019 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000057988 | 2019 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000058073 | 2019 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000078359 | 2019 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000141208 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000161260 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
D. S. KULKARNI DEVELOPERS LIMITED Total | 15 | |||||||||
D.G.LAND DEVELOPERS PRIVATE LIMITED | P51800000446 | Konkan | Mumbai Suburban | CC006000000056675 | 2018 | Oct | Complete | Y | Y | 1 |
CC006000000110760 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000171568 | 2019 | Nov | Complete | N | N | 1 | ||||
P51800006581 | Konkan | Mumbai Suburban | CC006000000078225 | 2019 | Feb | Complete | N | N | 1 | |
P99000010407 | Konkan | Palghar | CC006000000023742 | 2018 | Mar | Complete | N | N | 1 | |
CC006000000023819 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000056896 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000056906 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000056907 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000057690 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078692 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000161373 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000171858 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000195127 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195188 | 2020 | Dec | Complete | N | N | 1 | ||||
D.G.LAND DEVELOPERS PRIVATE LIMITED Total | 15 | |||||||||
D.G.REALTY | P51800004398 | Konkan | Mumbai Suburban | CC006000000056500 | 2018 | Oct | Complete | N | N | 1 |
CC006000000056994 | 2018 | Nov | Complete | N | N | 1 | ||||
D.G.REALTY Total | 2 | |||||||||
DAMJI HARI CONSTRUCTIONS | P51700010871 | Konkan | Thane | CC006000000012194 | 2017 | Dec | Complete | Y | N | 1 |
CC006000000023163 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023305 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000044491 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056213 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000198693 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
DAMJI HARI CONSTRUCTIONS Total | 6 | |||||||||
DAMJI HARI INFRASTRUCTURE PVT LTD | P51700010181 | Konkan | Thane | CC006000000023922 | 2018 | Mar | Complete | N | N | 1 |
CC006000000044278 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000078378 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078416 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000196689 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
DAMJI HARI INFRASTRUCTURE PVT LTD Total | 5 | |||||||||
Damji Shamji Realty Private Limited | P51700009513 | Konkan | Thane | CC006000000012611 | 2017 | Dec | Complete | N | N | 1 |
Damji Shamji Realty Private Limited Total | 1 | |||||||||
Damodar Suruchi Developers Pvt. Ltd. | P51800007275 | Konkan | Mumbai Suburban | CC006000000001233 | 2017 | Oct | Complete | N | N | 1 |
CC006000000012681 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000054770 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000078501 | 2019 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000079504 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000100204 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000194302 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
Damodar Suruchi Developers Pvt. Ltd. Total | 7 | |||||||||
DARSHAN DEVELOPERS | P99000004844 | Konkan | Palghar | CC006000000078832 | 2019 | Apr | Complete | Y | N | 1 |
DARSHAN DEVELOPERS Total | 1 | |||||||||
DARSHAN SAGAR DEVELOPERS | P51700005172 | Konkan | Thane | CC006000000023952 | 2018 | Jun | Complete | Y | Y | 1 |
CC006000000079030 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000090095 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000090119 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000171469 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000196615 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
DARSHAN SAGAR DEVELOPERS Total | 6 | |||||||||
DARVESH PROPERTIES PRIVATE LIMITED | P51700005672 | Konkan | Thane | CC006000000057856 | 2019 | Jan | Complete | N | N | 1 |
CC006000000058066 | 2019 | Feb | Complete | Y | Y | 1 | ||||
CC006000000194863 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194874 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000196151 | 2021 | Feb | Pending | N | N | 1 | ||||
CC006000000196501 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196611 | 2021 | Apr | Pending | N | N | 1 | ||||
CC006000000197747 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000209668 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
P51900005346 | Konkan | Mumbai City | CC006000000199074 | 2021 | Dec | Hearing Schedule | N | N | 1 | |
DARVESH PROPERTIES PRIVATE LIMITED Total | 10 | |||||||||
DAYANAND TULASHIRAM KIRATKAR | P51700021185 | Konkan | Thane | CC006000000120931 | 2019 | Sep | Complete | Y | N | 1 |
DAYANAND TULASHIRAM KIRATKAR Total | 1 | |||||||||
DDPL GLOBAL INFRASTRUCTURE PVT. LTD. | P99000006463 | Konkan | Palghar | CC006000000057822 | 2019 | Jan | Hearing Schedule | N | N | 1 |
DDPL GLOBAL INFRASTRUCTURE PVT. LTD. Total | 1 | |||||||||
DEDHIA BUILDERS AND DEVELOPERS (INDIA) LLP | P51700001985 | Konkan | Thane | CC006000000055269 | 2018 | Jul | Complete | N | N | 1 |
CC006000000055285 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055287 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055290 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055291 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055293 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000078839 | 2019 | Apr | Complete | N | N | 1 | ||||
DEDHIA BUILDERS AND DEVELOPERS (INDIA) LLP Total | 7 | |||||||||
DEEP HOMES & CONSTRUCTIONS LLP | P51700009177 | Konkan | Thane | CC006000000090062 | 2019 | Jul | Complete | N | N | 1 |
CC006000000195131 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195688 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000197018 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197101 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197106 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197755 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197756 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197757 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197758 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197759 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197761 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197762 | 2021 | Jul | Complete | N | N | 1 | ||||
CC006000000197774 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197775 | 2021 | Jul | Complete | N | N | 1 | ||||
CC006000000197776 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197920 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198260 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000199186 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
DEEP HOMES & CONSTRUCTIONS LLP Total | 19 | |||||||||
DEEPA SURESH GADA | P51700015621 | Konkan | Thane | CC006000000161420 | 2019 | Nov | Complete | N | N | 1 |
DEEPA SURESH GADA Total | 1 | |||||||||
DEEPAK PANDURANG BHALEKAR | P52800013453 | Konkan | Ratnagiri | CC006000000192436 | 2020 | Feb | Complete | Y | N | 1 |
DEEPAK PANDURANG BHALEKAR Total | 1 | |||||||||
DEEPAK RAJENDRA JAIN | P51700001622 | Konkan | Thane | CC006000000056268 | 2018 | Sep | Complete | N | N | 1 |
CC006000000057059 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057638 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000192234 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192465 | 2020 | Feb | Complete | N | N | 1 | ||||
DEEPAK RAJENDRA JAIN Total | 5 | |||||||||
DEEPAK SHANKAR YASHWANTE | P51700011174 | Konkan | Thane | CC006000000054564 | 2018 | Jun | Complete | Y | N | 1 |
CC006000000054870 | 2018 | Jun | Complete | Y | N | 1 | ||||
DEEPAK SHANKAR YASHWANTE Total | 2 | |||||||||
DEEPJYOTI INFRA DEVELOPERS | P52000005307 | Konkan | Raigarh | CC006000000193769 | 2020 | Aug | Complete | N | N | 1 |
CC006000000198286 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
DEEPJYOTI INFRA DEVELOPERS Total | 2 | |||||||||
Delta venture | P51700009969 | Konkan | Thane | CC006000000161331 | 2019 | Nov | Complete | N | N | 1 |
Delta venture Total | 1 | |||||||||
DENNIS JAMES FERNANDES | P51800009781 | Konkan | Mumbai Suburban | CC006000000001939 | 2017 | Nov | Complete | Y | N | 1 |
CC006000000057815 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000194857 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194858 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000199181 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000199182 | 2021 | Nov | Pending | N | N | 1 | ||||
DENNIS JAMES FERNANDES Total | 6 | |||||||||
DESAI RESIDENCY PRIVATE LIMITED | P51900009455 | Konkan | Mumbai City | CC006000000193619 | 2020 | Jul | Hearing Schedule | N | N | 1 |
DESAI RESIDENCY PRIVATE LIMITED Total | 1 | |||||||||
DESAI RESIDENCY PVT.LTD | P51900005231 | Konkan | Mumbai City | CC006000000044259 | 2018 | Apr | Complete | N | N | 1 |
DESAI RESIDENCY PVT.LTD Total | 1 | |||||||||
DEV ENTERPRISES | P52000010674 | Konkan | Raigarh | CC006000000100283 | 2020 | Jan | Hearing Schedule | N | N | 1 |
DEV ENTERPRISES Total | 1 | |||||||||
DEV LAND & HOUSING PRIVATE LIMITED | P51800005170 | Konkan | Mumbai Suburban | CC006000000089643 | 2019 | Jun | Complete | N | N | 1 |
DEV LAND & HOUSING PRIVATE LIMITED Total | 1 | |||||||||
DEV LAND & HOUSING PVT LTD | P51800003604 | Konkan | Mumbai Suburban | CC006000000001675 | 2017 | Nov | Complete | N | N | 1 |
DEV LAND & HOUSING PVT LTD Total | 1 | |||||||||
DEV REALITY CORPORATION | P51800011326 | Konkan | Mumbai Suburban | CC006000000056082 | 2018 | Sep | Complete | N | N | 1 |
CC006000000209474 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209475 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209489 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209498 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209502 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000209503 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209513 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209518 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209521 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209522 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
DEV REALITY CORPORATION Total | 11 | |||||||||
DEVINFRA BUILDERS AND DEVELOPERS LLP | P52000027253 | Konkan | Raigarh | CC006000000195619 | 2021 | Jan | Hearing Schedule | N | N | 1 |
DEVINFRA BUILDERS AND DEVELOPERS LLP Total | 1 | |||||||||
Devisha Infrastructure Private Limited | P52000012671 | Konkan | Raigarh | CC006000000001448 | 2017 | Oct | Complete | N | N | 1 |
Devisha Infrastructure Private Limited Total | 1 | |||||||||
DEVNANI DEVELOPERS | P51800017580 | Konkan | Mumbai Suburban | CC006000000079207 | 2019 | May | Complete | N | N | 1 |
DEVNANI DEVELOPERS Total | 1 | |||||||||
DGAINS BHOOMI NIRMAAN LIMITED | P52000009434 | Konkan | Raigarh | CC006000000012270 | 2017 | Dec | Complete | N | N | 1 |
CC006000000044454 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000044474 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000044493 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000044510 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000044511 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055138 | 2018 | Jun | Complete | N | N | 1 | ||||
DGAINS BHOOMI NIRMAAN LIMITED Total | 7 | |||||||||
DHAN INTERNATIONAL PVT LTD | P51800001637 | Konkan | Mumbai Suburban | CC006000000044519 | 2018 | May | Complete | Y | N | 1 |
DHAN INTERNATIONAL PVT LTD Total | 1 | |||||||||
DHANJI GELABHAI GALA | P51800012468 | Konkan | Mumbai Suburban | CC006000000171619 | 2019 | Nov | Complete | N | N | 1 |
DHANJI GELABHAI GALA Total | 1 | |||||||||
DHANSHREE DEVELOPERS PVT LTD | P51800012859 | Konkan | Mumbai Suburban | CC006000000001855 | 2017 | Nov | Complete | N | N | 1 |
CC006000000023855 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023856 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023864 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023877 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023929 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044077 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000055035 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055131 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000056149 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056233 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056237 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056306 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056520 | 2018 | Oct | Complete | N | N | 1 | ||||
P51800013116 | Konkan | Mumbai Suburban | CC006000000100471 | 2019 | Aug | Complete | N | N | 1 | |
CC006000000120981 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000161247 | 2019 | Oct | Complete | N | N | 1 | ||||
DHANSHREE DEVELOPERS PVT LTD Total | 17 | |||||||||
Dharmesh Constructions Private Limited | P51800002030 | Konkan | Mumbai Suburban | CC006000000056989 | 2018 | Nov | Complete | Y | N | 1 |
CC006000000193323 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000193823 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000194751 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000195002 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000196718 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196729 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000198364 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198429 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000199111 | 2021 | Nov | Pending | N | N | 1 | ||||
P51800004402 | Konkan | Mumbai Suburban | CC006000000079120 | 2019 | Jun | Complete | N | N | 1 | |
CC006000000194699 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000195869 | 2021 | Feb | Pending | N | N | 1 | ||||
CC006000000196466 | 2021 | Mar | Pending | N | N | 1 | ||||
CC006000000197157 | 2021 | Jun | Pending | N | N | 1 | ||||
P51800005395 | Konkan | Mumbai Suburban | CC006000000195104 | 2020 | Dec | Pending | N | N | 1 | |
P51800006759 | Konkan | Mumbai Suburban | CC006000000199188 | 2021 | Nov | Hearing Schedule | N | N | 1 | |
Dharmesh Constructions Private Limited Total | 17 | |||||||||
DHEERAJ P VOHRA | P51800011782 | Konkan | Mumbai Suburban | CC006000000057115 | 2018 | Nov | Complete | N | N | 1 |
DHEERAJ P VOHRA Total | 1 | |||||||||
DHOOT DEVELOPERS PVT. LTD. | P51800008534 | Konkan | Mumbai Suburban | CC006000000197294 | 2021 | Jun | Complete | N | N | 1 |
DHOOT DEVELOPERS PVT. LTD. Total | 1 | |||||||||
Dhruva Woollen Mills Pvt Ltd | P51700001095 | Konkan | Thane | CC006000000000259 | 2017 | Aug | Complete | N | N | 1 |
CC006000000001804 | 2017 | Nov | Complete | N | N | 1 | ||||
P51700004574 | Konkan | Thane | CC006000000000579 | 2017 | Sep | Complete | N | N | 1 | |
CC006000000000783 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001262 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001797 | 2017 | Nov | Complete | Y | N | 1 | ||||
CC006000000012487 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000012763 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000054955 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000078952 | 2019 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000078979 | 2019 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000079127 | 2019 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000079137 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079353 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089708 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100440 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000171826 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000193070 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193189 | 2020 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000193311 | 2020 | Jun | Pending | Y | N | 1 | ||||
CC006000000193857 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193978 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194816 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195178 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195358 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000195522 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195593 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000196360 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196384 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000197438 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198067 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198068 | 2021 | Aug | Complete | N | N | 1 | ||||
CC006000000198069 | 2021 | Aug | Complete | N | N | 1 | ||||
CC006000000209391 | 2021 | Dec | Pending | N | N | 1 | ||||
Dhruva Woollen Mills Pvt Ltd Total | 34 | |||||||||
DHRUVI PROPERTIES PVT LTD | P51800007232 | Konkan | Mumbai Suburban | CC006000000023328 | 2018 | Feb | Complete | N | N | 1 |
CC006000000055802 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056855 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000100392 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100424 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000195685 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000198679 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
DHRUVI PROPERTIES PVT LTD Total | 7 | |||||||||
DIGNITY REALTY | P51900015103 | Konkan | Mumbai City | CC006000000055539 | 2018 | Jul | Complete | N | N | 1 |
CC006000000198363 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
DIGNITY REALTY Total | 2 | |||||||||
DIKSHA DEVELOPERS | P51700009777 | Konkan | Thane | CC006000000120932 | 2019 | Sep | Complete | Y | N | 1 |
CC006000000192645 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000197557 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
DIKSHA DEVELOPERS Total | 3 | |||||||||
DILIP ESTATE & TOWN PLANNERS PVT LTD | P51900006119 | Konkan | Mumbai City | CC006000000044219 | 2018 | Apr | Complete | N | N | 1 |
CC006000000192175 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192274 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000193203 | 2020 | May | Complete | N | N | 1 | ||||
CC006000000194822 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000194824 | 2020 | Nov | Pending | N | N | 1 | ||||
P51900009030 | Konkan | Mumbai City | CC006000000000981 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000209836 | 2022 | Jan | Pending | N | N | 1 | ||||
DILIP ESTATE & TOWN PLANNERS PVT LTD Total | 8 | |||||||||
DILIP HIRALAL DOSHI | P51800009426 | Konkan | Mumbai Suburban | CC006000000209430 | 2021 | Dec | Pending | N | N | 1 |
DILIP HIRALAL DOSHI Total | 1 | |||||||||
Dilip Madhukar Dalvi | P51700012542 | Konkan | Thane | CC006000000196379 | 2021 | Mar | Hearing Schedule | N | N | 1 |
CC006000000197948 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
Dilip Madhukar Dalvi Total | 2 | |||||||||
Dimension Housing Realty LLP | P51800001222 | Konkan | Mumbai Suburban | CC006000000100584 | 2019 | Aug | Complete | N | N | 1 |
Dimension Housing Realty LLP Total | 1 | |||||||||
DIMPY INFRA VENTURES PVT LTD | P51700010350 | Konkan | Thane | CC006000000195680 | 2021 | Nov | Hearing Schedule | N | N | 1 |
DIMPY INFRA VENTURES PVT LTD Total | 1 | |||||||||
Dinesh C Agarwal | P51800011231 | Konkan | Mumbai Suburban | CC006000000023908 | 2018 | Mar | Complete | N | N | 1 |
Dinesh C Agarwal Total | 1 | |||||||||
DINESH S CHANDNANI | P51800004753 | Konkan | Mumbai Suburban | CC006000000012246 | 2017 | Dec | Complete | N | N | 1 |
CC006000000012316 | 2017 | Dec | Complete | N | N | 1 | ||||
DINESH S CHANDNANI Total | 2 | |||||||||
Dinesh Shivajirao Ghadage | P51900005892 | Konkan | Mumbai City | CC006000000012686 | 2018 | Jan | Complete | Y | Y | 1 |
CC006000000012809 | 2018 | Jan | Complete | Y | N | 1 | ||||
CC006000000022825 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000023717 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000023926 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000044062 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000044127 | 2018 | Apr | Complete | Y | N | 1 | ||||
CC006000000044135 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000054810 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054928 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000110635 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110636 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110637 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110638 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110639 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000110641 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110642 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000197177 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197952 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
Dinesh Shivajirao Ghadage Total | 19 | |||||||||
Dipti Spaces Pvt. Ltd. | P51900002676 | Konkan | Mumbai Suburban | CC006000000044322 | 2018 | May | Complete | Y | Y | 1 |
CC006000000194832 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194876 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000197993 | 2021 | Aug | Complete | N | N | 1 | ||||
Dipti Spaces Pvt. Ltd. Total | 4 | |||||||||
DISHA DIRECT MARKETING SERVICES PVT LTD | P52000012762 | Konkan | Raigarh | CC006000000000871 | 2017 | Sep | Complete | Y | N | 1 |
CC006000000012538 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000055030 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055820 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000056298 | 2018 | Oct | Complete | Y | N | 1 | ||||
CC006000000057107 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057304 | 2018 | Dec | Complete | Y | Y | 1 | ||||
2020 | Sep | Complete | Y | Y | 1 | |||||
CC006000000057408 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057851 | 2019 | Jan | Complete | Y | N | 1 | ||||
CC006000000079472 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000089835 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000120963 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000195255 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
DISHA DIRECT MARKETING SERVICES PVT LTD Total | 14 | |||||||||
DIVINE DOLPHIN ENTERPRISES | P52000018320 | Konkan | Raigarh | CC006000000056804 | 2018 | Nov | Complete | N | N | 1 |
DIVINE DOLPHIN ENTERPRISES Total | 1 | |||||||||
DIYA BUILDERS AND DEVELOPERS | P52000017911 | Konkan | Raigarh | CC006000000056569 | 2018 | Oct | Complete | N | N | 1 |
DIYA BUILDERS AND DEVELOPERS Total | 1 | |||||||||
DK CONSTRUCTION BUILDER AND LAND DEVELOPER | P51900004951 | Konkan | Mumbai City | CC006000000089794 | 2019 | Jun | Complete | N | N | 1 |
DK CONSTRUCTION BUILDER AND LAND DEVELOPER Total | 1 | |||||||||
Dolphin Developers | P51800009033 | Konkan | Mumbai Suburban | CC006000000209403 | 2021 | Dec | Pending | N | N | 1 |
Dolphin Developers Total | 1 | |||||||||
DOSTI ENTERPRISES | P51700006565 | Konkan | Thane | CC006000000000979 | 2017 | Sep | Complete | N | N | 1 |
CC006000000022928 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000193831 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000195054 | 2020 | Dec | Complete | N | N | 1 | ||||
P51700015258 | Konkan | Thane | CC006000000078532 | 2019 | Mar | Complete | N | N | 1 | |
CC006000000193230 | 2020 | May | Complete | N | N | 1 | ||||
P51700025834 | Konkan | Thane | CC006000000196371 | 2021 | Mar | Complete | N | N | 1 | |
CC006000000197303 | 2021 | Jun | Complete | N | N | 1 | ||||
CC006000000198318 | 2021 | Sep | Complete | N | N | 1 | ||||
DOSTI ENTERPRISES Total | 9 | |||||||||
DOSTI REALTY LTD | P51700010988 | Konkan | Thane | CC006000000110675 | 2019 | Sep | Hearing Schedule | N | N | 1 |
DOSTI REALTY LTD Total | 1 | |||||||||
DREAMS CONSTRUCTION COMPANY | P99000014129 | Konkan | Palghar | CC006000000001902 | 2017 | Nov | Complete | N | N | 1 |
CC006000000078272 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078931 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000199171 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
DREAMS CONSTRUCTION COMPANY Total | 4 | |||||||||
Dreamz Realty | P52000016465 | Konkan | Raigarh | CC006000000192892 | 2020 | Mar | Complete | N | N | 1 |
CC006000000192893 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192895 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192900 | 2020 | Mar | Complete | N | N | 1 | ||||
Dreamz Realty Total | 4 | |||||||||
Drushti Realtors | P51800007499 | Konkan | Mumbai Suburban | CC006000000000517 | 2017 | Sep | Complete | N | N | 1 |
CC006000000044453 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055947 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055958 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055959 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055969 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056345 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000057762 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078345 | 2019 | Mar | Complete | N | N | 1 | ||||
Drushti Realtors Total | 9 | |||||||||
DWARIKA REAL INFRA LLP | P52000003025 | Konkan | Raigarh | CC006000000161332 | 2019 | Nov | Complete | Y | N | 1 |
CC006000000193139 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193140 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196308 | 2021 | Mar | Complete | N | N | 1 | ||||
DWARIKA REAL INFRA LLP Total | 4 | |||||||||
DYNAMIX CONTRACTORS & BUILDERS PRIVATE LIMITED | P51800018784 | Konkan | Mumbai Suburban | CC006000000195632 | 2021 | Jan | Hearing Schedule | N | N | 1 |
DYNAMIX CONTRACTORS & BUILDERS PRIVATE LIMITED Total | 1 | |||||||||
EASHANYA BUILDER AND DEVELOPERS | P51700013866 | Konkan | Thane | CC006000000197356 | 2021 | Jun | Hearing Schedule | N | N | 1 |
EASHANYA BUILDER AND DEVELOPERS Total | 1 | |||||||||
EAST AND WEST BUILDERS | P51800002906 | Konkan | Mumbai Suburban | CC006000000057612 | 2019 | Jan | Complete | N | N | 1 |
CC006000000058085 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000110787 | 2019 | Sep | Complete | N | N | 1 | ||||
P51800009296 | Konkan | Mumbai Suburban | CC006000000196393 | 2021 | Mar | Hearing Schedule | N | N | 1 | |
CC006000000196396 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196404 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
P51900011167 | Konkan | Mumbai City | CC006000000012384 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000055306 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056095 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056225 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000056536 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056790 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000079456 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000089649 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100538 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000196118 | 2021 | Feb | Complete | N | N | 1 | ||||
EAST AND WEST BUILDERS Total | 16 | |||||||||
EASTERN SAI SWAYAM | P51800009824 | Konkan | Mumbai Suburban | CC006000000057494 | 2019 | Jan | Complete | N | N | 1 |
EASTERN SAI SWAYAM Total | 1 | |||||||||
ECC-DB JOINT VENTURE | P51800012155 | Konkan | Mumbai Suburban | CC006000000000441 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000497 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000055239 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055984 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000100232 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000192744 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000195431 | 2020 | Dec | Pending | N | N | 1 | ||||
CC006000000195434 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195438 | 2020 | Dec | Pending | N | N | 1 | ||||
CC006000000195440 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196602 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
ECC-DB JOINT VENTURE Total | 11 | |||||||||
Ecohomes Constructions Pvt. Ltd. | P51800002116 | Konkan | Mumbai Suburban | CC006000000199246 | 2021 | Dec | Pending | N | N | 1 |
Ecohomes Constructions Pvt. Ltd. Total | 1 | |||||||||
Ecopark Developers LLP | P51800000639 | Konkan | Mumbai Suburban | CC006000000193973 | 2020 | Sep | Hearing Schedule | N | N | 1 |
Ecopark Developers LLP Total | 1 | |||||||||
Ekdant Constructions and Developers Private Limited | P51700012381 | Konkan | Thane | CC006000000110744 | 2019 | Aug | Complete | N | N | 1 |
Ekdant Constructions and Developers Private Limited Total | 1 | |||||||||
EKTA EVERGLADE HOMES PRIVATE LIMITED | P51800000731 | Konkan | Mumbai Suburban | CC006000000044008 | 2018 | Apr | Complete | N | N | 1 |
CC006000000110706 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000192203 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000199169 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
P51800000947 | Konkan | Mumbai Suburban | CC006000000000113 | 2017 | Aug | Complete | Y | Y | 1 | |
CC006000000012703 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000054656 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056721 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000057923 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000089941 | 2019 | Jul | Complete | N | N | 1 | ||||
2020 | Dec | Complete | N | N | 1 | |||||
CC006000000090164 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000151216 | 2019 | Oct | Pending | N | N | 1 | ||||
CC006000000161434 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000161455 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000171529 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171797 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192835 | 2020 | Mar | Pending | N | N | 1 | ||||
CC006000000192977 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193895 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000194343 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194799 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195024 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195507 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195508 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000198875 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199156 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000209428 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209554 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209758 | 2022 | Jan | Pending | N | N | 1 | ||||
EKTA EVERGLADE HOMES PRIVATE LIMITED Total | 30 | |||||||||
EKTA HOUSING PRIVATE LIMITED | P99000000417 | Konkan | Palghar | CC006000000001053 | 2017 | Oct | Complete | N | N | 1 |
CC006000000044071 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000141195 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000171927 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000196407 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000198633 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199183 | 2021 | Dec | Pending | N | N | 1 | ||||
EKTA HOUSING PRIVATE LIMITED Total | 7 | |||||||||
EKTA PARKSVILLE HOMES PVT. LTD. | P99000000109 | Konkan | Palghar | CC006000000000260 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000431 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000000447 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000000581 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000793 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000992 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000001113 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001347 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001507 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000012406 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000012480 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000012622 | 2017 | Dec | Complete | Y | Y | 1 | ||||
CC006000000022948 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023235 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023252 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023287 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000023295 | 2018 | Feb | Hearing Schedule | Y | N | 1 | ||||
CC006000000023358 | 2018 | Feb | Complete | Y | N | 1 | ||||
CC006000000023390 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000023818 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044189 | 2019 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000044392 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054776 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054788 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054834 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055556 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056385 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056590 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056957 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000056995 | 2018 | Nov | Complete | Y | N | 1 | ||||
CC006000000057493 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057651 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000058067 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000078538 | 2019 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000078793 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078968 | 2019 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000079055 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079060 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000079061 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000079062 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000090063 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000110668 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000110851 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000171749 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000171777 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171825 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000193288 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000193289 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000194199 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194903 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195285 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195402 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195503 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000195625 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000196283 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196391 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196540 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196730 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197434 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000198009 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198034 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198051 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198106 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198307 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198900 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
P99000000110 | Konkan | Palghar | CC006000000001592 | 2017 | Oct | Complete | Y | Y | 1 | |
CC006000000001950 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000023151 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000055170 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055175 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000057097 | 2019 | Feb | Pending | N | N | 1 | ||||
CC006000000057989 | 2019 | Feb | Pending | N | N | 1 | ||||
CC006000000197631 | 2021 | Jul | Pending | N | N | 1 | ||||
P99000000115 | Konkan | Palghar | CC006000000000461 | 2017 | Dec | Complete | Y | N | 1 | |
CC006000000000637 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000022958 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023194 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023360 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023737 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000044006 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000054811 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000054835 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055800 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000055848 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056635 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056638 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000057176 | 2018 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000078954 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000079020 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079300 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000100195 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000110792 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000171614 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000171742 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000181962 | 2019 | Dec | Pending | N | N | 1 | ||||
CC006000000192580 | 2020 | Feb | Pending | N | N | 1 | ||||
CC006000000192588 | 2020 | Feb | Pending | N | N | 1 | ||||
CC006000000194339 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194919 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000197935 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198221 | 2021 | Sep | Pending | N | N | 1 | ||||
P99000000116 | Konkan | Palghar | CC006000000000791 | 2017 | Sep | Complete | N | N | 1 | |
CC006000000001418 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000023361 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000054840 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055796 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056634 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056960 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057504 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078739 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089587 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100250 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000171485 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000195910 | 2021 | Feb | Complete | Y | N | 1 | ||||
CC006000000196518 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196581 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
P99000000134 | Konkan | Palghar | CC006000000000049 | 2017 | Aug | Complete | N | N | 1 | |
CC006000000054695 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000198609 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
P99000000148 | Konkan | Palghar | CC006000000001076 | 2017 | Oct | Complete | Y | N | 1 | |
CC006000000012698 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000141021 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000193345 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000194189 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000196205 | 2021 | Mar | Pending | N | N | 1 | ||||
CC006000000196425 | 2021 | Mar | Pending | N | N | 1 | ||||
P99000015239 | Konkan | Palghar | CC006000000197508 | 2021 | Jul | Hearing Schedule | N | N | 1 | |
EKTA PARKSVILLE HOMES PVT. LTD. Total | 127 | |||||||||
EKTA SHUBHAM VENTURE | P51800000141 | Konkan | Mumbai Suburban | CC006000000171593 | 2020 | Jan | Complete | Y | N | 1 |
P51800001112 | Konkan | Mumbai Suburban | CC006000000044266 | 2018 | Apr | Complete | N | N | 1 | |
EKTA SHUBHAM VENTURE Total | 2 | |||||||||
Ekta Supreme Corporation | P51800000908 | Konkan | Mumbai Suburban | CC006000000001097 | 2017 | Oct | Complete | N | N | 1 |
CC006000000023132 | 2018 | Feb | Complete | N | N | 1 | ||||
Ekta Supreme Corporation Total | 2 | |||||||||
EKTA WORLD PRIVATE LIMITED | P51800021089 | Konkan | Mumbai Suburban | CC006000000199068 | 2021 | Dec | Hearing Schedule | N | N | 1 |
P51900000192 | Konkan | Mumbai City | CC006000000023341 | 2018 | Feb | Complete | N | N | 1 | |
EKTA WORLD PRIVATE LIMITED Total | 2 | |||||||||
EKVEERA SKYLINER CONSTRUCTION CO PRIVATE LIMITED | P51700012282 | Konkan | Thane | CC006000000192998 | 2020 | Mar | Complete | N | N | 1 |
CC006000000198991 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
EKVEERA SKYLINER CONSTRUCTION CO PRIVATE LIMITED Total | 2 | |||||||||
Elinor Infra LLP | P52000009702 | Konkan | Raigarh | CC006000000055898 | 2018 | Aug | Complete | N | N | 1 |
Elinor Infra LLP Total | 1 | |||||||||
Elite Housing Developers LLP | P51900007928 | Konkan | Mumbai City | CC006000000057803 | 2019 | Jan | Complete | N | N | 1 |
CC006000000079230 | 2019 | May | Complete | N | N | 1 | ||||
Elite Housing Developers LLP Total | 2 | |||||||||
Ellora Realcon LLP | P51700006180 | Konkan | Thane | CC006000000193074 | 2020 | Mar | Hearing Schedule | N | N | 1 |
Ellora Realcon LLP Total | 1 | |||||||||
EMPIRE INDUSTRIES LIMITED | P51700006096 | Konkan | Thane | CC006000000023871 | 2018 | Apr | Complete | N | N | 1 |
CC006000000057265 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057785 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000079115 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000194136 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000195785 | 2021 | Jan | Complete | N | N | 1 | ||||
EMPIRE INDUSTRIES LIMITED Total | 6 | |||||||||
EMPRESS DEVELOPERS | P51900007758 | Konkan | Mumbai City | CC006000000195888 | 2021 | Feb | Hearing Schedule | N | N | 1 |
EMPRESS DEVELOPERS Total | 1 | |||||||||
ENTEE DEVELOPERS | P51800002874 | Konkan | Mumbai Suburban | CC006000000056641 | 2018 | Oct | Complete | N | N | 1 |
CC006000000056701 | 2018 | Oct | Complete | N | N | 1 | ||||
ENTEE DEVELOPERS Total | 2 | |||||||||
EPITOME RESIDENCY PRIVATE LIMITED | P51800003270 | Konkan | Mumbai Suburban | CC006000000001071 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001627 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000044119 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000044204 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044398 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054950 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000057670 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078533 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000089970 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090150 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000110896 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000110897 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141025 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000181965 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192230 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192262 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000192323 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192512 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000193081 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193082 | 2020 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000193254 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000196315 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000199198 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209491 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209492 | 2021 | Dec | Pending | N | N | 1 | ||||
EPITOME RESIDENCY PRIVATE LIMITED Total | 25 | |||||||||
ERA REALTORS PRIVATE LIMITED | P51800010463 | Konkan | Mumbai Suburban | CC006000000001028 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001783 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000001908 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000001919 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012202 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000012376 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023920 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044186 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000044309 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054567 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054677 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054856 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000056045 | 2019 | Feb | Complete | Y | Y | 1 | ||||
CC006000000057087 | 2018 | Dec | Complete | Y | N | 1 | ||||
CC006000000057248 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057858 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000058049 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000058061 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058126 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078224 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078239 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000079233 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079234 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079235 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089596 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100264 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100494 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100511 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100600 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000141005 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141011 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141012 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141013 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141145 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000171571 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171587 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171604 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000171794 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171944 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000192282 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000193128 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193280 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000193387 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193609 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193623 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193731 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000193767 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193792 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000193954 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000193955 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000193982 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000194232 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194298 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194379 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194835 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195073 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195323 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195517 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195601 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195603 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195605 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195606 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195607 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195615 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195620 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195621 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195623 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195654 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195755 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195922 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000195940 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196244 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196479 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196494 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196530 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196638 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196687 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196704 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196742 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196790 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196796 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196797 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196805 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196847 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196928 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197062 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197096 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197138 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197412 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197972 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000197998 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198082 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198088 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198089 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198450 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198512 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198561 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199339 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209351 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209404 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209451 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209454 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209476 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209735 | 2022 | Jan | Pending | N | N | 1 | ||||
ERA REALTORS PRIVATE LIMITED Total | 104 | |||||||||
ESSAR CONSTRUCTION COMPANY | P51800006762 | Konkan | Mumbai Suburban | CC006000000023550 | 2018 | Mar | Complete | N | N | 1 |
ESSAR CONSTRUCTION COMPANY Total | 1 | |||||||||
ESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED | P51900016554 | Konkan | Mumbai City | CC006000000196410 | 2021 | Mar | Hearing Schedule | N | N | 1 |
ESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED Total | 1 | |||||||||
ETCO BUILDERS PRIVATE LIMITED | P51800002429 | Konkan | Mumbai Suburban | CC006000000089992 | 2019 | Jul | Hearing Schedule | N | N | 1 |
CC006000000090097 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000090098 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000090099 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000090104 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000192453 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000192454 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000192803 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000198873 | 2021 | Nov | Pending | N | N | 1 | ||||
ETCO BUILDERS PRIVATE LIMITED Total | 9 | |||||||||
Ethics Infra Development Pvt. Ltd. | P51800000078 | Konkan | Mumbai Suburban | CC006000000198202 | 2021 | Dec | Hearing Schedule | N | N | 1 |
Ethics Infra Development Pvt. Ltd. Total | 1 | |||||||||
EVALIA PROJECTS & DEVELOPMENT PRIVATE LTD | P52000005298 | Konkan | Thane | CC006000000012528 | 2017 | Dec | Complete | N | N | 1 |
CC006000000055137 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000055563 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056122 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000057279 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057970 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068162 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000161411 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000161414 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000161449 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000171917 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000192804 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000195360 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195443 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195714 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000196134 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000197870 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000209589 | 2022 | Jan | Pending | N | N | 1 | ||||
EVALIA PROJECTS & DEVELOPMENT PRIVATE LTD Total | 18 | |||||||||
EVERSHINE BUILDERS PRIVATE LIMITED | P51800003631 | Konkan | Mumbai Suburban | CC006000000001761 | 2017 | Nov | Complete | N | N | 1 |
CC006000000090013 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000090014 | 2019 | Jul | Complete | Y | N | 1 | ||||
EVERSHINE BUILDERS PRIVATE LIMITED Total | 3 | |||||||||
Evie Real Estate Private Limited | P51800001296 | Konkan | Mumbai Suburban | CC006000000001068 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001820 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000023332 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000044025 | 2018 | Apr | Complete | N | N | 1 | ||||
2020 | Jan | Complete | N | N | 1 | |||||
CC006000000056002 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000195613 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000209443 | 2021 | Dec | Pending | N | N | 1 | ||||
P51800001670 | Konkan | Mumbai Suburban | CC006000000194273 | 2020 | Oct | Hearing Schedule | N | N | 1 | |
P51800001903 | Konkan | Mumbai Suburban | CC006000000023588 | 2018 | Mar | Complete | N | N | 1 | |
CC006000000056166 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000171815 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
P51800005684 | Konkan | Mumbai Suburban | CC006000000012174 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000023050 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000056705 | 2018 | Nov | Complete | N | N | 1 | ||||
Evie Real Estate Private Limited Total | 15 | |||||||||
Excel Enterprises | P51800014623 | Konkan | Mumbai Suburban | CC006000000012692 | 2018 | Jan | Complete | N | N | 1 |
Excel Enterprises Total | 1 | |||||||||
EXCELLENT REALTOR DEVELOPERS | P51900004434 | Konkan | Mumbai City | CC006000000055604 | 2018 | Aug | Complete | Y | N | 1 |
CC006000000057688 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000078983 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000198230 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000209755 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
EXCELLENT REALTOR DEVELOPERS Total | 5 | |||||||||
FAIRDEAL CONSTRUCTIONS | P51900003402 | Konkan | Mumbai City | CC006000000078342 | 2019 | Mar | Hearing Schedule | N | N | 1 |
CC006000000078394 | 2019 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000078778 | 2019 | Apr | Hearing Schedule | N | N | 1 | ||||
FAIRDEAL CONSTRUCTIONS Total | 3 | |||||||||
FAIRMONT CONSTRUCTIONS PRIVATE LIMITED | P51800003351 | Konkan | Mumbai Suburban | CC006000000195368 | 2020 | Dec | Hearing Schedule | N | N | 1 |
FAIRMONT CONSTRUCTIONS PRIVATE LIMITED Total | 1 | |||||||||
Fairmont Lifespaces LLP | P51800014750 | Konkan | Mumbai Suburban | CC006000000194087 | 2020 | Sep | Pending | N | N | 1 |
Fairmont Lifespaces LLP Total | 1 | |||||||||
Faithfull Developers | P51900003161 | Konkan | Mumbai City | CC006000000057611 | 2019 | Jan | Complete | N | N | 1 |
CC006000000161259 | 2019 | Oct | Complete | N | N | 1 | ||||
Faithfull Developers Total | 2 | |||||||||
Faizunnisa Farooque Sayed | P51700013500 | Konkan | Thane | CC006000000054622 | 2018 | Jun | Complete | N | N | 1 |
CC006000000120939 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000198173 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198612 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198613 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198616 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198618 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198623 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198624 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
Faizunnisa Farooque Sayed Total | 9 | |||||||||
FALAKDEVELOPER | P51900013072 | Konkan | Mumbai City | CC006000000056616 | 2018 | Oct | Complete | Y | N | 1 |
CC006000000057154 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000194895 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
FALAKDEVELOPER Total | 3 | |||||||||
FALCON DWELLERS PRIVATE LIMITED | P51800004662 | Konkan | Mumbai Suburban | CC006000000056389 | 2018 | Oct | Complete | N | N | 1 |
CC006000000056416 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056542 | 2018 | Oct | Complete | Y | N | 1 | ||||
CC006000000194083 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000195759 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000197823 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
P51800007188 | Konkan | Mumbai Suburban | CC006000000110921 | 2019 | Sep | Complete | Y | N | 1 | |
CC006000000120936 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000197829 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197831 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
FALCON DWELLERS PRIVATE LIMITED Total | 10 | |||||||||
FATCAT INFRASTRCTURE PRIVATE LIMITED | P51800008276 | Konkan | Mumbai Suburban | CC006000000057231 | 2018 | Dec | Hearing Schedule | N | N | 1 |
FATCAT INFRASTRCTURE PRIVATE LIMITED Total | 1 | |||||||||
FATIMA ARCH & DEVELOPERS | P51800013857 | Konkan | Mumbai Suburban | CC006000000193262 | 2020 | Jun | Complete | N | N | 1 |
CC006000000193265 | 2020 | Jun | Pending | N | N | 1 | ||||
CC006000000193268 | 2020 | Jun | Pending | N | N | 1 | ||||
CC006000000193307 | 2020 | Jun | Complete | N | N | 1 | ||||
CC006000000193595 | 2020 | Jul | Complete | N | N | 1 | ||||
FATIMA ARCH & DEVELOPERS Total | 5 | |||||||||
Firoz UsmanTinwala | P51900010592 | Konkan | Mumbai City | CC006000000001235 | 2017 | Oct | Complete | Y | Y | 1 |
CC006000000001813 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012471 | 2017 | Dec | Complete | N | N | 1 | ||||
Firoz UsmanTinwala Total | 3 | |||||||||
FIRST STONE | P51900001589 | Konkan | Mumbai City | CC006000000078958 | 2019 | Apr | Complete | Y | N | 1 |
CC006000000079012 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000079013 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000197777 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197778 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197779 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
FIRST STONE Total | 6 | |||||||||
Firstlight Properties Private Limited | P51900011726 | Konkan | Mumbai City | CC006000000056070 | 2018 | Sep | Complete | N | N | 1 |
Firstlight Properties Private Limited Total | 1 | |||||||||
FIVESTAR REALTORS | P99000009505 | Konkan | Palghar | CC006000000012279 | 2018 | Aug | Complete | Y | N | 1 |
CC006000000057182 | 2019 | Apr | Complete | Y | Y | 1 | ||||
FIVESTAR REALTORS Total | 2 | |||||||||
FORBES & COMPANY LIMITED | P51800002564 | Konkan | Mumbai Suburban | CC006000000195085 | 2020 | Nov | Hearing Schedule | N | N | 1 |
CC006000000195107 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195226 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195235 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195296 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195326 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195329 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196395 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196706 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196777 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196781 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196934 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197165 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198138 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
FORBES & COMPANY LIMITED Total | 14 | |||||||||
Forefront Private Limited | P51800010015 | Konkan | Mumbai Suburban | CC006000000023293 | 2018 | Feb | Complete | N | N | 1 |
Forefront Private Limited Total | 1 | |||||||||
Fortune Infracreators Private Limited | P51700001150 | Konkan | Thane | CC006000000078172 | 2019 | Feb | Complete | N | N | 1 |
P51700002741 | Konkan | Thane | CC006000000001481 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000055586 | 2018 | Jul | Complete | N | N | 1 | ||||
P51700025980 | Konkan | Thane | CC006000000196475 | 2021 | Apr | Hearing Schedule | N | N | 1 | |
Fortune Infracreators Private Limited Total | 4 | |||||||||
Forum Homes Pvt Ltd | P51800011662 | Konkan | Mumbai Suburban | CC006000000078849 | 2019 | Apr | Complete | N | N | 1 |
CC006000000197447 | 2021 | Jun | Pending | N | N | 1 | ||||
Forum Homes Pvt Ltd Total | 2 | |||||||||
FUTURE HOMES CONSTRUCTIONS | P52000006255 | Konkan | Raigarh | CC006000000194354 | 2020 | Oct | Hearing Schedule | N | N | 1 |
FUTURE HOMES CONSTRUCTIONS Total | 1 | |||||||||
G A Builders Pvt Ltd. | P51800004855 | Konkan | Mumbai Suburban | CC006000000012265 | 2017 | Dec | Complete | N | N | 1 |
P51800009310 | Konkan | Mumbai Suburban | CC006000000195337 | 2020 | Dec | Hearing Schedule | N | N | 1 | |
G A Builders Pvt Ltd. Total | 2 | |||||||||
G F REALITY PRIVATE LIMITED | P51800015512 | Konkan | Mumbai Suburban | CC006000000057594 | 2019 | Jan | Complete | Y | Y | 1 |
G F REALITY PRIVATE LIMITED Total | 1 | |||||||||
G S A CONSTRUCTIONS | P51900009097 | Konkan | Mumbai City | CC006000000054646 | 2018 | May | Complete | N | N | 1 |
CC006000000054972 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000161301 | 2020 | Feb | Complete | N | N | 1 | ||||
G S A CONSTRUCTIONS Total | 3 | |||||||||
G.S. DEVELOPERS | P51800003297 | Konkan | Mumbai Suburban | CC006000000193880 | 2020 | Aug | Hearing Schedule | N | N | 1 |
G.S. DEVELOPERS Total | 1 | |||||||||
GADIRAJU SUBRAMANYAM RAJU PROPRIETOR OF TIRUPATHI ENTERPRISES | P51800000118 | Konkan | Mumbai Suburban | CC006000000079076 | 2019 | May | Complete | N | N | 1 |
CC006000000194561 | 2020 | Oct | Complete | N | N | 1 | ||||
GADIRAJU SUBRAMANYAM RAJU PROPRIETOR OF TIRUPATHI ENTERPRISES Total | 2 | |||||||||
Gadkari Builders & Associates | P51900011095 | Konkan | Mumbai Suburban | CC006000000001763 | 2017 | Nov | Complete | Y | N | 1 |
CC006000000023437 | 2018 | Feb | Complete | Y | N | 1 | ||||
CC006000000056142 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056153 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056155 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056159 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056160 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056224 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056358 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056565 | 2018 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000089820 | 2019 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000195464 | 2020 | Dec | Complete | N | N | 1 | ||||
Gadkari Builders & Associates Total | 12 | |||||||||
Gajaanan Property Developers Private Limited | P51800020208 | Konkan | Mumbai Suburban | CC006000000209567 | 2022 | Jan | Pending | N | N | 1 |
CC006000000209578 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209664 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209666 | 2022 | Jan | Pending | N | N | 1 | ||||
Gajaanan Property Developers Private Limited Total | 4 | |||||||||
Gajra Home Makers Pvt. Ltd. | P51700004303 | Konkan | Thane | CC006000000193465 | 2020 | Jul | Hearing Schedule | N | N | 1 |
CC006000000193487 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193496 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193501 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193503 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193507 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193514 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193519 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193527 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193535 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193542 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193670 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193674 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
Gajra Home Makers Pvt. Ltd. Total | 13 | |||||||||
GALAXY DEVELOPERS | P52800014124 | Konkan | Ratnagiri | CC006000000056863 | 2018 | Nov | Complete | Y | Y | 1 |
CC006000000195448 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195612 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195614 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
GALAXY DEVELOPERS Total | 4 | |||||||||
Ganga Estate Developers | P51700010265 | Konkan | Thane | CC006000000199154 | 2022 | Jan | Pending | N | N | 1 |
Ganga Estate Developers Total | 1 | |||||||||
Garnet Construction Limited | P51800005369 | Konkan | Mumbai Suburban | CC006000000171745 | 2019 | Dec | Complete | N | N | 1 |
P52000019720 | Konkan | Raigarh | CC006000000196712 | 2021 | Apr | Hearing Schedule | N | N | 1 | |
CC006000000196721 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
Garnet Construction Limited Total | 3 | |||||||||
Garnet Construction Ltd. | P52000004503 | Konkan | Raigarh | CC006000000000409 | 2017 | Sep | Complete | N | N | 1 |
CC006000000171597 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000194508 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000195004 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000196098 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000196539 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
Garnet Construction Ltd. Total | 6 | |||||||||
GAURANG ASSOCIATES | P51700009458 | Konkan | Thane | CC006000000110926 | 2019 | Sep | Complete | N | N | 1 |
CC006000000209623 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
P51700015176 | Konkan | Thane | CC006000000193255 | 2020 | May | Hearing Schedule | N | N | 1 | |
CC006000000209360 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209365 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209374 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209387 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209458 | 2021 | Dec | Pending | N | N | 1 | ||||
GAURANG ASSOCIATES Total | 8 | |||||||||
GAURANG PROPERTIES PVT. LTD. | P51700002762 | Konkan | Thane | CC006000000198433 | 2021 | Sep | Hearing Schedule | N | N | 1 |
P51700003748 | Konkan | Thane | CC006000000195066 | 2020 | Nov | Hearing Schedule | N | N | 1 | |
GAURANG PROPERTIES PVT. LTD. Total | 2 | |||||||||
GAURAV ENTERPRISES | P51700007793 | Konkan | Thane | CC006000000209712 | 2022 | Jan | Hearing Schedule | N | N | 1 |
GAURAV ENTERPRISES Total | 1 | |||||||||
GAYATRI ENTERPRISES | P52000011627 | Konkan | Raigarh | CC006000000100570 | 2019 | Aug | Complete | Y | N | 1 |
GAYATRI ENTERPRISES Total | 1 | |||||||||
Geetai Developers Private Limited | P51800008680 | Konkan | Mumbai Suburban | CC006000000000361 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000572 | 2017 | Sep | Complete | Y | N | 1 | ||||
CC006000000001103 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000001967 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012037 | 2017 | Nov | Complete | Y | N | 1 | ||||
CC006000000012475 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000012483 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000012610 | 2017 | Dec | Complete | Y | N | 1 | ||||
CC006000000012799 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000012805 | 2018 | Jan | Complete | Y | N | 1 | ||||
CC006000000023228 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000023680 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000023697 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000023728 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023967 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000068142 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068149 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068151 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068161 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078282 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000198920 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000209546 | 2021 | Dec | Pending | N | N | 1 | ||||
Geetai Developers Private Limited Total | 22 | |||||||||
Geetaraj Realtors | P51800010293 | Konkan | Mumbai Suburban | CC006000000001058 | 2017 | Oct | Complete | N | N | 1 |
CC006000000194970 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
Geetaraj Realtors Total | 2 | |||||||||
GEOPRENEUR CORP PVT LTD | P51800008439 | Konkan | Mumbai Suburban | CC006000000198545 | 2021 | Oct | Hearing Schedule | N | N | 1 |
GEOPRENEUR CORP PVT LTD Total | 1 | |||||||||
Geopreneur Spire Realty | P51800011901 | Konkan | Mumbai Suburban | CC006000000054698 | 2018 | Jun | Complete | N | N | 1 |
CC006000000209756 | 2022 | Jan | Pending | N | N | 1 | ||||
Geopreneur Spire Realty Total | 2 | |||||||||
GHANSHAM PROPERTIES | P51900014191 | Konkan | Mumbai City | CC006000000056134 | 2018 | Sep | Complete | N | N | 1 |
GHANSHAM PROPERTIES Total | 1 | |||||||||
GIRIRAJ ENTERPRISES | P51800009344 | Konkan | Mumbai Suburban | CC006000000044023 | 2018 | Apr | Complete | N | N | 1 |
GIRIRAJ ENTERPRISES Total | 1 | |||||||||
GITANJALI INFRATECH LIMITED | P51800004498 | Konkan | Mumbai Suburban | CC006000000054940 | 2018 | Jun | Complete | N | N | 1 |
CC006000000054952 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000056350 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000193948 | 2020 | Sep | Pending | N | N | 1 | ||||
GITANJALI INFRATECH LIMITED Total | 4 | |||||||||
GLASSWOOD REALTY PRIVATE LIMITED | P51800006266 | Konkan | Mumbai Suburban | CC006000000141206 | 2019 | Oct | Complete | N | N | 1 |
CC006000000161224 | 2019 | Oct | Complete | N | N | 1 | ||||
GLASSWOOD REALTY PRIVATE LIMITED Total | 2 | |||||||||
Glider Buildcon Realtors | P51900015854 | Konkan | Mumbai City | CC006000000079278 | 2019 | May | Hearing Schedule | N | N | 1 |
CC006000000193400 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193662 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193814 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193972 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198315 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000199144 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
P51900016482 | Konkan | Mumbai City | CC006000000196359 | 2021 | Mar | Hearing Schedule | N | N | 1 | |
CC006000000196476 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
P51900021057 | Konkan | Mumbai City | CC006000000193989 | 2020 | Oct | Hearing Schedule | N | N | 1 | |
CC006000000197737 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
Glider Buildcon Realtors Total | 11 | |||||||||
Glider Buildcon Realtors Private Limited | P51900003324 | Konkan | Mumbai City | CC006000000171890 | 2019 | Dec | Hearing Schedule | N | N | 1 |
CC006000000194792 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195198 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000198423 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198764 | 2021 | Oct | Pending | N | N | 1 | ||||
P51900018039 | Konkan | Mumbai City | CC006000000199073 | 2021 | Nov | Hearing Schedule | N | N | 1 | |
CC006000000209484 | 2022 | Jan | Pending | N | N | 1 | ||||
P51900020330 | Konkan | Mumbai City | CC006000000193444 | 2020 | Jul | Hearing Schedule | N | N | 1 | |
CC006000000196722 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196734 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
Glider Buildcon Realtors Private Limited Total | 10 | |||||||||
Global Developers | P51800010825 | Konkan | Mumbai Suburban | CC006000000195672 | 2021 | Feb | Hearing Schedule | N | N | 1 |
Global Developers Total | 1 | |||||||||
GLOBAL HOUSING VENTURES | P51800009478 | Konkan | Mumbai Suburban | CC006000000056961 | 2018 | Dec | Complete | N | N | 1 |
CC006000000196714 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
GLOBAL HOUSING VENTURES Total | 2 | |||||||||
GLOBAL ORICON DEVELOPERS | P51800003722 | Konkan | Mumbai Suburban | CC006000000100462 | 2019 | Aug | Complete | N | N | 1 |
GLOBAL ORICON DEVELOPERS Total | 1 | |||||||||
Glomore constructions | P51800006404 | Konkan | Mumbai Suburban | CC006000000056785 | 2018 | Oct | Complete | N | N | 1 |
CC006000000089809 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100552 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000193435 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000194207 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194290 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000195142 | 2020 | Dec | Complete | Y | N | 1 | ||||
CC006000000195183 | 2020 | Dec | Complete | Y | N | 1 | ||||
CC006000000195186 | 2020 | Dec | Complete | Y | N | 1 | ||||
CC006000000195187 | 2020 | Dec | Complete | Y | N | 1 | ||||
CC006000000195492 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195504 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000195637 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000195705 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195794 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196543 | 2021 | May | Complete | Y | N | 1 | ||||
CC006000000196546 | 2021 | May | Complete | Y | N | 1 | ||||
CC006000000197815 | 2021 | Jul | Complete | N | N | 1 | ||||
CC006000000198128 | 2021 | Sep | Complete | N | N | 1 | ||||
CC006000000198709 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199141 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209496 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209500 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209508 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
Glomore constructions Total | 24 | |||||||||
Godrej Greenview Housing Private Limited | P51700000120 | Konkan | Thane | CC006000000000067 | 2017 | Sep | Complete | N | N | 1 |
CC006000000057064 | 2019 | Feb | Complete | Y | Y | 1 | ||||
CC006000000090066 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000110836 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000161300 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000194854 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000196908 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000199104 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Godrej Greenview Housing Private Limited Total | 8 | |||||||||
Godrej Landmark Redevelopers Private Limited | P51800001107 | Konkan | Mumbai Suburban | CC006000000043992 | 2018 | Apr | Complete | N | N | 1 |
CC006000000043993 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000054576 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056249 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056998 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000079338 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089654 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000192640 | 2020 | Feb | Pending | N | N | 1 | ||||
CC006000000192676 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000193732 | 2020 | Aug | Pending | N | N | 1 | ||||
CC006000000193869 | 2020 | Aug | Pending | N | N | 1 | ||||
CC006000000193881 | 2020 | Sep | Pending | N | N | 1 | ||||
Godrej Landmark Redevelopers Private Limited Total | 12 | |||||||||
Godrej Macbricks Private Limited | P51700024496 | Konkan | Thane | CC006000000194828 | 2020 | Nov | Complete | N | N | 1 |
CC006000000198712 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
Godrej Macbricks Private Limited Total | 2 | |||||||||
Godrej Projects Development Limited | P51800023915 | Konkan | Mumbai Suburban | CC006000000198261 | 2021 | Sep | Hearing Schedule | N | N | 1 |
Godrej Projects Development Limited Total | 1 | |||||||||
Godrej Properties Limited | P51800000158 | Konkan | Mumbai Suburban | CC006000000193718 | 2020 | Aug | Hearing Schedule | N | N | 1 |
P51800000161 | Konkan | Mumbai Suburban | CC006000000141048 | 2019 | Dec | Complete | N | N | 1 | |
P51800000165 | Konkan | Mumbai Suburban | CC006000000001024 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000151210 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171900 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000198870 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
P51800028364 | Konkan | Mumbai Suburban | CC006000000197011 | 2021 | May | Hearing Schedule | N | N | 1 | |
Godrej Properties Limited Total | 7 | |||||||||
Godrej Redevelopers (Mumbai) Pvt. Ltd. | P51800000519 | Konkan | Mumbai Suburban | CC006000000193227 | 2020 | May | Complete | N | N | 1 |
CC006000000198485 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Godrej Redevelopers (Mumbai) Pvt. Ltd. Total | 2 | |||||||||
GOKA ENGINEERING CO PVT LTD | P52000005331 | Konkan | Raigarh | CC006000000089561 | 2019 | Jun | Complete | N | N | 1 |
GOKA ENGINEERING CO PVT LTD Total | 1 | |||||||||
Gold Field Developers | P52000006764 | Konkan | Raigarh | CC006000000089620 | 2019 | Jun | Complete | N | N | 1 |
Gold Field Developers Total | 1 | |||||||||
Gold Star Builders & Developers Pvt.Ltd. | P51900006038 | Konkan | Mumbai City | CC006000000193629 | 2020 | Aug | Hearing Schedule | N | N | 1 |
Gold Star Builders & Developers Pvt.Ltd. Total | 1 | |||||||||
GOLDCREST BUILDERS & DEVELOPERS | P52000009124 | Konkan | Raigarh | CC006000000057382 | 2019 | Jan | Complete | N | N | 1 |
GOLDCREST BUILDERS & DEVELOPERS Total | 1 | |||||||||
GOLDFIELD ASSOSCIATES | P51700012652 | Konkan | Thane | CC006000000199172 | 2021 | Nov | Hearing Schedule | N | N | 1 |
GOLDFIELD ASSOSCIATES Total | 1 | |||||||||
Goldstar Realtors | P99000006550 | Konkan | Palghar | CC006000000054608 | 2018 | May | Complete | Y | Y | 1 |
CC006000000055255 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055389 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055405 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055574 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000056461 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000057121 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057123 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000078616 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000195867 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196876 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197217 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197251 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197274 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197309 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197376 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197378 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197381 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197387 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197389 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197397 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197430 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197674 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197726 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197807 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000197975 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198205 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198338 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198365 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198406 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198408 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198421 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
P99000008697 | Konkan | Palghar | CC006000000055256 | 2018 | Jul | Complete | N | N | 1 | |
CC006000000055390 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055391 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055398 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055506 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000057593 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057825 | 2019 | Jan | Complete | Y | Y | 1 | ||||
CC006000000079247 | 2019 | May | Complete | Y | Y | 1 | ||||
CC006000000089710 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000197348 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197350 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197351 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197802 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
P99000012256 | Konkan | Palghar | CC006000000055652 | 2018 | Aug | Complete | N | N | 1 | |
CC006000000161375 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000161429 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
Goldstar Realtors Total | 48 | |||||||||
GOODBUILD (INDIA) PRIVATE LIMITED | P51800004539 | Konkan | Mumbai Suburban | CC006000000079440 | 2019 | May | Complete | N | N | 1 |
GOODBUILD (INDIA) PRIVATE LIMITED Total | 1 | |||||||||
Goodtime Real Estate Development Private Limited | P51900000642 | Konkan | Mumbai City | CC006000000001201 | 2017 | Dec | Complete | N | N | 1 |
CC006000000012742 | 2018 | Jan | Complete | N | N | 1 | ||||
Goodtime Real Estate Development Private Limited Total | 2 | |||||||||
Goodwill Properties Pvt Ltd | P51900001665 | Konkan | Mumbai City | CC006000000100252 | 2019 | Jul | Complete | Y | N | 1 |
Goodwill Properties Pvt Ltd Total | 1 | |||||||||
GOVIND MARUTIRAO KAKDE | P51900004392 | Konkan | Mumbai City | CC006000000044132 | 2018 | Apr | Complete | N | N | 1 |
CC006000000055230 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000194521 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194523 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194525 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194526 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194530 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194531 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194532 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194533 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194534 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194537 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194600 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000195118 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000196761 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
GOVIND MARUTIRAO KAKDE Total | 15 | |||||||||
GOVINDA CONSTRUCTION | P99000013034 | Konkan | Palghar | CC006000000012441 | 2017 | Dec | Complete | N | N | 1 |
CC006000000055130 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055247 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000078789 | 2019 | Apr | Complete | N | N | 1 | ||||
GOVINDA CONSTRUCTION Total | 4 | |||||||||
Grace Estate Builders | P51800007498 | Konkan | Mumbai Suburban | CC006000000078992 | 2019 | Apr | Complete | N | N | 1 |
Grace Estate Builders Total | 1 | |||||||||
Grace Estate Development Venture | P51800010438 | Konkan | Mumbai Suburban | CC006000000192349 | 2020 | Feb | Hearing Schedule | N | N | 1 |
Grace Estate Development Venture Total | 1 | |||||||||
GRACE URBAN DEVELOPMENT CORPORATION | P51800012210 | Konkan | Mumbai Suburban | CC006000000078369 | 2019 | Mar | Complete | Y | N | 1 |
GRACE URBAN DEVELOPMENT CORPORATION Total | 1 | |||||||||
GRANDBUILD REALTY LLP | P51700024761 | Konkan | Thane | CC006000000198368 | 2021 | Sep | Pending | N | N | 1 |
GRANDBUILD REALTY LLP Total | 1 | |||||||||
Greenery Rock LLP | P51800001980 | Konkan | Mumbai Suburban | CC006000000012157 | 2017 | Nov | Complete | N | N | 1 |
Greenery Rock LLP Total | 1 | |||||||||
GROW PLUS INFRA | P52000005275 | Konkan | Raigarh | CC006000000090054 | 2019 | Jul | Complete | N | N | 1 |
CC006000000194847 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
GROW PLUS INFRA Total | 2 | |||||||||
GRS SHELTERS PRIVATE LIMITED | P51900008828 | Konkan | Mumbai City | CC006000000000484 | 2017 | Sep | Complete | N | N | 1 |
GRS SHELTERS PRIVATE LIMITED Total | 1 | |||||||||
gupta builders and developers | P51700004806 | Konkan | Thane | CC006000000079320 | 2020 | Dec | Hearing Schedule | N | N | 1 |
CC006000000110927 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000194345 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000196037 | 2021 | Feb | Pending | Y | N | 1 | ||||
CC006000000196293 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196833 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000198973 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
gupta builders and developers Total | 7 | |||||||||
Gupta Housing Pvt Ltd | P51900005034 | Konkan | Mumbai City | CC006000000000959 | 2017 | Sep | Complete | N | N | 1 |
CC006000000001375 | 2017 | Oct | Complete | N | N | 1 | ||||
Gupta Housing Pvt Ltd Total | 2 | |||||||||
GURUASHISH CONSTRUCTION PRIVATE LIMITED | P51800011383 | Konkan | Mumbai Suburban | CC006000000001144 | 2017 | Oct | Complete | N | N | 1 |
CC006000000055533 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000141121 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161296 | 2019 | Oct | Complete | N | N | 1 | ||||
GURUASHISH CONSTRUCTION PRIVATE LIMITED Total | 4 | |||||||||
Gurukrupa Developers | P51800003522 | Konkan | Mumbai Suburban | CC006000000056195 | 2018 | Sep | Complete | N | N | 1 |
CC006000000196178 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000197881 | 2021 | Aug | Complete | N | N | 1 | ||||
Gurukrupa Developers Total | 3 | |||||||||
Gurumauli Developers | P51800007074 | Konkan | Mumbai Suburban | CC006000000078736 | 2019 | Apr | Complete | N | N | 1 |
CC006000000161245 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000192281 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
Gurumauli Developers Total | 3 | |||||||||
H G Properties and Investments Private Limited | P51900011232 | Konkan | Mumbai City | CC006000000044027 | 2018 | Apr | Complete | N | N | 1 |
H G Properties and Investments Private Limited Total | 1 | |||||||||
H RISHABRAJ DEVELOPERS | P51800010479 | Konkan | Mumbai Suburban | CC006000000000615 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000682 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000804 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000023601 | 2018 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000054948 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055836 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056539 | 2018 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000100412 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100413 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100414 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100415 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000161282 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161285 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000171810 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000197465 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197628 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000198655 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199126 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199135 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000209606 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
H RISHABRAJ DEVELOPERS Total | 20 | |||||||||
H.K.PUJARA BUILDERS | P51800004626 | Konkan | Mumbai Suburban | CC006000000194656 | 2020 | Oct | Hearing Schedule | N | N | 1 |
H.K.PUJARA BUILDERS Total | 1 | |||||||||
Hansa Nalin Patel | P52000003436 | Konkan | Raigarh | CC006000000193811 | 2020 | Aug | Hearing Schedule | N | N | 1 |
Hansa Nalin Patel Total | 1 | |||||||||
HANWARE REALTY | P51900019260 | Konkan | Mumbai City | CC006000000171526 | 2019 | Nov | Complete | N | N | 1 |
HANWARE REALTY Total | 1 | |||||||||
HARAKCHAND NENMAL JAIN | P51700005745 | Konkan | Thane | CC006000000196294 | 2021 | Mar | Hearing Schedule | N | N | 1 |
HARAKCHAND NENMAL JAIN Total | 1 | |||||||||
HARASIDDH DEVELOPERS | P51700001284 | Konkan | Thane | CC006000000197551 | 2021 | Jul | Hearing Schedule | N | N | 1 |
HARASIDDH DEVELOPERS Total | 1 | |||||||||
HARE KRISHNA BUILDER | P51900008778 | Konkan | Mumbai City | CC006000000000291 | 2017 | Aug | Complete | N | N | 1 |
CC006000000001484 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000198271 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
HARE KRISHNA BUILDER Total | 3 | |||||||||
HARI OM CONSTRUCTION | P51800010436 | Konkan | Mumbai Suburban | CC006000000194346 | 2020 | Oct | Hearing Schedule | N | N | 1 |
HARI OM CONSTRUCTION Total | 1 | |||||||||
Hari Om Developers | P51800010174 | Konkan | Mumbai Suburban | CC006000000000973 | 2017 | Oct | Complete | N | N | 1 |
CC006000000078308 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000197199 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198113 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198114 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000209370 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
Hari Om Developers Total | 6 | |||||||||
Haridwar Corp | P99000004713 | Konkan | Palghar | CC006000000110905 | 2019 | Sep | Complete | N | N | 1 |
CC006000000199265 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
Haridwar Corp Total | 2 | |||||||||
Harihar Builders & Developers | P99000011912 | Konkan | Palghar | CC006000000195851 | 2021 | Feb | Hearing Schedule | N | N | 1 |
Harihar Builders & Developers Total | 1 | |||||||||
Hariom Sayaji Properties LLP | P51800001550 | Konkan | Mumbai Suburban | CC006000000044056 | 2018 | Apr | Complete | N | N | 1 |
Hariom Sayaji Properties LLP Total | 1 | |||||||||
Haritara Construction Company | P51800004528 | Konkan | Mumbai Suburban | CC006000000110731 | 2019 | Aug | Hearing Schedule | N | N | 1 |
CC006000000192283 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192302 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
Haritara Construction Company Total | 3 | |||||||||
Havi Homes Infrastructure Pvt Ltd | P52900016478 | Konkan | Sindhudurg | CC006000000057297 | 2018 | Dec | Complete | Y | N | 1 |
Havi Homes Infrastructure Pvt Ltd Total | 1 | |||||||||
HAWARE ENGINEERS & BUILDERS PRIVATE LIMITED | P51700003236 | Konkan | Thane | CC006000000000164 | 2017 | Aug | Complete | Y | Y | 1 |
CC006000000054978 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000110699 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000195996 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
HAWARE ENGINEERS & BUILDERS PRIVATE LIMITED Total | 4 | |||||||||
HAWARE ENGINEERS AND BUILDERS PRIVATE LIMITED | P51700001515 | Konkan | Thane | CC006000000044344 | 2018 | Jun | Complete | Y | Y | 1 |
CC006000000078327 | 2019 | Apr | Complete | N | N | 1 | ||||
HAWARE ENGINEERS AND BUILDERS PRIVATE LIMITED Total | 2 | |||||||||
HAWARE FINANCE PVT. LTD. | P51700011404 | Konkan | Thane | CC006000000012612 | 2017 | Dec | Complete | N | N | 1 |
CC006000000078900 | 2019 | Apr | Complete | Y | Y | 1 | ||||
HAWARE FINANCE PVT. LTD. Total | 2 | |||||||||
HBS Seaview Pvt Ltd | P51900009287 | Konkan | Mumbai City | CC006000000078822 | 2019 | Apr | Complete | N | N | 1 |
CC006000000195695 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195788 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
HBS Seaview Pvt Ltd Total | 3 | |||||||||
Heena Builders and Developers | P51800012140 | Konkan | Mumbai Suburban | CC006000000078819 | 2019 | Apr | Complete | N | N | 1 |
Heena Builders and Developers Total | 1 | |||||||||
Heena Lifestyles | P51800001533 | Konkan | Mumbai Suburban | CC006000000197586 | 2021 | Jul | Hearing Schedule | N | N | 1 |
P51800006989 | Konkan | Mumbai Suburban | CC006000000078661 | 2019 | May | Complete | Y | N | 1 | |
CC006000000078828 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079342 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079345 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089842 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000196940 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
Heena Lifestyles Total | 7 | |||||||||
HEER REALTY VENTURES PVT LTD | P51700003912 | Konkan | Thane | CC006000000151214 | 2019 | Oct | Complete | N | N | 1 |
HEER REALTY VENTURES PVT LTD Total | 1 | |||||||||
Hema Shantilal Bhagat | P51900030681 | Konkan | Mumbai City | CC006000000198455 | 2021 | Sep | Hearing Schedule | N | N | 1 |
Hema Shantilal Bhagat Total | 1 | |||||||||
HEMANT BHANUSHANKAR VYAS | P51900012122 | Konkan | Mumbai City | CC006000000001367 | 2017 | Oct | Complete | Y | Y | 1 |
CC006000000001371 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001386 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001977 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000023530 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044437 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055704 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000057296 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078314 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000089929 | 2019 | Jul | Complete | N | N | 1 | ||||
HEMANT BHANUSHANKAR VYAS Total | 10 | |||||||||
Hemant S Jain | P51700013858 | Konkan | Thane | CC006000000161378 | 2021 | Feb | Hearing Schedule | N | N | 1 |
CC006000000192600 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
P51700013859 | Konkan | Thane | CC006000000194203 | 2020 | Sep | Pending | N | N | 1 | |
Hemant S Jain Total | 3 | |||||||||
Hemant Vinaykant Parikh | P51800012841 | Konkan | Mumbai Suburban | CC006000000023126 | 2018 | Jan | Complete | Y | N | 1 |
CC006000000056949 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000197732 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
Hemant Vinaykant Parikh Total | 3 | |||||||||
Heritage Lifestyles & Developers Pvt. Ltd.e | P51800001655 | Konkan | Mumbai Suburban | CC006000000193630 | 2020 | Aug | Complete | N | N | 1 |
Heritage Lifestyles & Developers Pvt. Ltd.e Total | 1 | |||||||||
Hetali Enterprises | P51800000826 | Konkan | Mumbai Suburban | CC006000000197390 | 2021 | Jun | Hearing Schedule | N | N | 1 |
Hetali Enterprises Total | 1 | |||||||||
HGP Community Pvt. Ltd. | P51800000143 | Konkan | Mumbai Suburban | CC006000000195344 | 2020 | Dec | Hearing Schedule | N | N | 1 |
CC006000000195345 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
P51800000154 | Konkan | Mumbai Suburban | CC006000000078227 | 2019 | Feb | Complete | N | N | 1 | |
CC006000000194898 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194902 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194904 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
P51800000405 | Konkan | Mumbai Suburban | CC006000000193403 | 2020 | Jul | Complete | N | N | 1 | |
CC006000000193406 | 2020 | Jul | Complete | N | N | 1 | ||||
HGP Community Pvt. Ltd. Total | 8 | |||||||||
Hi Rock Construction Pvt Ltd | P51900004158 | Konkan | Mumbai City | CC006000000196799 | 2021 | Apr | Hearing Schedule | N | N | 1 |
CC006000000196802 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
Hi Rock Construction Pvt Ltd Total | 2 | |||||||||
Hillcrest Joint Venture | P51800002556 | Konkan | Mumbai Suburban | CC006000000056483 | 2018 | Oct | Complete | N | N | 1 |
CC006000000057119 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078973 | 2019 | Apr | Complete | N | N | 1 | ||||
Hillcrest Joint Venture Total | 3 | |||||||||
HILTON INFRASTRUCTURE | P51900009939 | Konkan | Mumbai City | CC006000000198417 | 2021 | Nov | Pending | N | N | 1 |
CC006000000198418 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198528 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198532 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198534 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198535 | 2021 | Nov | Pending | N | N | 1 | ||||
HILTON INFRASTRUCTURE Total | 6 | |||||||||
HINDUSTAN BUILDER | P51800013658 | Konkan | Mumbai Suburban | CC006000000022858 | 2018 | Feb | Complete | N | N | 1 |
CC006000000110910 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000196832 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196838 | 2021 | Apr | Complete | N | N | 1 | ||||
HINDUSTAN BUILDER Total | 4 | |||||||||
HINDUSTAN CONSTRUCTION CORPORATION | P51800013187 | Konkan | Thane | CC006000000171642 | 2019 | Dec | Complete | N | N | 1 |
HINDUSTAN CONSTRUCTION CORPORATION Total | 1 | |||||||||
HIRAL HOMES | P51800008326 | Konkan | Mumbai Suburban | CC006000000078169 | 2019 | Feb | Complete | Y | N | 1 |
CC006000000078306 | 2019 | Feb | Complete | Y | N | 1 | ||||
HIRAL HOMES Total | 2 | |||||||||
HIRANIMANTHAN BUILDERS AND DEVELOPERS | P51800003741 | Konkan | Mumbai Suburban | CC006000000196738 | 2021 | Apr | Hearing Schedule | N | N | 1 |
P51800008227 | Konkan | Mumbai Suburban | CC006000000198573 | 2021 | Oct | Hearing Schedule | N | N | 1 | |
HIRANIMANTHAN BUILDERS AND DEVELOPERS Total | 2 | |||||||||
HITECH HAFIZI TOWN DEVELOPERS | P51800015510 | Konkan | Mumbai Suburban | CC006000000141192 | 2019 | Oct | Complete | Y | N | 1 |
CC006000000196855 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
HITECH HAFIZI TOWN DEVELOPERS Total | 2 | |||||||||
hitesh parmanand asrani | P51700013182 | Konkan | Thane | CC006000000182109 | 2020 | Jan | Complete | Y | N | 1 |
hitesh parmanand asrani Total | 1 | |||||||||
HOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED | P51800029444 | Konkan | Mumbai Suburban | CC006000000198369 | 2021 | Sep | Hearing Schedule | N | N | 1 |
CC006000000198495 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198681 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
HOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED Total | 3 | |||||||||
HONEST SHELTERS PRIVATE LTD | P51900006786 | Konkan | Mumbai City | CC006000000001602 | 2017 | Oct | Complete | Y | N | 1 |
HONEST SHELTERS PRIVATE LTD Total | 1 | |||||||||
HOOR CONSTRUCTIONS | P51900009360 | Konkan | Mumbai City | CC006000000056062 | 2018 | Sep | Complete | N | N | 1 |
HOOR CONSTRUCTIONS Total | 1 | |||||||||
HORIZON DREAM HOMES PRIVATE LIMITED | P51800004409 | Konkan | Mumbai Suburban | CC006000000012252 | 2017 | Dec | Complete | Y | N | 1 |
P51800010972 | Konkan | Mumbai Suburban | CC006000000023166 | 2018 | Feb | Complete | Y | N | 1 | |
CC006000000192855 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
HORIZON DREAM HOMES PRIVATE LIMITED Total | 3 | |||||||||
HORIZON PROJECTS PVT LTD | P51700000528 | Konkan | Thane | CC006000000000031 | 2017 | Jul | Complete | Y | N | 1 |
CC006000000000608 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000671 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000012452 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000023627 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000055551 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000193651 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000193653 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193657 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193768 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000193817 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193842 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193843 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193844 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193908 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193915 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193918 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193920 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193922 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000194237 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194240 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194245 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194278 | 2020 | Oct | Pending | N | N | 1 | ||||
P51700005477 | Konkan | Thane | CC006000000001278 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000055839 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000056064 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000110723 | 2019 | Sep | Complete | N | N | 1 | ||||
2020 | Feb | Complete | N | N | 1 | |||||
CC006000000192776 | 2020 | Jun | Complete | N | N | 1 | ||||
P51700008440 | Konkan | Thane | CC006000000001751 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000001767 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000012162 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012640 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000012808 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000022951 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000022954 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000022962 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023073 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023080 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023089 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023117 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000044140 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044368 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054832 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000056555 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056606 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000171921 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000181975 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000182076 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000193910 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193912 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193913 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000193914 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000194242 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194246 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194247 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194280 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194331 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194958 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000197577 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000198200 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198223 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198224 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198226 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198227 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198228 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198277 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000209824 | 2022 | Jan | Pending | N | N | 1 | ||||
P51700009168 | Konkan | Thane | CC006000000001512 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000012418 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000193917 | 2020 | Sep | Pending | N | N | 1 | ||||
P51700019085 | Konkan | Thane | CC006000000194261 | 2020 | Oct | Complete | N | N | 1 | |
CC006000000195091 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195860 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
HORIZON PROJECTS PVT LTD Total | 74 | |||||||||
HORIZON REALTY | P51900009490 | Konkan | Mumbai City | CC006000000012294 | 2017 | Dec | Complete | N | N | 1 |
HORIZON REALTY Total | 1 | |||||||||
HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD | P51800004431 | Konkan | Mumbai Suburban | CC006000000001925 | 2017 | Nov | Complete | N | N | 1 |
CC006000000044320 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000055159 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000056715 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000057653 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078776 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000078855 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079053 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079138 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000141004 | 2019 | Oct | Complete | N | N | 1 | ||||
P51800007283 | Konkan | Mumbai Suburban | CC006000000001716 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000012325 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000023201 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023727 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000043978 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000054568 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054665 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055018 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055021 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055026 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055028 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055029 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055031 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055032 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055033 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055037 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055038 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055039 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055040 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055041 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055043 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055044 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055045 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055046 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055047 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055050 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055052 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055053 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055055 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055056 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055057 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055058 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055067 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055070 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055071 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000055082 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000055083 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055084 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055085 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055162 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055171 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055289 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055359 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055421 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055477 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055903 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055927 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055928 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055929 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055931 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055933 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055949 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055966 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055990 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056112 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056143 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056211 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056212 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056231 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056263 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056533 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056571 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056573 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056731 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056925 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057555 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000058032 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058048 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078434 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078637 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078756 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078757 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078981 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000078985 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000078986 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079031 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079070 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079080 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079082 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079083 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079126 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079130 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079225 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079227 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079287 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079294 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079321 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079339 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079385 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079415 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079449 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079451 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089539 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089627 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089636 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089641 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089667 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089674 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089727 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089728 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089740 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089818 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089877 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089923 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089946 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089974 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090047 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090161 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100216 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100290 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100320 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100322 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100325 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100344 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100359 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110632 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110646 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110684 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110689 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110725 | 2019 | Aug | Complete | N | N | 1 | ||||
P51800007809 | Konkan | Mumbai Suburban | CC006000000000192 | 2018 | Aug | Complete | N | N | 1 | |
CC006000000000483 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000023586 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023843 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000044555 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055794 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055915 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056269 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056289 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056693 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000057294 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057417 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057865 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057919 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057936 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057952 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057955 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057962 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057973 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057999 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058000 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058001 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058008 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058009 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058012 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058037 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000058058 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058104 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058130 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058138 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068146 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068147 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078190 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078231 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078267 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078305 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078335 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078816 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078831 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078843 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078857 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078858 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079051 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079093 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000100391 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110644 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000141128 | 2019 | Oct | Complete | N | N | 1 | ||||
P51800007814 | Konkan | Mumbai Suburban | CC006000000057237 | 2019 | Feb | Complete | N | N | 1 | |
P51800009742 | Konkan | Mumbai Suburban | CC006000000000945 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000023933 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000057257 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057930 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058006 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058118 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068153 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078597 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078862 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079052 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089630 | 2019 | Jun | Complete | Y | N | 1 | ||||
P51800010758 | Konkan | Mumbai Suburban | CC006000000001570 | 2018 | Jul | Complete | N | N | 1 | |
CC006000000054859 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000054862 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000054863 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000054865 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000054988 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056977 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057998 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078891 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089749 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089750 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089752 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089753 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089755 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089756 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089757 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089758 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089910 | 2019 | Aug | Complete | N | N | 1 | ||||
P51800012577 | Konkan | Mumbai Suburban | CC006000000012420 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000057617 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000058129 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078674 | 2019 | Mar | Complete | N | N | 1 | ||||
P51800016598 | Konkan | Mumbai Suburban | CC006000000054831 | 2018 | Jun | Complete | Y | Y | 1 | |
CC006000000056981 | 2018 | Nov | Complete | Y | N | 1 | ||||
P99000012466 | Konkan | Palghar | CC006000000055112 | 2018 | Jun | Complete | N | N | 1 | |
CC006000000078867 | 2019 | Apr | Complete | N | N | 1 | ||||
P99000012536 | Konkan | Palghar | CC006000000012224 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000054971 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000057198 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057626 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057628 | 2019 | Jan | Complete | N | N | 1 | ||||
P99000012539 | Konkan | Palghar | CC006000000001492 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000001827 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000023620 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000056015 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000056125 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000056946 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057538 | 2019 | Jan | Complete | Y | N | 1 | ||||
CC006000000078312 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078577 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078633 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000161228 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161265 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000197786 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197885 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
P99000012576 | Konkan | Palghar | CC006000000054640 | 2018 | May | Complete | N | N | 1 | |
CC006000000054643 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056113 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056139 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000056451 | 2018 | Oct | Complete | Y | N | 1 | ||||
CC006000000057835 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078860 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000110742 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000161319 | 2019 | Oct | Complete | N | N | 1 | ||||
P99000012642 | Konkan | Palghar | CC006000000012696 | 2018 | Jul | Complete | Y | N | 1 | |
CC006000000044347 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055303 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055494 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055554 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055734 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000057454 | 2019 | Jan | Complete | Y | N | 1 | ||||
CC006000000057942 | 2019 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000078304 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078504 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078602 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078777 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000078882 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000100246 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100421 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000161311 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161367 | 2019 | Oct | Complete | N | N | 1 | ||||
P99000012735 | Konkan | Palghar | CC006000000001385 | 2018 | Jul | Complete | Y | N | 1 | |
CC006000000001534 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001947 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000012672 | 2018 | Jan | Complete | Y | N | 1 | ||||
CC006000000023597 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000044296 | 2018 | Apr | Complete | Y | N | 1 | ||||
CC006000000044304 | 2018 | Apr | Complete | Y | N | 1 | ||||
CC006000000044390 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000044523 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000044543 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055838 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000057484 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000078615 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000079144 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000100509 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100559 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000110688 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000182064 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000197976 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD Total | 279 | |||||||||
Hubtown Limited | P51700000369 | Konkan | Thane | CC006000000001854 | 2017 | Nov | Complete | N | N | 1 |
CC006000000171668 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
P51700000602 | Konkan | Thane | CC006000000023018 | 2018 | Jan | Complete | Y | N | 1 | |
CC006000000192367 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000193928 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
P51800001202 | Konkan | Mumbai Suburban | CC006000000023060 | 2018 | Jan | Complete | N | N | 1 | |
CC006000000023562 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023766 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000055636 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055638 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055682 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000198299 | 2021 | Sep | Pending | N | N | 1 | ||||
P51800001465 | Konkan | Mumbai Suburban | CC006000000192315 | 2020 | Jan | Hearing Schedule | N | N | 1 | |
P51800002671 | Konkan | Mumbai Suburban | CC006000000196649 | 2021 | Apr | Pending | N | N | 1 | |
P51800005224 | Konkan | Mumbai Suburban | CC006000000193708 | 2020 | Aug | Pending | N | N | 1 | |
Hubtown Limited Total | 15 | |||||||||
HUGES REAL ESTATES DEVELOPERS LLP | P51800009485 | Konkan | Mumbai Suburban | CC006000000023510 | 2018 | Mar | Complete | N | N | 1 |
CC006000000194641 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000195655 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000196616 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197699 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
HUGES REAL ESTATES DEVELOPERS LLP Total | 5 | |||||||||
ICON DEVELOPERS | P51800012300 | Konkan | Mumbai Suburban | CC006000000194355 | 2020 | Oct | Hearing Schedule | N | N | 1 |
ICON DEVELOPERS Total | 1 | |||||||||
Ideal Developers | P51700008383 | Konkan | Thane | CC006000000089821 | 2019 | Jun | Complete | N | N | 1 |
Ideal Developers Total | 1 | |||||||||
Immaculate Developers | P52000009051 | Konkan | Raigarh | CC006000000197893 | 2021 | Aug | Hearing Schedule | N | N | 1 |
P52000009816 | Konkan | Raigarh | CC006000000023379 | 2018 | Feb | Complete | N | N | 1 | |
Immaculate Developers Total | 2 | |||||||||
IMPERIUM BUILDCON LLP | P99000008596 | Konkan | Palghar | CC006000000023157 | 2018 | Feb | Complete | N | N | 1 |
CC006000000023890 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000023891 | 2018 | Apr | Complete | Y | N | 1 | ||||
CC006000000044421 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000194074 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000196086 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
IMPERIUM BUILDCON LLP Total | 6 | |||||||||
Imtiaz Saigara and Ahmedi Delawala | P51900007731 | Konkan | Mumbai City | CC006000000054603 | 2018 | May | Complete | Y | Y | 1 |
Imtiaz Saigara and Ahmedi Delawala Total | 1 | |||||||||
Incline Realty Private Limited | P51800003582 | Konkan | Mumbai Suburban | CC006000000000179 | 2017 | Aug | Complete | N | N | 1 |
CC006000000023534 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000089995 | 2019 | Jul | Complete | N | N | 1 | ||||
Incline Realty Private Limited Total | 3 | |||||||||
Indiabulls Infraestate Limited | P51900000469 | Konkan | Mumbai City | CC006000000056266 | 2018 | Sep | Complete | N | N | 1 |
CC006000000193008 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193010 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193011 | 2020 | Mar | Complete | N | N | 1 | ||||
P51900000473 | Konkan | Mumbai City | CC006000000100523 | 2019 | Aug | Complete | N | N | 1 | |
CC006000000100525 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000171910 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000194436 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195798 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195801 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195802 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
P51900000843 | Konkan | Mumbai City | CC006000000194676 | 2020 | Oct | Pending | N | N | 1 | |
CC006000000198236 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
P51900000871 | Konkan | Mumbai City | CC006000000194678 | 2020 | Oct | Hearing Schedule | N | N | 1 | |
CC006000000195684 | 2021 | Jan | Pending | N | N | 1 | ||||
Indiabulls Infraestate Limited Total | 15 | |||||||||
Indiabulls Properties Private Limited | P51900000467 | Konkan | Mumbai City | CC006000000023024 | 2018 | Feb | Hearing Schedule | N | N | 1 |
CC006000000089765 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100514 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000171638 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000192736 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000194389 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194632 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194664 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195076 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195158 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196265 | 2021 | Mar | Pending | N | N | 1 | ||||
CC006000000196426 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196473 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196672 | 2021 | Apr | Pending | N | N | 1 | ||||
P51900000616 | Konkan | Mumbai City | CC006000000012562 | 2018 | Jan | Complete | N | N | 1 | |
CC006000000023072 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023363 | 2018 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000056124 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056167 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000089570 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100465 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110695 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110704 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110705 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110840 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000110874 | 2019 | Sep | Pending | N | N | 1 | ||||
CC006000000161347 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000192490 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000194652 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000195052 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000197022 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197352 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198983 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199002 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Indiabulls Properties Private Limited Total | 34 | |||||||||
Infina Ashapura Homes LLP | P51800007427 | Konkan | Mumbai Suburban | CC006000000054631 | 2018 | Jun | Complete | N | N | 1 |
CC006000000089960 | 2019 | Jul | Complete | N | N | 1 | ||||
Infina Ashapura Homes LLP Total | 2 | |||||||||
INNERSPACE | P51800007470 | Konkan | Mumbai Suburban | CC006000000056740 | 2018 | Nov | Complete | Y | Y | 1 |
CC006000000089683 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100327 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
INNERSPACE Total | 3 | |||||||||
Integrated Spaces Limited | P51800004521 | Konkan | Mumbai Suburban | CC006000000197800 | 2021 | Jul | Hearing Schedule | N | N | 1 |
Integrated Spaces Limited Total | 1 | |||||||||
IPSIT ENTERPRISE | P99000002933 | Konkan | Palghar | CC006000000023125 | 2018 | Feb | Complete | N | N | 1 |
P99000011851 | Konkan | Palghar | CC006000000055719 | 2018 | Sep | Complete | Y | Y | 1 | |
IPSIT ENTERPRISE Total | 2 | |||||||||
IRENE EDWYN DMELLO | P51800013457 | Konkan | Mumbai Suburban | CC006000000001616 | 2017 | Oct | Complete | N | N | 1 |
CC006000000090048 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000171690 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171764 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000182085 | 2020 | Jan | Hearing Schedule | Y | N | 1 | ||||
CC006000000182090 | 2020 | Jan | Hearing Schedule | Y | N | 1 | ||||
CC006000000193738 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193761 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193762 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193763 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198829 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
IRENE EDWYN DMELLO Total | 11 | |||||||||
ISHAAN DEVELOPERS | P51700003810 | Konkan | Thane | CC006000000192421 | 2020 | Feb | Complete | N | N | 1 |
ISHAAN DEVELOPERS Total | 1 | |||||||||
ISPAT CORPORATION | P51800012754 | Konkan | Mumbai Suburban | CC006000000197600 | 2021 | Jul | Pending | N | N | 1 |
ISPAT CORPORATION Total | 1 | |||||||||
ITMC Developers Pvt. Ltd. | P51800006372 | Konkan | Mumbai Suburban | CC006000000000525 | 2017 | Oct | Complete | Y | Y | 1 |
CC006000000000599 | 2017 | Sep | Complete | Y | N | 1 | ||||
CC006000000001106 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001140 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001155 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001403 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001413 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001435 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001478 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001678 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012211 | 2017 | Dec | Complete | Y | N | 1 | ||||
CC006000000054796 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000192515 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192965 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196490 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196544 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196667 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197277 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197677 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000198231 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000209517 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209519 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
ITMC Developers Pvt. Ltd. Total | 22 | |||||||||
ITNOA CONSTRUCTION PRIVATE LIMITED | P51700006631 | Konkan | Thane | CC006000000198993 | 2021 | Nov | Hearing Schedule | N | N | 1 |
ITNOA CONSTRUCTION PRIVATE LIMITED Total | 1 | |||||||||
J V REALTY AND DEVELOPERS | P51800008691 | Konkan | Mumbai Suburban | CC006000000000949 | 2017 | Sep | Complete | N | N | 1 |
J V REALTY AND DEVELOPERS Total | 1 | |||||||||
J.P. PORWAL REALTY | P51900012757 | Konkan | Mumbai City | CC006000000171894 | 2019 | Dec | Complete | N | N | 1 |
CC006000000209509 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
J.P. PORWAL REALTY Total | 2 | |||||||||
JAGDISH SHIWANAND WAGH (HUF) | P51700014240 | Konkan | Thane | CC006000000023924 | 2018 | Mar | Complete | N | N | 1 |
CC006000000055803 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000110929 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000171602 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000171848 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
JAGDISH SHIWANAND WAGH (HUF) Total | 5 | |||||||||
Jaliyan Developer | P51800012925 | Konkan | Mumbai Suburban | CC006000000192506 | 2020 | Feb | Complete | N | N | 1 |
Jaliyan Developer Total | 1 | |||||||||
JANAK S DOSHI | P51900011656 | Konkan | Mumbai City | CC006000000198218 | 2021 | Sep | Hearing Schedule | N | N | 1 |
JANAK S DOSHI Total | 1 | |||||||||
Jangid Contructions | P51700004127 | Konkan | Thane | CC006000000000185 | 2017 | Aug | Complete | N | N | 1 |
CC006000000000466 | 2017 | Sep | Complete | Y | N | 1 | ||||
CC006000000001795 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000001885 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000044262 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000078813 | 2019 | May | Complete | Y | Y | 1 | ||||
CC006000000078814 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000089787 | 2019 | Jun | Complete | Y | Y | 1 | ||||
CC006000000100418 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100493 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100582 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000194937 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000198491 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
P51700004749 | Konkan | Thane | CC006000000001171 | 2017 | Nov | Complete | Y | N | 1 | |
Jangid Contructions Total | 14 | |||||||||
Jangid Developers | P51700012357 | Konkan | Thane | CC006000000012736 | 2018 | May | Complete | Y | N | 1 |
CC006000000023892 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000057956 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000192930 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193075 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000193986 | 2020 | Sep | Complete | N | N | 1 | ||||
Jangid Developers Total | 6 | |||||||||
Jangid Home pvt Ltd | P51800008642 | Konkan | Mumbai Suburban | CC006000000054954 | 2018 | Jun | Complete | N | N | 1 |
Jangid Home pvt Ltd Total | 1 | |||||||||
Jangid Properties | P51700007248 | Konkan | Thane | CC006000000056141 | 2018 | Oct | Complete | N | N | 1 |
CC006000000078788 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089521 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000141131 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000161254 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000171502 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171943 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000182043 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000192117 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000192129 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000192363 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192364 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000193468 | 2020 | Jul | Complete | Y | N | 1 | ||||
CC006000000194144 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194626 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194653 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195026 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000196304 | 2021 | Mar | Complete | Y | N | 1 | ||||
CC006000000196639 | 2021 | Apr | Pending | N | N | 1 | ||||
CC006000000198730 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199001 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Jangid Properties Total | 21 | |||||||||
JANKI DEVELOPERS | P52000028412 | Konkan | Raigarh | CC006000000197923 | 2021 | Aug | Hearing Schedule | N | N | 1 |
JANKI DEVELOPERS Total | 1 | |||||||||
JANZEB AMIRKAMAL KHAN | P51900007426 | Konkan | Mumbai City | CC006000000181971 | 2019 | Dec | Complete | N | N | 1 |
JANZEB AMIRKAMAL KHAN Total | 1 | |||||||||
Jasmina Constructions Pvt. Ltd. | P51800005876 | Konkan | Mumbai Suburban | CC006000000197093 | 2021 | May | Hearing Schedule | N | N | 1 |
CC006000000197095 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
Jasmina Constructions Pvt. Ltd. Total | 2 | |||||||||
JASMINE REALTY | P51700007828 | Konkan | Thane | CC006000000089978 | 2019 | Jul | Complete | N | N | 1 |
JASMINE REALTY Total | 1 | |||||||||
JASPAL SINGH SURI | P51800014152 | Konkan | Mumbai Suburban | CC006000000078507 | 2019 | Mar | Complete | N | N | 1 |
CC006000000079229 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000100384 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100386 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000197033 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197034 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
JASPAL SINGH SURI Total | 6 | |||||||||
Jay Construction India | P51800008046 | Konkan | Mumbai Suburban | CC006000000194148 | 2020 | Sep | Hearing Schedule | N | N | 1 |
CC006000000198921 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Jay Construction India Total | 2 | |||||||||
JAY JINENDRA REALTORS PRIVATE LIMITED | P99000007600 | Konkan | Palghar | CC006000000079513 | 2019 | May | Complete | N | N | 1 |
JAY JINENDRA REALTORS PRIVATE LIMITED Total | 1 | |||||||||
Jay Vee Construction | P51800009021 | Konkan | Mumbai Suburban | CC006000000056235 | 2018 | Sep | Complete | Y | N | 1 |
CC006000000078180 | 2019 | Feb | Complete | Y | N | 1 | ||||
Jay Vee Construction Total | 2 | |||||||||
Jayant Shashikant Parikh | P51700006609 | Konkan | Thane | CC006000000100328 | 2019 | Nov | Complete | Y | N | 1 |
CC006000000192484 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000192485 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
Jayant Shashikant Parikh Total | 3 | |||||||||
JAYANT SONI | P51800005022 | Konkan | Mumbai Suburban | CC006000000023529 | 2018 | May | Complete | N | N | 1 |
CC006000000141085 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000196850 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000198877 | 2021 | Nov | Pending | N | N | 1 | ||||
JAYANT SONI Total | 4 | |||||||||
JAYESH BUILDCON | P51700005257 | Konkan | Thane | CC006000000192993 | 2020 | Mar | Complete | N | N | 1 |
CC006000000195067 | 2020 | Nov | Complete | N | N | 1 | ||||
JAYESH BUILDCON Total | 2 | |||||||||
JAYESH PRAMODBHAI THAKKAR | P51700025554 | Konkan | Thane | CC006000000193481 | 2020 | Jul | Hearing Schedule | N | N | 1 |
JAYESH PRAMODBHAI THAKKAR Total | 1 | |||||||||
Jaykali Developers Private Limited | P51700019865 | Konkan | Thane | CC006000000196154 | 2021 | Feb | Complete | N | N | 1 |
Jaykali Developers Private Limited Total | 1 | |||||||||
JE AND VEE INFRASTRUCTURE | P51800020431 | Konkan | Mumbai Suburban | CC006000000209463 | 2021 | Dec | Pending | N | N | 1 |
JE AND VEE INFRASTRUCTURE Total | 1 | |||||||||
JEEVANDEEP DEVELOPERS | P51800014999 | Konkan | Mumbai Suburban | CC006000000079101 | 2019 | May | Complete | N | N | 1 |
CC006000000079270 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000196276 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196423 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000196510 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000197195 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
JEEVANDEEP DEVELOPERS Total | 6 | |||||||||
JIGNESH OMPRAKASH VYAS | P99000016388 | Konkan | Palghar | CC006000000198076 | 2021 | Oct | Hearing Schedule | N | N | 1 |
CC006000000198546 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
JIGNESH OMPRAKASH VYAS Total | 2 | |||||||||
JINAM K2 REALTORS | P51800005864 | Konkan | Mumbai Suburban | CC006000000195873 | 2021 | Feb | Hearing Schedule | N | N | 1 |
JINAM K2 REALTORS Total | 1 | |||||||||
Jitendra Shankerlal Brahmbhatt | P51800003330 | Konkan | Mumbai Suburban | CC006000000078818 | 2019 | Apr | Complete | N | N | 1 |
P51800003375 | Konkan | Mumbai Suburban | CC006000000171622 | 2019 | Nov | Complete | N | N | 1 | |
CC006000000192705 | 2020 | Feb | Pending | N | N | 1 | ||||
CC006000000194746 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000195041 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195268 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000197079 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197080 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197081 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000198121 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198659 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198787 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199122 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199137 | 2021 | Dec | Pending | N | N | 1 | ||||
P51800003502 | Konkan | Mumbai Suburban | CC006000000001577 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000044469 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056344 | 2018 | Sep | Complete | N | N | 1 | ||||
Jitendra Shankerlal Brahmbhatt Total | 17 | |||||||||
JM DEVELOPERS | P52000006354 | Konkan | Raigarh | CC006000000192292 | 2020 | Jan | Hearing Schedule | N | N | 1 |
JM DEVELOPERS Total | 1 | |||||||||
JMS REALTY | P51800009537 | Konkan | Mumbai Suburban | CC006000000171547 | 2019 | Nov | Complete | N | N | 1 |
JMS REALTY Total | 1 | |||||||||
JOHAAN REALTORS AND DEVELOPERS PRIVATE LIMITED | P51900021100 | Konkan | Mumbai City | CC006000000161447 | 2019 | Nov | Complete | N | N | 1 |
JOHAAN REALTORS AND DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
JOHN DENNIS CONSTRUCTIONS PVT. LTD. | P51800022435 | Konkan | Mumbai Suburban | CC006000000209639 | 2022 | Jan | Pending | N | N | 1 |
JOHN DENNIS CONSTRUCTIONS PVT. LTD. Total | 1 | |||||||||
JOSHI ENTERPRISES | P51700013473 | Konkan | Thane | CC006000000078451 | 2019 | Mar | Complete | N | N | 1 |
CC006000000192373 | 2020 | Jan | Complete | Y | Y | 1 | ||||
CC006000000194311 | 2020 | Oct | Complete | N | N | 1 | ||||
JOSHI ENTERPRISES Total | 3 | |||||||||
JOY AND SAYLA REALTORS | P51800012448 | Konkan | Mumbai Suburban | CC006000000171913 | 2019 | Dec | Complete | N | N | 1 |
JOY AND SAYLA REALTORS Total | 1 | |||||||||
Joynest Premises Private Limited | P51800002350 | Konkan | Mumbai Suburban | CC006000000012210 | 2017 | Nov | Complete | N | N | 1 |
P51800002373 | Konkan | Mumbai Suburban | CC006000000055495 | 2018 | Jul | Complete | N | N | 1 | |
CC006000000055685 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000196920 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197603 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
Joynest Premises Private Limited Total | 5 | |||||||||
Joyville Shapoorji Housing Private Limited | P51900000444 | Konkan | Palghar | CC006000000078413 | 2019 | Apr | Complete | N | N | 1 |
Joyville Shapoorji Housing Private Limited Total | 1 | |||||||||
JP Infra (Mumbai) Pvt. Ltd. | P51700008667 | Konkan | Thane | CC006000000000343 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001545 | 2017 | Oct | Complete | N | N | 1 | ||||
P51800001488 | Konkan | Mumbai Suburban | CC006000000012236 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000023962 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044425 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055486 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056678 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056681 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056687 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056688 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056872 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000056873 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000056874 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000056875 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057929 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000110735 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000171911 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192338 | 2020 | Feb | Complete | N | N | 1 | ||||
JP Infra (Mumbai) Pvt. Ltd. Total | 18 | |||||||||
JP Infra Realty Private Limited | P51700004117 | Konkan | Thane | CC006000000012511 | 2017 | Dec | Complete | N | N | 1 |
CC006000000209570 | 2021 | Dec | Pending | N | N | 1 | ||||
P51700008916 | Konkan | Thane | CC006000000194292 | 2020 | Oct | Hearing Schedule | N | N | 1 | |
P51700016290 | Konkan | Thane | CC006000000171779 | 2019 | Dec | Complete | N | N | 1 | |
P51700019613 | Konkan | Thane | CC006000000182004 | 2020 | Jan | Complete | N | N | 1 | |
P51700023940 | Konkan | Thane | CC006000000198642 | 2021 | Nov | Hearing Schedule | N | N | 1 | |
JP Infra Realty Private Limited Total | 6 | |||||||||
JSB Buildcon LLP | P99000005051 | Konkan | Palghar | CC006000000023278 | 2018 | Feb | Complete | N | N | 1 |
P99000008753 | Konkan | Palghar | CC006000000001356 | 2017 | Oct | Complete | N | N | 1 | |
JSB Buildcon LLP Total | 2 | |||||||||
JSB Dream Homes Private Limited | P99000006041 | Konkan | Palghar | CC006000000055585 | 2018 | Aug | Complete | N | N | 1 |
JSB Dream Homes Private Limited Total | 1 | |||||||||
JSB HOMES LLP | P99000017763 | Konkan | Palghar | CC006000000161410 | 2019 | Nov | Complete | N | N | 1 |
JSB HOMES LLP Total | 1 | |||||||||
JUPITER LANDSCAPES PVT. LTD. | P51700007431 | Konkan | Thane | CC006000000110829 | 2019 | Sep | Hearing Schedule | N | N | 1 |
CC006000000194823 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195691 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195694 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
JUPITER LANDSCAPES PVT. LTD. Total | 4 | |||||||||
JVPD Properties Private Limited | P51800011181 | Konkan | Mumbai Suburban | CC006000000000367 | 2017 | Oct | Complete | N | N | 1 |
CC006000000000381 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000505 | 2017 | Sep | Complete | Y | N | 1 | ||||
CC006000000000712 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000000737 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000776 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000794 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000936 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000000969 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000994 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000001312 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001348 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001358 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001440 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001460 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001502 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001504 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001505 | 2017 | Oct | Complete | Y | N | 1 | ||||