Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
Kanchan Infra | P52200001316 | Nashik | Ahmednagar | CC001000000000115 | 2019 | Sep | Hearing Schedule | N | N | 1 |
Kanchan Infra Total | 1 | |||||||||
Marc Developers | P52200000247 | Nashik | Ahmednagar | CC001000000010136 | 2020 | Feb | Complete | N | N | 1 |
Marc Developers Total | 1 | |||||||||
SAIBHOOMI LAND INFRASTRUCTURE | P52200012033 | Nashik | Ahmednagar | CC001000000020201 | 2021 | Sep | Hearing Schedule | N | N | 1 |
SAIBHOOMI LAND INFRASTRUCTURE Total | 1 | |||||||||
Shree Guruanandji Builders and DevelopersG | P52200006802 | Nashik | Ahmednagar | CC001000000010131 | 2020 | Jan | Hearing Schedule | N | N | 1 |
CC001000000010132 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC001000000010134 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC001000000010135 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC001000000010138 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC001000000010139 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC001000000010140 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
Shree Guruanandji Builders and DevelopersG Total | 7 | |||||||||
SHREE SANSKRUTI BUILDINGS AND DEVELOPERS | P52200026266 | Nashik | Ahmednagar | CC001000000010167 | 2021 | Apr | Hearing Schedule | N | N | 1 |
SHREE SANSKRUTI BUILDINGS AND DEVELOPERS Total | 1 | |||||||||
Grand Total | 11 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
Vitthal Purushottam Sarap | P50100013464 | Amravati | Akola | CC002000000000011 | 2020 | Jul | Hearing Schedule | N | N | 1 |
Vitthal Purushottam Sarap Total | 1 | |||||||||
Grand Total | 1 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
ASHWAMEDH BUILDERS AND DEVELOPERS | P50300009753 | Amravati | Amravati | CC002000000000008 | 2019 | Nov | Complete | N | N | 1 |
CC002000000000017 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
ASHWAMEDH BUILDERS AND DEVELOPERS Total | 2 | |||||||||
Daga Infratech Pvt Ltd | P50300007253 | Amravati | Amravati | CC002000000000016 | 2020 | Aug | Hearing Schedule | N | N | 1 |
CC002000000000021 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
Daga Infratech Pvt Ltd Total | 2 | |||||||||
RUPESH GAJANAN BURGHATE | P50300015999 | Amravati | Amravati | CC002000000000024 | 2021 | Jun | Hearing Schedule | N | N | 1 |
CC002000000000025 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC002000000000027 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC002000000000029 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
CC002000000000033 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
RUPESH GAJANAN BURGHATE Total | 5 | |||||||||
Grand Total | 9 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
A.M.PATEL INFRA PVT LTD | P51500004770 | Aurangabad | Aurangabad | CC003000000010089 | 2021 | Nov | Complete | N | N | 1 |
A.M.PATEL INFRA PVT LTD Total | 1 | |||||||||
Empire Mall Private Limited | P51500003693 | Aurangabad | Aurangabad | CC003000000000019 | 2018 | Jun | Complete | N | N | 1 |
CC003000000000020 | 2018 | Jun | Complete | N | N | 1 | ||||
CC003000000000038 | 2018 | Sep | Complete | N | N | 1 | ||||
CC003000000000039 | 2018 | Sep | Complete | N | N | 1 | ||||
Empire Mall Private Limited Total | 4 | |||||||||
Ganesh Parvatrao Jaybhaye | P51500002890 | Aurangabad | Aurangabad | CC003000000010075 | 2020 | Dec | Complete | N | N | 1 |
Ganesh Parvatrao Jaybhaye Total | 1 | |||||||||
GOLDENDREAM BUILDCON PVT LTD | P51500002918 | Aurangabad | Aurangabad | CC003000000000048 | 2018 | Nov | Complete | N | N | 1 |
P51500005457 | Aurangabad | Aurangabad | CC003000000000058 | 2019 | Jul | Complete | N | N | 1 | |
GOLDENDREAM BUILDCON PVT LTD Total | 2 | |||||||||
HIMANSHU CONSTRUCTIONS | P51500009107 | Aurangabad | Aurangabad | CC003000000000042 | 2018 | Oct | Complete | N | N | 1 |
HIMANSHU CONSTRUCTIONS Total | 1 | |||||||||
KALYAN TOLL INFRASTUCTRURE LTD | P51500027584 | Aurangabad | Aurangabad | CC003000000010087 | 2021 | Oct | Hearing Schedule | N | N | 1 |
KALYAN TOLL INFRASTUCTRURE LTD Total | 1 | |||||||||
NARHARI BUILDERS | P51500015344 | Aurangabad | Aurangabad | CC003000000000011 | 2018 | Feb | Complete | N | N | 1 |
CC003000000000012 | 2018 | Mar | Complete | N | N | 1 | ||||
CC003000000000013 | 2018 | Mar | Complete | N | N | 1 | ||||
CC003000000000014 | 2018 | Mar | Complete | N | N | 1 | ||||
CC003000000000049 | 2019 | Jan | Complete | Y | N | 1 | ||||
CC003000000000050 | 2019 | Jan | Complete | Y | N | 1 | ||||
CC003000000000051 | 2019 | Jan | Complete | Y | N | 1 | ||||
NARHARI BUILDERS Total | 7 | |||||||||
PRATHAMESH BUILDERS | P51500019184 | Aurangabad | Aurangabad | CC003000000010062 | 2020 | Jan | Complete | N | N | 1 |
PRATHAMESH BUILDERS Total | 1 | |||||||||
RAJVEER INFRA PROJECTS | P51500008230 | Aurangabad | Aurangabad | CC003000000000060 | 2019 | Oct | Hearing Schedule | N | N | 1 |
RAJVEER INFRA PROJECTS Total | 1 | |||||||||
S S SINGLETON | P51500009966 | Aurangabad | Aurangabad | CC003000000000022 | 2018 | Jun | Complete | N | N | 1 |
CC003000000000024 | 2018 | Jul | Complete | N | N | 1 | ||||
CC003000000000025 | 2018 | Jul | Complete | N | N | 1 | ||||
S S SINGLETON Total | 3 | |||||||||
SHREE HARI HOUSING RESORTS AND INFRA | P51500020749 | Aurangabad | Aurangabad | CC003000000010074 | 2020 | Dec | Complete | N | N | 1 |
SHREE HARI HOUSING RESORTS AND INFRA Total | 1 | |||||||||
SIMAR PRIDE VENTURES LLP | P51500015775 | Aurangabad | Aurangabad | CC003000000010076 | 2020 | Dec | Hearing Schedule | N | N | 1 |
SIMAR PRIDE VENTURES LLP Total | 1 | |||||||||
SUNDER SIDDHI | P51500011267 | Aurangabad | Aurangabad | CC003000000000007 | 2017 | Oct | Complete | Y | Y | 1 |
CC003000000000008 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC003000000000017 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC003000000000018 | 2018 | May | Complete | Y | Y | 1 | ||||
CC003000000000021 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC003000000000026 | 2018 | Jul | Complete | Y | Y | 1 | ||||
SUNDER SIDDHI Total | 6 | |||||||||
UNIVERSAL ENTERPRISES | P51500011995 | Aurangabad | Aurangabad | CC003000000000027 | 2018 | Aug | Complete | Y | Y | 1 |
CC003000000000028 | 2018 | Aug | Complete | N | N | 1 | ||||
CC003000000000029 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000030 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000031 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000032 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000033 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000034 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000035 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000036 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000037 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC003000000000041 | 2018 | Sep | Complete | N | N | 1 | ||||
CC003000000000043 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC003000000000044 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC003000000000045 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC003000000000046 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC003000000000047 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC003000000010064 | 2020 | Feb | Complete | N | N | 1 | ||||
CC003000000010065 | 2020 | Feb | Complete | N | N | 1 | ||||
UNIVERSAL ENTERPRISES Total | 19 | |||||||||
Vishwa Developers | P51500010410 | Aurangabad | Aurangabad | CC003000000010085 | 2021 | Sep | Hearing Schedule | N | N | 1 |
Vishwa Developers Total | 1 | |||||||||
Grand Total | 50 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
SYNERGY INFRA VENTURES | P50900004166 | Nagpur | Chandrapur | CC004000000000007 | 2017 | Aug | Complete | Y | Y | 1 |
SYNERGY INFRA VENTURES Total | 1 | |||||||||
Grand Total | 1 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
Narendra Ziprulala Kabra | P49900018352 | Nashik | Jalgaon | CC001000000020203 | 2021 | Oct | Hearing Schedule | N | N | 1 |
CC001000000020204 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC001000000020228 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
CC001000000020230 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
Narendra Ziprulala Kabra Total | 4 | |||||||||
PADMAVATI LANDMARK | P49900020068 | Nashik | Jalgaon | CC001000000010182 | 2021 | Apr | Hearing Schedule | N | N | 1 |
PADMAVATI LANDMARK Total | 1 | |||||||||
Grand Total | 5 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
Shivam Promoters and Builders P Ltd | P51400014239 | Aurangabad | Jalna | CC003000000000010 | 2018 | Feb | Complete | N | N | 1 |
Shivam Promoters and Builders P Ltd Total | 1 | |||||||||
Grand Total | 1 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
M.G.DEVELOPERS | P53000007444 | Pune | Kolhapur | CC005000000096245 | 2021 | Nov | Hearing Schedule | N | N | 1 |
M.G.DEVELOPERS Total | 1 | |||||||||
M/S SIGNO CONSTRUCTION AND V J CONSTRUCTION JOINT VENTURE COMPANY | P53000014174 | Pune | Kolhapur | CC005000000022091 | 2019 | Feb | Complete | N | N | 1 |
CC005000000043801 | 2019 | Dec | Complete | N | N | 1 | ||||
M/S SIGNO CONSTRUCTION AND V J CONSTRUCTION JOINT VENTURE COMPANY Total | 2 | |||||||||
Mahalaxmi Developers | P53000009173 | Pune | Kolhapur | CC005000000075142 | 2021 | Feb | Hearing Schedule | N | N | 1 |
CC005000000075147 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
Mahalaxmi Developers Total | 2 | |||||||||
Mayuresh Rajvardhan Builders and Developers | P53000018497 | Pune | Kolhapur | CC005000000075028 | 2021 | Jan | Hearing Schedule | N | N | 1 |
Mayuresh Rajvardhan Builders and Developers Total | 1 | |||||||||
Noushad Ibrahim Bobade | P53000011452 | Pune | Kolhapur | CC005000000064625 | 2020 | Sep | Hearing Schedule | N | N | 1 |
Noushad Ibrahim Bobade Total | 1 | |||||||||
OM ASSOCIATS | P53000013860 | Pune | Kolhapur | CC005000000011583 | 2018 | May | Complete | Y | N | 1 |
OM ASSOCIATS Total | 1 | |||||||||
Patil Bhagwat Developers & Builder | P53000007238 | Pune | Kolhapur | CC005000000085333 | 2021 | Mar | Hearing Schedule | N | N | 1 |
Patil Bhagwat Developers & Builder Total | 1 | |||||||||
Rahul Ashok Desai | P53000019383 | Pune | Kolhapur | CC005000000075171 | 2021 | Feb | Hearing Schedule | N | N | 1 |
Rahul Ashok Desai Total | 1 | |||||||||
SHRI CONSTRUCTIONS | P53000010370 | Pune | Kolhapur | CC005000000011135 | 2018 | Mar | Complete | N | N | 1 |
SHRI CONSTRUCTIONS Total | 1 | |||||||||
TRIVENI INFRAPROJECT PVT LTD | P53000005181 | Pune | Kolhapur | CC005000000064813 | 2020 | Nov | Pending | N | N | 1 |
TRIVENI INFRAPROJECT PVT LTD Total | 1 | |||||||||
VARAD DEVELOPERS | P53000000356 | Pune | Kolhapur | CC005000000022629 | 2019 | Feb | Complete | Y | N | 1 |
VARAD DEVELOPERS Total | 1 | |||||||||
Vision Infra Developers | P53000000151 | Pune | Kolhapur | CC005000000022102 | 2018 | Nov | Hearing Schedule | N | N | 1 |
CC005000000053967 | 2020 | Jan | Complete | N | N | 1 | ||||
Vision Infra Developers Total | 2 | |||||||||
VISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD | P53000010504 | Pune | Kolhapur | CC005000000011924 | 2018 | Oct | Complete | N | N | 1 |
CC005000000064898 | 2020 | Dec | Complete | N | N | 1 | ||||
VISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD Total | 2 | |||||||||
Yash Ventures | P53000007198 | Pune | Kolhapur | CC005000000064674 | 2020 | Oct | Pending | N | N | 1 |
Yash Ventures Total | 1 | |||||||||
Grand Total | 18 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
AADINATH DEVELOPERS | P51900015259 | Konkan | Mumbai City | CC006000000044445 | 2018 | May | Complete | Y | N | 1 |
CC006000000194879 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194888 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194889 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194891 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
AADINATH DEVELOPERS Total | 5 | |||||||||
Aakaar Tanishq Nirmaan J. V. | P51900006567 | Konkan | Mumbai City | CC006000000023938 | 2018 | Mar | Complete | N | N | 1 |
Aakaar Tanishq Nirmaan J. V. Total | 1 | |||||||||
AALAY DEVELOPERS | P51900004114 | Konkan | Mumbai City | CC006000000197023 | 2021 | May | Hearing Schedule | N | N | 1 |
AALAY DEVELOPERS Total | 1 | |||||||||
AARIAASH DEVELOPERS | P51900005993 | Konkan | Mumbai City | CC006000000057392 | 2018 | Dec | Complete | N | N | 1 |
AARIAASH DEVELOPERS Total | 1 | |||||||||
AASTHA ASSOCIATES | P51900016659 | Konkan | Mumbai City | CC006000000079244 | 2019 | May | Complete | N | N | 1 |
AASTHA ASSOCIATES Total | 1 | |||||||||
Accanoor Associates | P51900007718 | Konkan | Mumbai City | CC006000000078850 | 2019 | Apr | Complete | N | N | 1 |
Accanoor Associates Total | 1 | |||||||||
AJS DEVELOPERS | P51900004629 | Konkan | Mumbai City | CC006000000192997 | 2020 | Apr | Hearing Schedule | N | N | 1 |
AJS DEVELOPERS Total | 1 | |||||||||
AKSHAY STHAPATYA PVT. LTD. | P51900005352 | Konkan | Mumbai City | CC006000000001911 | 2017 | Nov | Complete | N | N | 1 |
AKSHAY STHAPATYA PVT. LTD. Total | 1 | |||||||||
ALF DEVELOPERS | P51900010150 | Konkan | Mumbai City | CC006000000023740 | 2018 | Apr | Complete | N | N | 1 |
ALF DEVELOPERS Total | 1 | |||||||||
AMEX DEVELOPERS PVT. LTD., | P51900009319 | Konkan | Mumbai City | CC006000000044208 | 2018 | Apr | Complete | N | N | 1 |
AMEX DEVELOPERS PVT. LTD., Total | 1 | |||||||||
Anil Ramrao Naik | P51900011122 | Konkan | Mumbai City | CC006000000055591 | 2018 | Jul | Complete | Y | Y | 1 |
CC006000000055592 | 2018 | Jul | Complete | Y | Y | 1 | ||||
Anil Ramrao Naik Total | 2 | |||||||||
ARIHANT DEVLOPERS | P51900015921 | Konkan | Mumbai City | CC006000000196659 | 2021 | Apr | Hearing Schedule | N | N | 1 |
ARIHANT DEVLOPERS Total | 1 | |||||||||
Ashwatha Developers | P51900012105 | Konkan | Mumbai City | CC006000000194883 | 2020 | Nov | Complete | N | N | 1 |
Ashwatha Developers Total | 1 | |||||||||
AVARSEKAR REALTY PVT LTD | P51900002867 | Konkan | Mumbai City | CC006000000023202 | 2018 | Feb | Complete | Y | N | 1 |
CC006000000023233 | 2018 | Feb | Complete | Y | N | 1 | ||||
CC006000000023236 | 2018 | Feb | Complete | Y | N | 1 | ||||
CC006000000023237 | 2018 | Feb | Complete | Y | N | 1 | ||||
CC006000000078414 | 2019 | Mar | Complete | Y | Y | 1 | ||||
CC006000000209390 | 2021 | Dec | Pending | N | N | 1 | ||||
AVARSEKAR REALTY PVT LTD Total | 6 | |||||||||
B P Gangar Constructions Pvt Ltd | P51900002859 | Konkan | Mumbai City | CC006000000171672 | 2019 | Nov | Complete | N | N | 1 |
B P Gangar Constructions Pvt Ltd Total | 1 | |||||||||
Balaji Associates | P51900007376 | Konkan | Mumbai City | CC006000000197781 | 2021 | Jul | Pending | N | N | 1 |
Balaji Associates Total | 1 | |||||||||
BALAJI CORPORATION PRIVATE LIMITED | P51900005401 | Konkan | Mumbai City | CC006000000001519 | 2017 | Dec | Complete | N | N | 1 |
CC006000000089799 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089800 | 2019 | Jun | Complete | N | N | 1 | ||||
BALAJI CORPORATION PRIVATE LIMITED Total | 3 | |||||||||
Bhalchandra Wadnerkar | P51900004420 | Konkan | Mumbai City | CC006000000055722 | 2018 | Aug | Complete | N | N | 1 |
Bhalchandra Wadnerkar Total | 1 | |||||||||
Bhavya Infrastructures (India) Private Limited | P51900013855 | Konkan | Mumbai City | CC006000000012383 | 2017 | Dec | Complete | N | N | 1 |
Bhavya Infrastructures (India) Private Limited Total | 1 | |||||||||
BHURJI DEVELOPERS LLP | P51900016656 | Konkan | Mumbai City | CC006000000057953 | 2019 | Feb | Complete | Y | N | 1 |
CC006000000078856 | 2019 | Apr | Complete | N | N | 1 | ||||
BHURJI DEVELOPERS LLP Total | 2 | |||||||||
BINEETA | P51900005602 | Konkan | Mumbai City | CC006000000171488 | 2019 | Nov | Hearing Schedule | N | N | 1 |
CC006000000171489 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
BINEETA Total | 2 | |||||||||
Bridgeview Real Estate Development LLP | P51900001325 | Konkan | Mumbai City | CC006000000196577 | 2021 | Mar | Hearing Schedule | N | N | 1 |
CC006000000196578 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
Bridgeview Real Estate Development LLP Total | 2 | |||||||||
CHANDULAL JORAWARMAL MEHTA | P51900004764 | Konkan | Mumbai City | CC006000000012575 | 2017 | Dec | Complete | N | N | 1 |
CHANDULAL JORAWARMAL MEHTA Total | 1 | |||||||||
Citywood Builders Private Limited | P51900000465 | Konkan | Mumbai City | CC006000000198584 | 2021 | Oct | Hearing Schedule | N | N | 1 |
Citywood Builders Private Limited Total | 1 | |||||||||
Citywood Builders Pvt.Ltd. | P51900000839 | Konkan | Mumbai City | CC006000000193624 | 2020 | Jul | Hearing Schedule | N | N | 1 |
Citywood Builders Pvt.Ltd. Total | 1 | |||||||||
DARVESH PROPERTIES PRIVATE LIMITED | P51900005346 | Konkan | Mumbai City | CC006000000199074 | 2021 | Dec | Hearing Schedule | N | N | 1 |
DARVESH PROPERTIES PRIVATE LIMITED Total | 1 | |||||||||
DESAI RESIDENCY PRIVATE LIMITED | P51900009455 | Konkan | Mumbai City | CC006000000193619 | 2020 | Jul | Hearing Schedule | N | N | 1 |
DESAI RESIDENCY PRIVATE LIMITED Total | 1 | |||||||||
DESAI RESIDENCY PVT.LTD | P51900005231 | Konkan | Mumbai City | CC006000000044259 | 2018 | Apr | Complete | N | N | 1 |
DESAI RESIDENCY PVT.LTD Total | 1 | |||||||||
DIGNITY REALTY | P51900015103 | Konkan | Mumbai City | CC006000000055539 | 2018 | Jul | Complete | N | N | 1 |
CC006000000198363 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
DIGNITY REALTY Total | 2 | |||||||||
DILIP ESTATE & TOWN PLANNERS PVT LTD | P51900006119 | Konkan | Mumbai City | CC006000000044219 | 2018 | Apr | Complete | N | N | 1 |
CC006000000192175 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192274 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000193203 | 2020 | May | Complete | N | N | 1 | ||||
CC006000000194822 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000194824 | 2020 | Nov | Pending | N | N | 1 | ||||
P51900009030 | Konkan | Mumbai City | CC006000000000981 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000209836 | 2022 | Jan | Pending | N | N | 1 | ||||
DILIP ESTATE & TOWN PLANNERS PVT LTD Total | 8 | |||||||||
Dinesh Shivajirao Ghadage | P51900005892 | Konkan | Mumbai City | CC006000000012686 | 2018 | Jan | Complete | Y | Y | 1 |
CC006000000012809 | 2018 | Jan | Complete | Y | N | 1 | ||||
CC006000000022825 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000023717 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000023926 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000044062 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000044127 | 2018 | Apr | Complete | Y | N | 1 | ||||
CC006000000044135 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000054810 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054928 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000110635 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110636 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110637 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110638 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110639 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000110641 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110642 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000197177 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197952 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
Dinesh Shivajirao Ghadage Total | 19 | |||||||||
DK CONSTRUCTION BUILDER AND LAND DEVELOPER | P51900004951 | Konkan | Mumbai City | CC006000000089794 | 2019 | Jun | Complete | N | N | 1 |
DK CONSTRUCTION BUILDER AND LAND DEVELOPER Total | 1 | |||||||||
EAST AND WEST BUILDERS | P51900011167 | Konkan | Mumbai City | CC006000000012384 | 2017 | Dec | Complete | N | N | 1 |
CC006000000055306 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056095 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056225 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000056536 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056790 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000079456 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000089649 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100538 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000196118 | 2021 | Feb | Complete | N | N | 1 | ||||
EAST AND WEST BUILDERS Total | 10 | |||||||||
EKTA WORLD PRIVATE LIMITED | P51900000192 | Konkan | Mumbai City | CC006000000023341 | 2018 | Feb | Complete | N | N | 1 |
EKTA WORLD PRIVATE LIMITED Total | 1 | |||||||||
Elite Housing Developers LLP | P51900007928 | Konkan | Mumbai City | CC006000000057803 | 2019 | Jan | Complete | N | N | 1 |
CC006000000079230 | 2019 | May | Complete | N | N | 1 | ||||
Elite Housing Developers LLP Total | 2 | |||||||||
EMPRESS DEVELOPERS | P51900007758 | Konkan | Mumbai City | CC006000000195888 | 2021 | Feb | Hearing Schedule | N | N | 1 |
EMPRESS DEVELOPERS Total | 1 | |||||||||
ESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED | P51900016554 | Konkan | Mumbai City | CC006000000196410 | 2021 | Mar | Hearing Schedule | N | N | 1 |
ESTELLE ESTATES & INFRASTRUCTURE PRIVATE LIMITED Total | 1 | |||||||||
EXCELLENT REALTOR DEVELOPERS | P51900004434 | Konkan | Mumbai City | CC006000000055604 | 2018 | Aug | Complete | Y | N | 1 |
CC006000000057688 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000078983 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000198230 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000209755 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
EXCELLENT REALTOR DEVELOPERS Total | 5 | |||||||||
FAIRDEAL CONSTRUCTIONS | P51900003402 | Konkan | Mumbai City | CC006000000078342 | 2019 | Mar | Hearing Schedule | N | N | 1 |
CC006000000078394 | 2019 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000078778 | 2019 | Apr | Hearing Schedule | N | N | 1 | ||||
FAIRDEAL CONSTRUCTIONS Total | 3 | |||||||||
Faithfull Developers | P51900003161 | Konkan | Mumbai City | CC006000000057611 | 2019 | Jan | Complete | N | N | 1 |
CC006000000161259 | 2019 | Oct | Complete | N | N | 1 | ||||
Faithfull Developers Total | 2 | |||||||||
FALAKDEVELOPER | P51900013072 | Konkan | Mumbai City | CC006000000056616 | 2018 | Oct | Complete | Y | N | 1 |
CC006000000057154 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000194895 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
FALAKDEVELOPER Total | 3 | |||||||||
Firoz UsmanTinwala | P51900010592 | Konkan | Mumbai City | CC006000000001235 | 2017 | Oct | Complete | Y | Y | 1 |
CC006000000001813 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012471 | 2017 | Dec | Complete | N | N | 1 | ||||
Firoz UsmanTinwala Total | 3 | |||||||||
FIRST STONE | P51900001589 | Konkan | Mumbai City | CC006000000078958 | 2019 | Apr | Complete | Y | N | 1 |
CC006000000079012 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000079013 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000197777 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197778 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197779 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
FIRST STONE Total | 6 | |||||||||
Firstlight Properties Private Limited | P51900011726 | Konkan | Mumbai City | CC006000000056070 | 2018 | Sep | Complete | N | N | 1 |
Firstlight Properties Private Limited Total | 1 | |||||||||
G S A CONSTRUCTIONS | P51900009097 | Konkan | Mumbai City | CC006000000054646 | 2018 | May | Complete | N | N | 1 |
CC006000000054972 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000161301 | 2020 | Feb | Complete | N | N | 1 | ||||
G S A CONSTRUCTIONS Total | 3 | |||||||||
GHANSHAM PROPERTIES | P51900014191 | Konkan | Mumbai City | CC006000000056134 | 2018 | Sep | Complete | N | N | 1 |
GHANSHAM PROPERTIES Total | 1 | |||||||||
Glider Buildcon Realtors | P51900015854 | Konkan | Mumbai City | CC006000000079278 | 2019 | May | Hearing Schedule | N | N | 1 |
CC006000000193400 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193662 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193814 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193972 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198315 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000199144 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
P51900016482 | Konkan | Mumbai City | CC006000000196359 | 2021 | Mar | Hearing Schedule | N | N | 1 | |
CC006000000196476 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
P51900021057 | Konkan | Mumbai City | CC006000000193989 | 2020 | Oct | Hearing Schedule | N | N | 1 | |
CC006000000197737 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
Glider Buildcon Realtors Total | 11 | |||||||||
Glider Buildcon Realtors Private Limited | P51900003324 | Konkan | Mumbai City | CC006000000171890 | 2019 | Dec | Hearing Schedule | N | N | 1 |
CC006000000194792 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195198 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000198423 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198764 | 2021 | Oct | Pending | N | N | 1 | ||||
P51900018039 | Konkan | Mumbai City | CC006000000199073 | 2021 | Nov | Hearing Schedule | N | N | 1 | |
CC006000000209484 | 2022 | Jan | Pending | N | N | 1 | ||||
P51900020330 | Konkan | Mumbai City | CC006000000193444 | 2020 | Jul | Hearing Schedule | N | N | 1 | |
CC006000000196722 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196734 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
Glider Buildcon Realtors Private Limited Total | 10 | |||||||||
Gold Star Builders & Developers Pvt.Ltd. | P51900006038 | Konkan | Mumbai City | CC006000000193629 | 2020 | Aug | Hearing Schedule | N | N | 1 |
Gold Star Builders & Developers Pvt.Ltd. Total | 1 | |||||||||
Goodtime Real Estate Development Private Limited | P51900000642 | Konkan | Mumbai City | CC006000000001201 | 2017 | Dec | Complete | N | N | 1 |
CC006000000012742 | 2018 | Jan | Complete | N | N | 1 | ||||
Goodtime Real Estate Development Private Limited Total | 2 | |||||||||
Goodwill Properties Pvt Ltd | P51900001665 | Konkan | Mumbai City | CC006000000100252 | 2019 | Jul | Complete | Y | N | 1 |
Goodwill Properties Pvt Ltd Total | 1 | |||||||||
GOVIND MARUTIRAO KAKDE | P51900004392 | Konkan | Mumbai City | CC006000000044132 | 2018 | Apr | Complete | N | N | 1 |
CC006000000055230 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000194521 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194523 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194525 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194526 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194530 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194531 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194532 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194533 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194534 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194537 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194600 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000195118 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000196761 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
GOVIND MARUTIRAO KAKDE Total | 15 | |||||||||
GRS SHELTERS PRIVATE LIMITED | P51900008828 | Konkan | Mumbai City | CC006000000000484 | 2017 | Sep | Complete | N | N | 1 |
GRS SHELTERS PRIVATE LIMITED Total | 1 | |||||||||
Gupta Housing Pvt Ltd | P51900005034 | Konkan | Mumbai City | CC006000000000959 | 2017 | Sep | Complete | N | N | 1 |
CC006000000001375 | 2017 | Oct | Complete | N | N | 1 | ||||
Gupta Housing Pvt Ltd Total | 2 | |||||||||
H G Properties and Investments Private Limited | P51900011232 | Konkan | Mumbai City | CC006000000044027 | 2018 | Apr | Complete | N | N | 1 |
H G Properties and Investments Private Limited Total | 1 | |||||||||
HANWARE REALTY | P51900019260 | Konkan | Mumbai City | CC006000000171526 | 2019 | Nov | Complete | N | N | 1 |
HANWARE REALTY Total | 1 | |||||||||
HARE KRISHNA BUILDER | P51900008778 | Konkan | Mumbai City | CC006000000000291 | 2017 | Aug | Complete | N | N | 1 |
CC006000000001484 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000198271 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
HARE KRISHNA BUILDER Total | 3 | |||||||||
HBS Seaview Pvt Ltd | P51900009287 | Konkan | Mumbai City | CC006000000078822 | 2019 | Apr | Complete | N | N | 1 |
CC006000000195695 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195788 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
HBS Seaview Pvt Ltd Total | 3 | |||||||||
Hema Shantilal Bhagat | P51900030681 | Konkan | Mumbai City | CC006000000198455 | 2021 | Sep | Hearing Schedule | N | N | 1 |
Hema Shantilal Bhagat Total | 1 | |||||||||
HEMANT BHANUSHANKAR VYAS | P51900012122 | Konkan | Mumbai City | CC006000000001367 | 2017 | Oct | Complete | Y | Y | 1 |
CC006000000001371 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001386 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001977 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000023530 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044437 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055704 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000057296 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078314 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000089929 | 2019 | Jul | Complete | N | N | 1 | ||||
HEMANT BHANUSHANKAR VYAS Total | 10 | |||||||||
Hi Rock Construction Pvt Ltd | P51900004158 | Konkan | Mumbai City | CC006000000196799 | 2021 | Apr | Hearing Schedule | N | N | 1 |
CC006000000196802 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
Hi Rock Construction Pvt Ltd Total | 2 | |||||||||
HILTON INFRASTRUCTURE | P51900009939 | Konkan | Mumbai City | CC006000000198417 | 2021 | Nov | Pending | N | N | 1 |
CC006000000198418 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198528 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198532 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198534 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198535 | 2021 | Nov | Pending | N | N | 1 | ||||
HILTON INFRASTRUCTURE Total | 6 | |||||||||
HONEST SHELTERS PRIVATE LTD | P51900006786 | Konkan | Mumbai City | CC006000000001602 | 2017 | Oct | Complete | Y | N | 1 |
HONEST SHELTERS PRIVATE LTD Total | 1 | |||||||||
HOOR CONSTRUCTIONS | P51900009360 | Konkan | Mumbai City | CC006000000056062 | 2018 | Sep | Complete | N | N | 1 |
HOOR CONSTRUCTIONS Total | 1 | |||||||||
HORIZON REALTY | P51900009490 | Konkan | Mumbai City | CC006000000012294 | 2017 | Dec | Complete | N | N | 1 |
HORIZON REALTY Total | 1 | |||||||||
Imtiaz Saigara and Ahmedi Delawala | P51900007731 | Konkan | Mumbai City | CC006000000054603 | 2018 | May | Complete | Y | Y | 1 |
Imtiaz Saigara and Ahmedi Delawala Total | 1 | |||||||||
Indiabulls Infraestate Limited | P51900000469 | Konkan | Mumbai City | CC006000000056266 | 2018 | Sep | Complete | N | N | 1 |
CC006000000193008 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193010 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193011 | 2020 | Mar | Complete | N | N | 1 | ||||
P51900000473 | Konkan | Mumbai City | CC006000000100523 | 2019 | Aug | Complete | N | N | 1 | |
CC006000000100525 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000171910 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000194436 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195798 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195801 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195802 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
P51900000843 | Konkan | Mumbai City | CC006000000194676 | 2020 | Oct | Pending | N | N | 1 | |
CC006000000198236 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
P51900000871 | Konkan | Mumbai City | CC006000000194678 | 2020 | Oct | Hearing Schedule | N | N | 1 | |
CC006000000195684 | 2021 | Jan | Pending | N | N | 1 | ||||
Indiabulls Infraestate Limited Total | 15 | |||||||||
Indiabulls Properties Private Limited | P51900000467 | Konkan | Mumbai City | CC006000000023024 | 2018 | Feb | Hearing Schedule | N | N | 1 |
CC006000000089765 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100514 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000171638 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000192736 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000194389 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194632 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194664 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195076 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195158 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196265 | 2021 | Mar | Pending | N | N | 1 | ||||
CC006000000196426 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196473 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196672 | 2021 | Apr | Pending | N | N | 1 | ||||
P51900000616 | Konkan | Mumbai City | CC006000000012562 | 2018 | Jan | Complete | N | N | 1 | |
CC006000000023072 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023363 | 2018 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000056124 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056167 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000089570 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100465 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110695 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110704 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110705 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110840 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000110874 | 2019 | Sep | Pending | N | N | 1 | ||||
CC006000000161347 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000192490 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000194652 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000195052 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000197022 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197352 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198983 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199002 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Indiabulls Properties Private Limited Total | 34 | |||||||||
J.P. PORWAL REALTY | P51900012757 | Konkan | Mumbai City | CC006000000171894 | 2019 | Dec | Complete | N | N | 1 |
CC006000000209509 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
J.P. PORWAL REALTY Total | 2 | |||||||||
JANAK S DOSHI | P51900011656 | Konkan | Mumbai City | CC006000000198218 | 2021 | Sep | Hearing Schedule | N | N | 1 |
JANAK S DOSHI Total | 1 | |||||||||
JANZEB AMIRKAMAL KHAN | P51900007426 | Konkan | Mumbai City | CC006000000181971 | 2019 | Dec | Complete | N | N | 1 |
JANZEB AMIRKAMAL KHAN Total | 1 | |||||||||
JOHAAN REALTORS AND DEVELOPERS PRIVATE LIMITED | P51900021100 | Konkan | Mumbai City | CC006000000161447 | 2019 | Nov | Complete | N | N | 1 |
JOHAAN REALTORS AND DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
Jyotindrakumar Punamchand Shah | P51800015543 | Konkan | Mumbai City | CC006000000192815 | 2020 | Mar | Hearing Schedule | N | N | 1 |
Jyotindrakumar Punamchand Shah Total | 1 | |||||||||
K Merchant Construction Ltd | P51900012655 | Konkan | Mumbai City | CC006000000100209 | 2019 | Jul | Complete | Y | N | 1 |
K Merchant Construction Ltd Total | 1 | |||||||||
K RAS GROUP | P51900011299 | Konkan | Mumbai City | CC006000000055378 | 2018 | Jul | Complete | N | N | 1 |
CC006000000182031 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
K RAS GROUP Total | 2 | |||||||||
Kalpataru Limited | P51900000793 | Konkan | Mumbai City | CC006000000193772 | 2020 | Aug | Hearing Schedule | N | N | 1 |
CC006000000193775 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193776 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193777 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193778 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193780 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000196006 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196007 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196012 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196013 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196065 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196066 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000197819 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
Kalpataru Limited Total | 13 | |||||||||
kalpavruksha | P51900009748 | Konkan | Mumbai City | CC006000000012517 | 2018 | Jan | Complete | N | N | 1 |
CC006000000023378 | 2018 | Jun | Complete | N | N | 1 | ||||
kalpavruksha Total | 2 | |||||||||
KAMALA MILLS LIMITED | P51900013638 | Konkan | Mumbai City | CC006000000056689 | 2018 | Oct | Complete | N | N | 1 |
CC006000000197770 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
KAMALA MILLS LIMITED Total | 2 | |||||||||
KANAKIA SPACES REALTY PRIVATE LIMITED | P51900000206 | Konkan | Mumbai City | CC006000000141101 | 2019 | Oct | Complete | N | N | 1 |
CC006000000193308 | 2020 | Jun | Complete | N | N | 1 | ||||
CC006000000193392 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000195527 | 2021 | Jan | Complete | N | N | 1 | ||||
KANAKIA SPACES REALTY PRIVATE LIMITED Total | 4 | |||||||||
Kapil Constructions | P51900006866 | Konkan | Mumbai City | CC006000000044103 | 2018 | Jul | Complete | N | N | 1 |
CC006000000198126 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Kapil Constructions Total | 2 | |||||||||
Karwa and Kewal Kiran Realtors (AOP) | P51900003381 | Konkan | Mumbai City | CC006000000198262 | 2021 | Sep | Hearing Schedule | N | N | 1 |
Karwa and Kewal Kiran Realtors (AOP) Total | 1 | |||||||||
KESAR HOUSING & DEVELOPMENT CO | P51900002119 | Konkan | Mumbai City | CC006000000195485 | 2021 | Jan | Complete | N | N | 1 |
KESAR HOUSING & DEVELOPMENT CO Total | 1 | |||||||||
Kohinoor CTNL Infrastructure Company Private Limited | P51900004769 | Konkan | Mumbai City | CC006000000012400 | 2017 | Dec | Complete | N | N | 1 |
P51900012308 | Konkan | Mumbai City | CC006000000197798 | 2021 | Jul | Hearing Schedule | N | N | 1 | |
CC006000000197799 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
Kohinoor CTNL Infrastructure Company Private Limited Total | 3 | |||||||||
KRYPTON CONSTRUCTION & DEVELOPERS | P51900009619 | Konkan | Mumbai City | CC006000000197623 | 2021 | Jul | Hearing Schedule | N | N | 1 |
KRYPTON CONSTRUCTION & DEVELOPERS Total | 1 | |||||||||
Kumar Builders | P51900009276 | Konkan | Mumbai City | CC006000000001705 | 2017 | Nov | Complete | N | N | 1 |
CC006000000044020 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044041 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044044 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044045 | 2018 | Apr | Complete | N | N | 1 | ||||
Kumar Builders Total | 5 | |||||||||
KUMAR BUILDERS MUMBAI REALTY PVT LTD | P51900011786 | Konkan | Mumbai City | CC006000000000872 | 2017 | Sep | Complete | Y | N | 1 |
CC006000000058077 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000100503 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000193707 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193899 | 2020 | Sep | Complete | N | N | 1 | ||||
KUMAR BUILDERS MUMBAI REALTY PVT LTD Total | 5 | |||||||||
KUMAR URBAN DEVELOPMENT PRIVATE LIMITED | P51900006503 | Konkan | Mumbai City | CC006000000001972 | 2017 | Nov | Complete | N | N | 1 |
CC006000000001989 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012144 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012536 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000023756 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000054932 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000056523 | 2018 | Oct | Complete | N | N | 1 | ||||
KUMAR URBAN DEVELOPMENT PRIVATE LIMITED Total | 7 | |||||||||
L&T Parel Project LLP (JV with ORDPL) | P51900004544 | Konkan | Mumbai City | CC006000000055706 | 2018 | Aug | Complete | N | N | 1 |
CC006000000090168 | 2019 | Aug | Complete | N | N | 1 | ||||
P51900004666 | Konkan | Mumbai City | CC006000000044039 | 2018 | Apr | Complete | N | N | 1 | |
CC006000000054593 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000120992 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000182055 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000193204 | 2020 | May | Complete | N | N | 1 | ||||
P51900005188 | Konkan | Mumbai City | CC006000000055716 | 2018 | Aug | Complete | N | N | 1 | |
CC006000000192573 | 2020 | Feb | Complete | N | N | 1 | ||||
P51900006593 | Konkan | Mumbai City | CC006000000054619 | 2018 | May | Complete | N | N | 1 | |
CC006000000054675 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056005 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000057866 | 2019 | Jan | Complete | N | N | 1 | ||||
P51900010178 | Konkan | Mumbai City | CC006000000057695 | 2019 | Jan | Complete | Y | N | 1 | |
CC006000000078938 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000100572 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000100574 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000171553 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000193597 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193741 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000196327 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196699 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197130 | 2021 | Jun | Complete | N | N | 1 | ||||
L&T Parel Project LLP (JV with ORDPL) Total | 23 | |||||||||
Labdhi Lifestyle Limited | P51900009217 | Konkan | Mumbai City | CC006000000000407 | 2017 | Sep | Complete | N | N | 1 |
Labdhi Lifestyle Limited Total | 1 | |||||||||
LAKADAWALA DEVELOPERS PVT LTD | P51900006368 | Konkan | Mumbai City | CC006000000012697 | 2018 | Jan | Complete | N | N | 1 |
P51900007782 | Konkan | Mumbai City | CC006000000001275 | 2017 | Nov | Complete | N | N | 1 | |
LAKADAWALA DEVELOPERS PVT LTD Total | 2 | |||||||||
Lalitambika Builders & Developers Private Limited | P51900021927 | Konkan | Mumbai City | CC006000000171701 | 2019 | Nov | Complete | N | N | 1 |
Lalitambika Builders & Developers Private Limited Total | 1 | |||||||||
LIFE Spaces Realty Private Limited | P51900000590 | Konkan | Mumbai City | CC006000000078430 | 2019 | Oct | Complete | N | N | 1 |
LIFE Spaces Realty Private Limited Total | 1 | |||||||||
LOKHANDWALA INFRASTRUCTURE PRIVATE LIMITED | P51900009787 | Konkan | Mumbai City | CC006000000193946 | 2020 | Sep | Hearing Schedule | N | N | 1 |
CC006000000195093 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195096 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195097 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195182 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196985 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
LOKHANDWALA INFRASTRUCTURE PRIVATE LIMITED Total | 6 | |||||||||
Lokhandwala Kataria Construction Private Limited | P51900008204 | Konkan | Mumbai City | CC006000000055828 | 2018 | Aug | Complete | Y | N | 1 |
CC006000000056191 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056240 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056506 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000057728 | 2019 | Jan | Complete | Y | N | 1 | ||||
CC006000000057771 | 2019 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000079369 | 2019 | Jun | Complete | Y | N | 1 | ||||
CC006000000110734 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000171537 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171880 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000171883 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000192279 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000194241 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194512 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194623 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194634 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195243 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000196924 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197027 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197043 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197697 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000198052 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000199347 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199348 | 2021 | Dec | Pending | N | N | 1 | ||||
Lokhandwala Kataria Construction Private Limited Total | 24 | |||||||||
M/s Alamdar Infrastructure Pvt Ltd | P51900002919 | Konkan | Mumbai City | CC006000000089759 | 2019 | Jun | Complete | Y | Y | 1 |
M/s Alamdar Infrastructure Pvt Ltd Total | 1 | |||||||||
M/s Royal Developers | P51900008923 | Konkan | Mumbai City | CC006000000001309 | 2017 | Oct | Complete | N | N | 1 |
CC006000000012513 | 2017 | Dec | Complete | Y | Y | 1 | ||||
CC006000000197685 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
M/s Royal Developers Total | 3 | |||||||||
M/s Sandeep Estate Development Private limited | P51900013846 | Konkan | Mumbai City | CC006000000056072 | 2018 | Oct | Complete | Y | N | 1 |
M/s Sandeep Estate Development Private limited Total | 1 | |||||||||
M/s Shree Shantinagar Venture | P51900004016 | Konkan | Mumbai City | CC006000000000498 | 2017 | Sep | Complete | N | N | 1 |
CC006000000057004 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000195319 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
M/s Shree Shantinagar Venture Total | 3 | |||||||||
M/S. A.K. DEVELOPERS | P51900007083 | Konkan | Mumbai City | CC006000000182098 | 2020 | Jan | Complete | N | N | 1 |
M/S. A.K. DEVELOPERS Total | 1 | |||||||||
M/S. OM SIDDHI VENTURE | P51900010775 | Konkan | Mumbai City | CC006000000056668 | 2018 | Oct | Complete | N | N | 1 |
CC006000000110808 | 2019 | Sep | Complete | N | N | 1 | ||||
M/S. OM SIDDHI VENTURE Total | 2 | |||||||||
M/S. S.B.ABODES PVT.LTD. | P51900005417 | Konkan | Mumbai City | CC006000000089797 | 2019 | Jun | Complete | Y | N | 1 |
M/S. S.B.ABODES PVT.LTD. Total | 1 | |||||||||
M/s. Sejal Shakti Realtors LLP | P51900021044 | Konkan | Mumbai City | CC006000000199346 | 2021 | Dec | Hearing Schedule | N | N | 1 |
M/s. Sejal Shakti Realtors LLP Total | 1 | |||||||||
MACROTECH DEVELOPERS LIMITED | P51900000314 | Konkan | Mumbai City | CC006000000000012 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001273 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000001739 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000054829 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055440 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056196 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056771 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056889 | 2018 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000056939 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057011 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057094 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057136 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057204 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057206 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057207 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057370 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057378 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057423 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057426 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057442 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057444 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057445 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057447 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057450 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057582 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057592 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057698 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057917 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078405 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078452 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078557 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078572 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078845 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078859 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089796 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000171937 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192200 | 2020 | Jan | Complete | N | N | 1 | ||||
P51900000367 | Konkan | Mumbai City | CC006000000023007 | 2018 | Jan | Complete | N | N | 1 | |
CC006000000044535 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055830 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056052 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056890 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057449 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057451 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057816 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078387 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078556 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000079035 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089855 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000110729 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000110730 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000196867 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
P51900000521 | Konkan | Mumbai City | CC006000000079161 | 2019 | May | Complete | N | N | 1 | |
CC006000000197608 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
P51900000567 | Konkan | Mumbai City | CC006000000012209 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000044384 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056891 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057446 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057869 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057870 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078424 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000171938 | 2020 | Jan | Complete | N | N | 1 | ||||
P51900000629 | Konkan | Mumbai City | CC006000000057692 | 2019 | Jan | Complete | N | N | 1 | |
CC006000000171818 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000196146 | 2021 | Mar | Complete | N | N | 1 | ||||
P51900000828 | Konkan | Mumbai City | CC006000000055225 | 2018 | Jul | Complete | N | N | 1 | |
CC006000000056650 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056669 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056671 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056673 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056815 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000056818 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000056821 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057398 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057401 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057558 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057559 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000195624 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000198752 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
P51900001339 | Konkan | Mumbai City | CC006000000001533 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000022876 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000055262 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000057054 | 2018 | Nov | Complete | Y | N | 1 | ||||
CC006000000058028 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058029 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078294 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078496 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000089625 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089763 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000090182 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000100425 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100470 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000100571 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000110906 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000120942 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000141065 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000141146 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000141148 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000171846 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171886 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000182065 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192733 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192757 | 2020 | Jun | Complete | N | N | 1 | ||||
CC006000000192966 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000193296 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000193337 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000193555 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193739 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193791 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193793 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193830 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000193952 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194865 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195082 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195676 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195884 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195903 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196082 | 2021 | Feb | Pending | N | N | 1 | ||||
CC006000000196547 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196605 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196921 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000196932 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197476 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197477 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000198232 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198490 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198698 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000198960 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000199107 | 2021 | Nov | Pending | N | N | 1 | ||||
P51900005378 | Konkan | Mumbai City | CC006000000056315 | 2018 | Nov | Complete | N | N | 1 | |
CC006000000056656 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056663 | 2018 | Oct | Complete | N | N | 1 | ||||
2019 | Dec | Complete | N | N | 1 | |||||
CC006000000056664 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056672 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056674 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000057397 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000171559 | 2019 | Nov | Complete | N | N | 1 | ||||
P51900008345 | Konkan | Mumbai City | CC006000000012473 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000023905 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000055765 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056081 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056086 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056843 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057072 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057078 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057693 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057918 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000100464 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000192252 | 2020 | May | Complete | N | N | 1 | ||||
CC006000000196305 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196442 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000197951 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
P51900008962 | Konkan | Mumbai City | CC006000000055832 | 2018 | Aug | Complete | N | N | 1 | |
CC006000000057081 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000194736 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194737 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194738 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195129 | 2020 | Dec | Pending | N | N | 1 | ||||
P51900014984 | Konkan | Mumbai City | CC006000000171595 | 2019 | Nov | Hearing Schedule | N | N | 1 | |
P51900015715 | Konkan | Mumbai City | CC006000000196919 | 2021 | May | Pending | N | N | 1 | |
CC006000000197261 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197984 | 2021 | Aug | Pending | N | N | 1 | ||||
P51900016526 | Konkan | Mumbai City | CC006000000196095 | 2021 | Feb | Hearing Schedule | N | N | 1 | |
MACROTECH DEVELOPERS LIMITED Total | 164 | |||||||||
Matoshree Properties | P51900003736 | Konkan | Mumbai City | CC006000000079299 | 2019 | May | Complete | Y | N | 1 |
CC006000000079334 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000079352 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000079382 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000089590 | 2019 | Jun | Complete | Y | N | 1 | ||||
CC006000000193390 | 2020 | Jul | Complete | N | N | 1 | ||||
P51900006687 | Konkan | Mumbai City | CC006000000100586 | 2019 | Aug | Complete | Y | N | 1 | |
Matoshree Properties Total | 7 | |||||||||
METADESIGN INDIA PVT LTD | P51900006531 | Konkan | Mumbai City | CC006000000012074 | 2017 | Nov | Complete | N | N | 1 |
METADESIGN INDIA PVT LTD Total | 1 | |||||||||
METAFACE INDIA AOP | P51900006979 | Konkan | Mumbai City | CC006000000209477 | 2021 | Dec | Pending | N | N | 1 |
CC006000000209539 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209608 | 2022 | Jan | Pending | N | N | 1 | ||||
METAFACE INDIA AOP Total | 3 | |||||||||
Mindset Estates Private Limited | P51900009854 | Konkan | Mumbai City | CC006000000012794 | 2018 | Jan | Complete | N | N | 1 |
Mindset Estates Private Limited Total | 1 | |||||||||
MOHAMMED AKRAM HUSAIN NIRBAN | P51900010679 | Konkan | Mumbai City | CC006000000182069 | 2020 | Jan | Complete | N | N | 1 |
MOHAMMED AKRAM HUSAIN NIRBAN Total | 1 | |||||||||
MS RELLIANCE CONSTRUCTION CO | P51900010428 | Konkan | Mumbai City | CC006000000078197 | 2019 | Feb | Complete | N | N | 1 |
MS RELLIANCE CONSTRUCTION CO Total | 1 | |||||||||
Mumbai Shelter Housing Development | P51800001120 | Konkan | Mumbai City | CC006000000023199 | 2018 | Feb | Complete | N | N | 1 |
CC006000000195749 | 2021 | Jan | Complete | N | N | 1 | ||||
Mumbai Shelter Housing Development Total | 2 | |||||||||
Mustanshir Merchant | P51900012891 | Konkan | Mumbai City | CC006000000044499 | 2018 | Jun | Complete | Y | Y | 1 |
CC006000000055411 | 2018 | Jul | Complete | Y | N | 1 | ||||
Mustanshir Merchant Total | 2 | |||||||||
NEELKAMAL REALTORS TOWER PRIVATE LIMITED | P51900005216 | Konkan | Mumbai City | CC006000000001255 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001256 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000012348 | 2017 | Dec | Complete | Y | Y | 1 | ||||
CC006000000012535 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000044089 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000057603 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078702 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000194351 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194571 | 2020 | Oct | Complete | N | N | 1 | ||||
P51900006299 | Konkan | Mumbai City | CC006000000012337 | 2017 | Dec | Complete | Y | Y | 1 | |
CC006000000195203 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196769 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196770 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
NEELKAMAL REALTORS TOWER PRIVATE LIMITED Total | 13 | |||||||||
NEUMEC DEVELOPER AND BUILDERS | P51900012467 | Konkan | Mumbai City | CC006000000044450 | 2018 | May | Complete | N | N | 1 |
NEUMEC DEVELOPER AND BUILDERS Total | 1 | |||||||||
NIRBAN INFRASTRUCTURE PVT LTD | P51900008056 | Konkan | Mumbai City | CC006000000001959 | 2017 | Nov | Complete | N | N | 1 |
NIRBAN INFRASTRUCTURE PVT LTD Total | 1 | |||||||||
Oasis Realty | P51900012115 | Konkan | Mumbai City | CC006000000001408 | 2017 | Oct | Complete | N | N | 1 |
CC006000000198120 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
Oasis Realty Total | 2 | |||||||||
OJUS DEVELOPERS | P51900008215 | Konkan | Mumbai City | CC006000000197541 | 2021 | Jul | Pending | N | N | 1 |
OJUS DEVELOPERS Total | 1 | |||||||||
Om Omega Shelters | P51900009906 | Konkan | Mumbai City | CC006000000056228 | 2018 | Sep | Complete | N | N | 1 |
Om Omega Shelters Total | 1 | |||||||||
Om Shanti Developers | P51900003605 | Konkan | Mumbai City | CC006000000196273 | 2021 | Mar | Hearing Schedule | N | N | 1 |
Om Shanti Developers Total | 1 | |||||||||
Omkar Realtors and Developers Private Limited | P51900003316 | Konkan | Mumbai City | CC006000000054700 | 2018 | Jun | Complete | N | N | 1 |
CC006000000056047 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000078473 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078904 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000100472 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100477 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000171855 | 2019 | Dec | Complete | Y | Y | 1 | ||||
CC006000000181985 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000181987 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195169 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000196040 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196216 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196222 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196401 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000198526 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
Omkar Realtors and Developers Private Limited Total | 15 | |||||||||
ORBIT CORPORATION LTD | P51900013466 | Konkan | Mumbai City | CC006000000055809 | 2018 | Aug | Complete | N | N | 1 |
ORBIT CORPORATION LTD Total | 1 | |||||||||
Ornate Spaces Private Limited | P51900009142 | Konkan | Mumbai City | CC006000000141135 | 2019 | Oct | Complete | N | N | 1 |
CC006000000192184 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000194078 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000199087 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Ornate Spaces Private Limited Total | 4 | |||||||||
Ozone Homes Pvt Ltd | P51900009133 | Konkan | Mumbai City | CC006000000055730 | 2018 | Aug | Complete | Y | N | 1 |
CC006000000196861 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000198494 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198735 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198996 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199155 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199190 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
Ozone Homes Pvt Ltd Total | 7 | |||||||||
PARADISE ASSOCIATES | P51900010342 | Konkan | Mumbai City | CC006000000012230 | 2017 | Nov | Complete | N | N | 1 |
PARADISE ASSOCIATES Total | 1 | |||||||||
Parekh Constructions | P51900011563 | Konkan | Mumbai City | CC006000000209689 | 2022 | Jan | Pending | N | N | 1 |
Parekh Constructions Total | 1 | |||||||||
PARK VIEW DEVELOPERS | P51900008196 | Konkan | Mumbai City | CC006000000001760 | 2017 | Nov | Complete | N | N | 1 |
CC006000000192643 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000195633 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
PARK VIEW DEVELOPERS Total | 3 | |||||||||
Peninsula Land Limited | P51900005432 | Konkan | Mumbai City | CC006000000023762 | 2018 | Mar | Complete | N | N | 1 |
CC006000000023763 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000192935 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194609 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195262 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000197051 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197308 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197822 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000198610 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
Peninsula Land Limited Total | 9 | |||||||||
Pragatej Builders And Developers Pvt Ltds | P51900005324 | Konkan | Mumbai City | CC006000000023718 | 2018 | Mar | Complete | N | N | 1 |
CC006000000195842 | 2021 | Feb | Complete | N | N | 1 | ||||
Pragatej Builders And Developers Pvt Ltds Total | 2 | |||||||||
R A ASSOCIATES | P51900001634 | Konkan | Mumbai City | CC006000000197392 | 2021 | Jun | Hearing Schedule | N | N | 1 |
R A ASSOCIATES Total | 1 | |||||||||
R R Builders | P51900003595 | Konkan | Mumbai City | CC006000000057374 | 2018 | Dec | Complete | N | N | 1 |
CC006000000141110 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000141140 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000151209 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000151212 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000151213 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000151217 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000151219 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000193314 | 2020 | Jun | Complete | N | N | 1 | ||||
CC006000000198355 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
R R Builders Total | 10 | |||||||||
RADIUS SUMER DEVELOPERS PRIVATE LIMITED | P51900004243 | Konkan | Mumbai City | CC006000000194604 | 2020 | Oct | Hearing Schedule | N | N | 1 |
CC006000000197111 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
RADIUS SUMER DEVELOPERS PRIVATE LIMITED Total | 2 | |||||||||
Raheja Universal (Pvt.) Ltd. | P51900009379 | Konkan | Mumbai City | CC006000000192980 | 2020 | Mar | Complete | N | N | 1 |
CC006000000193297 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198272 | 2021 | Sep | Complete | N | N | 1 | ||||
Raheja Universal (Pvt.) Ltd. Total | 3 | |||||||||
Realgem Buildtech Private Limited | P51900003268 | Konkan | Mumbai City | CC006000000000411 | 2017 | Sep | Complete | N | N | 1 |
CC006000000023635 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023654 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000043990 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044305 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000055089 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000057156 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057394 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057395 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057404 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057506 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000068165 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078497 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078571 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078578 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078638 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078640 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078641 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078645 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078773 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079173 | 2019 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000079251 | 2019 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000171633 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000171634 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171945 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000171948 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000192265 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192337 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192805 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192808 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193132 | 2020 | Apr | Complete | N | N | 1 | ||||
CC006000000193603 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193606 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193924 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194894 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195172 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000197918 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000197954 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198108 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198377 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198965 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199180 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199191 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209717 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209733 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209851 | 2022 | Jan | Pending | N | N | 1 | ||||
P51900006367 | Konkan | Mumbai City | CC006000000000388 | 2017 | Sep | Complete | N | N | 1 | |
CC006000000001816 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000023200 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000078579 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000141078 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000171780 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000171785 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000181977 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192124 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000196018 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000209524 | 2021 | Dec | Pending | N | N | 1 | ||||
Realgem Buildtech Private Limited Total | 57 | |||||||||
Renuka Realtors | P51900003058 | Konkan | Mumbai City | CC006000000079284 | 2019 | May | Complete | N | N | 1 |
CC006000000079383 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000161293 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000195122 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000197535 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197544 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
Renuka Realtors Total | 6 | |||||||||
Richa Housing Projects Private Ltd. | P51900012129 | Konkan | Mumbai City | CC006000000023137 | 2018 | Feb | Complete | N | N | 1 |
CC006000000192171 | 2020 | Jan | Complete | N | N | 1 | ||||
Richa Housing Projects Private Ltd. Total | 2 | |||||||||
RISHABH DEVELOPERS | P51900006519 | Konkan | Mumbai City | CC006000000197653 | 2021 | Jul | Hearing Schedule | N | N | 1 |
RISHABH DEVELOPERS Total | 1 | |||||||||
RISHIRAJ DEVELOPERS PRIVATE LIMITED | P51900002961 | Konkan | Mumbai City | CC006000000196969 | 2021 | May | Hearing Schedule | N | N | 1 |
RISHIRAJ DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
Rohan Developers Pvt Ltd | P51900005185 | Konkan | Mumbai City | CC006000000193041 | 2021 | Mar | Hearing Schedule | N | N | 1 |
Rohan Developers Pvt Ltd Total | 1 | |||||||||
Rohan Developers Pvt. Ltd. | P51900001725 | Konkan | Mumbai City | CC006000000012524 | 2017 | Dec | Complete | N | N | 1 |
CC006000000161273 | 2019 | Nov | Complete | N | N | 1 | ||||
P51900001899 | Konkan | Mumbai City | CC006000000023629 | 2018 | Apr | Complete | N | N | 1 | |
CC006000000023636 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023638 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023639 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023640 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000023641 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023644 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023646 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023648 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000023673 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023674 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023676 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023678 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000023681 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000023687 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023689 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000023690 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000023691 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044470 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000054720 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000054724 | 2018 | Jun | Complete | N | N | 1 | ||||
Rohan Developers Pvt. Ltd. Total | 23 | |||||||||
ROHINTON MEHTA BUILDERS AND DEVELOPERS | P51900009197 | Konkan | Mumbai City | CC006000000193134 | 2020 | Aug | Complete | Y | N | 1 |
ROHINTON MEHTA BUILDERS AND DEVELOPERS Total | 1 | |||||||||
Roxina Real Estate Pvt. Ltd. | P51900004172 | Konkan | Mumbai City | CC006000000161448 | 2019 | Nov | Complete | N | N | 1 |
CC006000000161457 | 2019 | Nov | Complete | N | N | 1 | ||||
Roxina Real Estate Pvt. Ltd. Total | 2 | |||||||||
RUBBERWALA REALTY | P51900010038 | Konkan | Mumbai City | CC006000000056401 | 2018 | Oct | Complete | N | N | 1 |
CC006000000056431 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056433 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056435 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056438 | 2018 | Oct | Complete | N | N | 1 | ||||
RUBBERWALA REALTY Total | 5 | |||||||||
RUNWAL DEVELOPERS PRIVATE LIMITED | P51900005685 | Konkan | Mumbai City | CC006000000195716 | 2021 | Jan | Pending | N | N | 1 |
CC006000000196389 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
RUNWAL DEVELOPERS PRIVATE LIMITED Total | 2 | |||||||||
RUNWAL DEVELOPERS PVT LTD | P51900000383 | Konkan | Mumbai City | CC006000000056528 | 2018 | Oct | Complete | Y | Y | 1 |
CC006000000089737 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000110747 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000161330 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000171534 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000197897 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198391 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198404 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000198673 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
P51900010100 | Konkan | Mumbai City | CC006000000141194 | 2019 | Oct | Complete | N | N | 1 | |
CC006000000195166 | 2020 | Dec | Complete | N | N | 1 | ||||
RUNWAL DEVELOPERS PVT LTD Total | 11 | |||||||||
Ruparel Estates India Pvt Ltd | P51900005988 | Konkan | Mumbai City | CC006000000012120 | 2017 | Dec | Complete | N | N | 1 |
CC006000000198241 | 2021 | Sep | Pending | N | N | 1 | ||||
Ruparel Estates India Pvt Ltd Total | 2 | |||||||||
Rupji Constructions | P51900007380 | Konkan | Mumbai City | CC006000000023547 | 2018 | Mar | Complete | Y | Y | 1 |
CC006000000055727 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055729 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055735 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055737 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055739 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055741 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055757 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055759 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055760 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055761 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055762 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055782 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055788 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055795 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055797 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055808 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055811 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055813 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055914 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000195278 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
P51900011305 | Konkan | Mumbai City | CC006000000001240 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000192907 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000198761 | 2021 | Nov | Pending | N | N | 1 | ||||
Rupji Constructions Total | 24 | |||||||||
S.B.BROTHERS DEVELOPERS | P51900008501 | Konkan | Mumbai City | CC006000000044400 | 2018 | Jun | Complete | N | N | 1 |
CC006000000056178 | 2018 | Sep | Complete | N | N | 1 | ||||
S.B.BROTHERS DEVELOPERS Total | 2 | |||||||||
S.S. ENTERPRISE | P51900005427 | Konkan | Mumbai City | CC006000000057738 | 2019 | Jan | Complete | Y | N | 1 |
CC006000000057744 | 2019 | Jan | Complete | Y | N | 1 | ||||
CC006000000197053 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
S.S. ENTERPRISE Total | 3 | |||||||||
Safal realtor and Developers Pvt Ltd | P51900005991 | Konkan | Mumbai City | CC006000000161244 | 2019 | Nov | Hearing Schedule | N | N | 1 |
Safal realtor and Developers Pvt Ltd Total | 1 | |||||||||
SAHANA-SHETH | P51900008720 | Konkan | Mumbai City | CC006000000000354 | 2017 | Sep | Complete | N | N | 1 |
SAHANA-SHETH Total | 1 | |||||||||
SAI CONSTRUCTION | P51900008102 | Konkan | Mumbai City | CC006000000195275 | 2020 | Dec | Hearing Schedule | N | N | 1 |
CC006000000197728 | 2021 | Jul | Pending | N | N | 1 | ||||
SAI CONSTRUCTION Total | 2 | |||||||||
SAI SADGURU DEVELOPERS | P51900020347 | Konkan | Mumbai City | CC006000000192296 | 2020 | Jan | Pending | N | N | 1 |
SAI SADGURU DEVELOPERS Total | 1 | |||||||||
SAMADHAN BANDOPANT CHANDANSHIVE | P51900007933 | Konkan | Mumbai City | CC006000000000438 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000451 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000023184 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000078895 | 2019 | Apr | Complete | N | N | 1 | ||||
SAMADHAN BANDOPANT CHANDANSHIVE Total | 4 | |||||||||
SAMPADA REALTORS | P51900004994 | Konkan | Mumbai City | CC006000000192564 | 2020 | Feb | Complete | N | N | 1 |
CC006000000195425 | 2020 | Dec | Complete | Y | N | 1 | ||||
CC006000000195426 | 2020 | Dec | Complete | Y | N | 1 | ||||
SAMPADA REALTORS Total | 3 | |||||||||
SANGHVI GRUHA NIRAMAN PRIVATE LIMITED | P51900009877 | Konkan | Mumbai City | CC006000000044131 | 2018 | Jun | Complete | N | N | 1 |
CC006000000056419 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000089656 | 2019 | Jun | Complete | Y | N | 1 | ||||
SANGHVI GRUHA NIRAMAN PRIVATE LIMITED Total | 3 | |||||||||
Sanghvi Premises Private Limited | P51900007455 | Konkan | Mumbai City | CC006000000209576 | 2022 | Jan | Pending | N | N | 1 |
Sanghvi Premises Private Limited Total | 1 | |||||||||
SANT SAGAR BUILDERS AND DEVELOPERS PRIVATE LIMITED | P51900014065 | Konkan | Mumbai City | CC006000000022897 | 2018 | Jan | Complete | N | N | 1 |
SANT SAGAR BUILDERS AND DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
Satellite Developers Private Limited | P51900005355 | Konkan | Mumbai City | CC006000000079408 | 2019 | May | Complete | N | N | 1 |
Satellite Developers Private Limited Total | 1 | |||||||||
Sayed Mohamed Zahid | P51900021839 | Konkan | Mumbai City | CC006000000195214 | 2020 | Dec | Hearing Schedule | N | N | 1 |
CC006000000209452 | 2022 | Jan | Pending | N | N | 1 | ||||
Sayed Mohamed Zahid Total | 2 | |||||||||
Sejal Shakti Realtors LLP | P51900021027 | Konkan | Mumbai City | CC006000000193494 | 2020 | Jul | Complete | N | N | 1 |
CC006000000196697 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
Sejal Shakti Realtors LLP Total | 2 | |||||||||
SHADAB ISLAM QURESHI | P51900009967 | Konkan | Mumbai City | CC006000000141108 | 2019 | Oct | Complete | N | N | 1 |
CC006000000196292 | 2021 | Aug | Pending | N | N | 1 | ||||
SHADAB ISLAM QURESHI Total | 2 | |||||||||
SHAKEEL AHMED MOHAMMED YUNUS | P51900005282 | Konkan | Mumbai City | CC006000000001658 | 2017 | Nov | Complete | N | N | 1 |
SHAKEEL AHMED MOHAMMED YUNUS Total | 1 | |||||||||
SHAUNAK DILIP KIRKIRE | P51900007903 | Konkan | Mumbai City | CC006000000012169 | 2017 | Dec | Complete | N | N | 1 |
CC006000000012636 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000078540 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000171895 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000195164 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
SHAUNAK DILIP KIRKIRE Total | 5 | |||||||||
SHINING SUN CONSTRUCTIONS | P51900013547 | Konkan | Mumbai City | CC006000000171787 | 2019 | Dec | Complete | N | N | 1 |
CC006000000195866 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
SHINING SUN CONSTRUCTIONS Total | 2 | |||||||||
SHISHIR MANGEH SHIVAPURKAR | P51900010851 | Konkan | Mumbai City | CC006000000000797 | 2017 | Nov | Complete | N | N | 1 |
SHISHIR MANGEH SHIVAPURKAR Total | 1 | |||||||||
SHIVOM CONSTRUCTIONS | P51900008899 | Konkan | Mumbai City | CC006000000056092 | 2018 | Sep | Complete | Y | N | 1 |
SHIVOM CONSTRUCTIONS Total | 1 | |||||||||
Shree Sadguru & Deluxe JV | P51900005370 | Konkan | Mumbai City | CC006000000089566 | 2019 | Jun | Hearing Schedule | N | N | 1 |
CC006000000197773 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197797 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
Shree Sadguru & Deluxe JV Total | 3 | |||||||||
SHREE SAI PARSHWA DEVELOPERS LLP | P51900013047 | Konkan | Mumbai City | CC006000000012680 | 2018 | Jan | Complete | N | N | 1 |
SHREE SAI PARSHWA DEVELOPERS LLP Total | 1 | |||||||||
SHREE SUKHAKARTA DEVELOPERS PVT.LTD. | P51900003250 | Konkan | Mumbai City | CC006000000054807 | 2018 | Jun | Complete | N | N | 1 |
CC006000000055883 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000056091 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000056540 | 2018 | Oct | Complete | Y | N | 1 | ||||
CC006000000089676 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089686 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089956 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100454 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110803 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000110805 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000161289 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000171501 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000192319 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192612 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192747 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193029 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193030 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000195542 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195686 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000196762 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000197616 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
P51900009080 | Konkan | Mumbai City | CC006000000192538 | 2020 | Feb | Complete | N | N | 1 | |
CC006000000195967 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196342 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000199127 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
P51900009359 | Konkan | Mumbai City | CC006000000192635 | 2020 | Feb | Pending | N | N | 1 | |
CC006000000195231 | 2020 | Dec | Pending | N | N | 1 | ||||
CC006000000196114 | 2021 | Mar | Pending | N | N | 1 | ||||
SHREE SUKHAKARTA DEVELOPERS PVT.LTD. Total | 28 | |||||||||
SHREEPATI BUILD INFRA INVESTMENT LIMITED | P51900010019 | Konkan | Mumbai City | CC006000000056636 | 2018 | Oct | Complete | N | N | 1 |
SHREEPATI BUILD INFRA INVESTMENT LIMITED Total | 1 | |||||||||
SHREEPATI CASTLE | P51900002235 | Konkan | Mumbai City | CC006000000000052 | 2017 | Aug | Complete | N | N | 1 |
CC006000000196220 | 2021 | Mar | Complete | N | N | 1 | ||||
SHREEPATI CASTLE Total | 2 | |||||||||
SHREEPATI JEWELS | P51900001201 | Konkan | Mumbai City | CC006000000056772 | 2018 | Oct | Complete | N | N | 1 |
CC006000000161392 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000193987 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
SHREEPATI JEWELS Total | 3 | |||||||||
SHREEPATI SKIES | P51900003092 | Konkan | Mumbai City | CC006000000056630 | 2018 | Oct | Complete | N | N | 1 |
SHREEPATI SKIES Total | 1 | |||||||||
Siddharth Developers | P51900001979 | Konkan | Mumbai City | CC006000000198958 | 2021 | Nov | Pending | N | N | 1 |
Siddharth Developers Total | 1 | |||||||||
SIDDHI RAJ HOUSING PROJECT PRIVATE LIMITED | P51900012374 | Konkan | Mumbai City | CC006000000012080 | 2017 | Nov | Complete | N | N | 1 |
CC006000000194840 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195045 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
SIDDHI RAJ HOUSING PROJECT PRIVATE LIMITED Total | 3 | |||||||||
SIDDHITECH DEVELOPERS PRIVATE LIMITED | P51900017229 | Konkan | Mumbai City | CC006000000056758 | 2018 | Oct | Complete | N | N | 1 |
SIDDHITECH DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
SIDDHIVINAYAK CONSTRUCTION PRIVATE LIMITED | P51900007574 | Konkan | Mumbai City | CC006000000089549 | 2019 | Jun | Complete | N | N | 1 |
CC006000000100358 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100371 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000181990 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000181994 | 2020 | Jun | Complete | Y | N | 1 | ||||
CC006000000181995 | 2020 | Jun | Complete | Y | N | 1 | ||||
CC006000000197876 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198891 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199045 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199046 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
SIDDHIVINAYAK CONSTRUCTION PRIVATE LIMITED Total | 10 | |||||||||
Skyline Developers | P51900008392 | Konkan | Mumbai City | CC006000000000748 | 2017 | Sep | Complete | N | N | 1 |
Skyline Developers Total | 1 | |||||||||
Snehalkumar Chandrakant Nadkarni | P51900005928 | Konkan | Mumbai City | CC006000000012023 | 2017 | Nov | Complete | N | N | 1 |
Snehalkumar Chandrakant Nadkarni Total | 1 | |||||||||
SO LUCKY BUILDERS | P51900006722 | Konkan | Mumbai City | CC006000000171769 | 2019 | Dec | Hearing Schedule | N | N | 1 |
SO LUCKY BUILDERS Total | 1 | |||||||||
SONA DEVELOPERS | P51900002210 | Konkan | Mumbai City | CC006000000193049 | 2020 | Mar | Complete | N | N | 1 |
SONA DEVELOPERS Total | 1 | |||||||||
SQ INFRASTRUCTURE PRIVATE LIMITED | P51900003947 | Konkan | Mumbai City | CC006000000001070 | 2017 | Oct | Complete | N | N | 1 |
CC006000000057931 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057934 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000079243 | 2019 | May | Complete | N | N | 1 | ||||
SQ INFRASTRUCTURE PRIVATE LIMITED Total | 4 | |||||||||
Sri Harsh Developers | P51900012304 | Konkan | Mumbai City | CC006000000012088 | 2017 | Nov | Complete | N | N | 1 |
CC006000000057385 | 2018 | Dec | Complete | Y | N | 1 | ||||
CC006000000110652 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000110653 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000110654 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000197069 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197070 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197072 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197082 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197084 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197085 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197883 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198267 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198362 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Sri Harsh Developers Total | 14 | |||||||||
SRK REAL HEIGHTS PRIVATE LIMITED | P51900010824 | Konkan | Mumbai City | CC006000000090003 | 2019 | Jul | Complete | N | N | 1 |
SRK REAL HEIGHTS PRIVATE LIMITED Total | 1 | |||||||||
Sugee Developers Pvt. Ltd. | P51900027433 | Konkan | Mumbai City | CC006000000209728 | 2022 | Jan | Pending | N | N | 1 |
Sugee Developers Pvt. Ltd. Total | 1 | |||||||||
SURAJ ESTATE DEVELOPERS PVT LTD | P51900003689 | Konkan | Mumbai City | CC006000000057349 | 2019 | Jan | Complete | N | N | 1 |
P51900004549 | Konkan | Mumbai City | CC006000000055383 | 2018 | Sep | Complete | N | N | 1 | |
P51900005428 | Konkan | Mumbai City | CC006000000023751 | 2018 | Mar | Complete | N | N | 1 | |
SURAJ ESTATE DEVELOPERS PVT LTD Total | 3 | |||||||||
Surana Developers (wadala) LLP | P51900008200 | Konkan | Mumbai City | CC006000000012309 | 2017 | Dec | Complete | N | N | 1 |
Surana Developers (wadala) LLP Total | 1 | |||||||||
Tamir Enterprises | P51900006756 | Konkan | Mumbai City | CC006000000171697 | 2019 | Nov | Complete | Y | N | 1 |
Tamir Enterprises Total | 1 | |||||||||
TANISHQ BUILDERS | P51900002127 | Konkan | Mumbai City | CC006000000089912 | 2019 | Jun | Complete | N | N | 1 |
TANISHQ BUILDERS Total | 1 | |||||||||
Tattva & Mittal Lifespaces Pvt Ltd | P51900008408 | Konkan | Mumbai City | CC006000000196931 | 2021 | May | Hearing Schedule | N | N | 1 |
CC006000000198556 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198603 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198604 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198605 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199160 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Tattva & Mittal Lifespaces Pvt Ltd Total | 6 | |||||||||
Tejaswini Homes Pvt.Ltd | P51900005855 | Konkan | Mumbai City | CC006000000057238 | 2019 | Jan | Complete | N | N | 1 |
Tejaswini Homes Pvt.Ltd Total | 1 | |||||||||
TENDULKAR & ASSOCIATES | P51900016881 | Konkan | Mumbai City | CC006000000195822 | 2021 | Feb | Hearing Schedule | N | N | 1 |
TENDULKAR & ASSOCIATES Total | 1 | |||||||||
Terrain Infrastructure Pvt. Ltd. | P51900009101 | Konkan | Mumbai City | CC006000000000577 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000584 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000633 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000757 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000810 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000812 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000012097 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012474 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000023155 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023185 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023286 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000195450 | 2020 | Dec | Complete | N | N | 1 | ||||
Terrain Infrastructure Pvt. Ltd. Total | 12 | |||||||||
The Bombay Dyeing and Manufacturing Company Limited | P51900008726 | Konkan | Mumbai City | CC006000000012638 | 2017 | Dec | Complete | Y | N | 1 |
CC006000000023427 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023507 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000044441 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054627 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054648 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055341 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055445 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055572 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055584 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055616 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055814 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055858 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055870 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055925 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055970 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056078 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056128 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056145 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056208 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056270 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056333 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056632 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056699 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056812 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000056902 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000057006 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057285 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057341 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057421 | 2018 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000057507 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057543 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057552 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057810 | 2019 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000057812 | 2019 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000068158 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068167 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000078170 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000078173 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000078177 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000078323 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078346 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000078351 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078362 | 2019 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000078409 | 2019 | Mar | Pending | N | N | 1 | ||||
CC006000000078417 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078418 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078463 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078474 | 2019 | Mar | Pending | N | N | 1 | ||||
CC006000000078478 | 2019 | Mar | Pending | N | N | 1 | ||||
CC006000000078481 | 2019 | Mar | Pending | N | N | 1 | ||||
CC006000000078508 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000078694 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078914 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079205 | 2019 | May | Pending | N | N | 1 | ||||
CC006000000079495 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079497 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079499 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079503 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079506 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079508 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079509 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079512 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089518 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089928 | 2019 | Jul | Pending | N | N | 1 | ||||
The Bombay Dyeing and Manufacturing Company Limited Total | 65 | |||||||||
Tridhaatu Builders LLP | P51900001764 | Konkan | Mumbai City | CC006000000194602 | 2020 | Oct | Complete | Y | N | 1 |
Tridhaatu Builders LLP Total | 1 | |||||||||
Tridhaatu Construction Private Limited | P51900009306 | Konkan | Mumbai City | CC006000000209869 | 2022 | Jan | Pending | N | N | 1 |
Tridhaatu Construction Private Limited Total | 1 | |||||||||
Twenty Five South Realty Limited | P51900011418 | Konkan | Mumbai City | CC006000000198331 | 2021 | Sep | Hearing Schedule | N | N | 1 |
CC006000000198332 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198333 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Twenty Five South Realty Limited Total | 3 | |||||||||
UNITED SHELTERS PRIVATE LIMITED | P51900011937 | Konkan | Mumbai City | CC006000000001709 | 2017 | Nov | Complete | N | N | 1 |
CC006000000001798 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012386 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000057350 | 2018 | Dec | Complete | N | N | 1 | ||||
UNITED SHELTERS PRIVATE LIMITED Total | 4 | |||||||||
UNITEX | P51900011161 | Konkan | Mumbai City | CC006000000023559 | 2018 | Mar | Complete | N | N | 1 |
UNITEX Total | 1 | |||||||||
UNIVERSAL BUILDERS & DEVELOPERS | P51900002907 | Konkan | Mumbai City | CC006000000100429 | 2019 | Aug | Complete | N | N | 1 |
UNIVERSAL BUILDERS & DEVELOPERS Total | 1 | |||||||||
VARDHMAN DEVELOPERS LTD | P51900008829 | Konkan | Mumbai City | CC006000000196105 | 2021 | Feb | Hearing Schedule | N | N | 1 |
CC006000000196106 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196107 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
VARDHMAN DEVELOPERS LTD Total | 3 | |||||||||
VERSALTILE BUILDCON PVT. LTD. | P51900003302 | Konkan | Mumbai City | CC006000000110811 | 2019 | Sep | Complete | Y | N | 1 |
CC006000000197565 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
VERSALTILE BUILDCON PVT. LTD. Total | 2 | |||||||||
Vijaya Residency | P51900005842 | Konkan | Mumbai City | CC006000000193526 | 2020 | Jul | Pending | N | N | 1 |
Vijaya Residency Total | 1 | |||||||||
WESTIN DEVELOPERS PVT. LTD | P51900005532 | Konkan | Mumbai City | CC006000000055979 | 2018 | Aug | Complete | N | N | 1 |
CC006000000198760 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
P51900005835 | Konkan | Mumbai City | CC006000000044374 | 2018 | May | Complete | Y | N | 1 | |
CC006000000100255 | 2019 | Jul | Complete | N | N | 1 | ||||
P51900005974 | Konkan | Mumbai City | CC006000000100585 | 2019 | Sep | Complete | N | N | 1 | |
P51900007702 | Konkan | Mumbai City | CC006000000001660 | 2017 | Nov | Complete | N | N | 1 | |
WESTIN DEVELOPERS PVT. LTD Total | 6 | |||||||||
Wondervalue Realty Developers Pvt. Ltd. | P51900009720 | Konkan | Mumbai City | CC006000000012310 | 2017 | Dec | Complete | N | N | 1 |
CC006000000044115 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000056900 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000193003 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196483 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000197118 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197120 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197121 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197142 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197143 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197211 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198401 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198502 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198503 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000209763 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
Wondervalue Realty Developers Pvt. Ltd. Total | 15 | |||||||||
Y H ASSOICATES | P51900007987 | Konkan | Mumbai City | CC006000000199324 | 2021 | Dec | Hearing Schedule | N | N | 1 |
Y H ASSOICATES Total | 1 | |||||||||
ZOEB ENTERPRISES | P51900023852 | Konkan | Mumbai City | CC006000000192528 | 2020 | Feb | Complete | N | N | 1 |
ZOEB ENTERPRISES Total | 1 | |||||||||
Grand Total | 1011 |
Name of Promoter | Project No. | Division | District | Complaint number | Year of Complaint Filing | Month of Complaint Filing | Complaint Status | Applied for Non-Execution (Y/N) |
Non Execution Order Uploaded (Y/N) |
Total |
---|---|---|---|---|---|---|---|---|---|---|
A A Estates Pvt Ltd | P51800004643 | Konkan | Mumbai Suburban | CC006000000000268 | 2018 | Feb | Complete | N | N | 1 |
CC006000000055294 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000078291 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000079039 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079044 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089660 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100354 | 2019 | Sep | Complete | N | N | 1 | ||||
P51800004918 | Konkan | Mumbai Suburban | CC006000000054819 | 2018 | Jun | Complete | N | N | 1 | |
P51800005826 | Konkan | Mumbai Suburban | CC006000000044525 | 2018 | May | Complete | N | N | 1 | |
CC006000000044526 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054635 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054639 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054680 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000054699 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000054775 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054799 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054896 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054909 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054992 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000055088 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000055099 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055102 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055105 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055109 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055123 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000055158 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055172 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055174 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055176 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055182 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055288 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055292 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055358 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055360 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055361 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055489 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055509 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055523 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055633 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055674 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055801 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055942 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055946 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000056144 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000056180 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056181 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000057356 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078870 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000194258 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194394 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194622 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000194636 | 2020 | Nov | Pending | N | N | 1 | ||||
A A Estates Pvt Ltd Total | 52 | |||||||||
AADI PROPERTIES LLP | P51800008521 | Konkan | Mumbai Suburban | CC006000000058106 | 2019 | Feb | Complete | N | N | 1 |
CC006000000078820 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089694 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000192196 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000194362 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194731 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194732 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000197690 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000198521 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
AADI PROPERTIES LLP Total | 9 | |||||||||
AAKAR CONSTRUCTIONS | P51800003282 | Konkan | Mumbai Suburban | CC006000000055478 | 2018 | Jul | Complete | N | N | 1 |
AAKAR CONSTRUCTIONS Total | 1 | |||||||||
AAP Realtors Ltd. | P51800004278 | Konkan | Mumbai Suburban | CC006000000000924 | 2017 | Sep | Complete | N | N | 1 |
CC006000000022984 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000055694 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000056686 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000197298 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197373 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197435 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000198308 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198309 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
AAP Realtors Ltd. Total | 9 | |||||||||
Aaryadeep Builders & Developers | P51700006499 | Konkan | Mumbai Suburban | CC006000000056559 | 2018 | Oct | Complete | Y | N | 1 |
CC006000000057863 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000194964 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194972 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195667 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195730 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
Aaryadeep Builders & Developers Total | 6 | |||||||||
Aayush Developers | P51800002056 | Konkan | Mumbai Suburban | CC006000000195915 | 2021 | Feb | Hearing Schedule | N | N | 1 |
Aayush Developers Total | 1 | |||||||||
ABHIGNA ENTERPRISES | P51800007245 | Konkan | Mumbai Suburban | CC006000000198858 | 2021 | Oct | Pending | N | N | 1 |
ABHIGNA ENTERPRISES Total | 1 | |||||||||
ABHIJEET MADHUKAR KADAM | P51800009817 | Konkan | Mumbai Suburban | CC006000000199092 | 2021 | Nov | Hearing Schedule | N | N | 1 |
ABHIJEET MADHUKAR KADAM Total | 1 | |||||||||
Accanoor Associates | P51800007994 | Konkan | Mumbai Suburban | CC006000000197989 | 2021 | Aug | Pending | N | N | 1 |
Accanoor Associates Total | 1 | |||||||||
Accord Builders | P51800005985 | Konkan | Mumbai Suburban | CC006000000000440 | 2017 | Sep | Complete | N | N | 1 |
CC006000000012448 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000044212 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044213 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044214 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044215 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000055024 | 2018 | Jun | Complete | N | N | 1 | ||||
P51800009440 | Konkan | Mumbai Suburban | CC006000000022809 | 2018 | Jan | Complete | Y | N | 1 | |
CC006000000056645 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000089889 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089989 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000100402 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000100484 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000110774 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000110865 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000161299 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000193560 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193766 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000193786 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000194759 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000194887 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195808 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000195983 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196143 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196988 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
Accord Builders Total | 25 | |||||||||
Acme Avenue Infrastructure Pvt. Ltd. | P51800000777 | Konkan | Mumbai Suburban | CC006000000120986 | 2019 | Sep | Hearing Schedule | N | N | 1 |
CC006000000161246 | 2019 | Oct | Complete | N | N | 1 | ||||
Acme Avenue Infrastructure Pvt. Ltd. Total | 2 | |||||||||
Acme Housing India Private Limited | P51800001238 | Konkan | Mumbai Suburban | CC006000000055022 | 2018 | Jun | Complete | N | N | 1 |
CC006000000056713 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056734 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056770 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000057410 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000058121 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000089896 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000110779 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141017 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000192948 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192949 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192952 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192954 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192956 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193427 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000195340 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000197071 | 2021 | May | Complete | N | N | 1 | ||||
CC006000000209421 | 2021 | Dec | Pending | N | N | 1 | ||||
Acme Housing India Private Limited Total | 18 | |||||||||
Acme Realties Private Limited | P51800001690 | Konkan | Mumbai Suburban | CC006000000195224 | 2020 | Dec | Pending | N | N | 1 |
CC006000000196123 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000198314 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000198343 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
P51800002133 | Konkan | Mumbai Suburban | CC006000000012454 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000089917 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000197220 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197259 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000198174 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198379 | 2021 | Sep | Pending | N | N | 1 | ||||
Acme Realties Private Limited Total | 10 | |||||||||
ADANI ESTATES PRIVATE LIMITED | P51800001290 | Konkan | Mumbai Suburban | CC006000000000262 | 2017 | Aug | Complete | N | N | 1 |
CC006000000055117 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055187 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055189 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055198 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055212 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055257 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055260 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055265 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055272 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055286 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055301 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055479 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056094 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056395 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056408 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056865 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057368 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000089768 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000195776 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000196252 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196357 | 2021 | Mar | Complete | N | N | 1 | ||||
ADANI ESTATES PRIVATE LIMITED Total | 22 | |||||||||
ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED | P51800005832 | Konkan | Mumbai Suburban | CC006000000055134 | 2018 | Jun | Complete | N | N | 1 |
CC006000000055215 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055227 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055926 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000056307 | 2018 | Oct | Complete | Y | N | 1 | ||||
CC006000000057084 | 2018 | Nov | Complete | Y | N | 1 | ||||
CC006000000110795 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000197489 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED Total | 8 | |||||||||
ADCON INFRASTRUCTURE | P51800012085 | Konkan | Mumbai Suburban | CC006000000012457 | 2018 | Jan | Complete | Y | Y | 1 |
ADCON INFRASTRUCTURE Total | 1 | |||||||||
ADINATH ENTERPRISE | P51800003448 | Konkan | Mumbai Suburban | CC006000000055778 | 2018 | Aug | Complete | Y | Y | 1 |
ADINATH ENTERPRISE Total | 1 | |||||||||
ADITYA DEVELOPERS | P51800007177 | Konkan | Mumbai Suburban | CC006000000089778 | 2019 | Jun | Hearing Schedule | N | N | 1 |
CC006000000089823 | 2019 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000089865 | 2019 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000090145 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000100508 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000209523 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209531 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209533 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209534 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209564 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209802 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209803 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209805 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209806 | 2022 | Jan | Pending | N | N | 1 | ||||
P51800007179 | Konkan | Mumbai Suburban | CC006000000056526 | 2018 | Oct | Complete | N | N | 1 | |
CC006000000056529 | 2018 | Oct | Complete | N | N | 1 | ||||
P51800007224 | Konkan | Mumbai Suburban | CC006000000198716 | 2021 | Oct | Pending | N | N | 1 | |
CC006000000198717 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000198718 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198719 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198720 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000199288 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000199289 | 2021 | Dec | Pending | N | N | 1 | ||||
P51800007225 | Konkan | Mumbai Suburban | CC006000000171635 | 2019 | Nov | Hearing Schedule | N | N | 1 | |
CC006000000171919 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195460 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
P51800007227 | Konkan | Mumbai Suburban | CC006000000194341 | 2020 | Oct | Pending | N | N | 1 | |
P51800007346 | Konkan | Mumbai Suburban | CC006000000055235 | 2018 | Jul | Complete | N | N | 1 | |
CC006000000056184 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000056188 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000056189 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000056210 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056220 | 2018 | Sep | Complete | N | N | 1 | ||||
P51800009323 | Konkan | Mumbai Suburban | CC006000000193072 | 2020 | Mar | Hearing Schedule | N | N | 1 | |
ADITYA DEVELOPERS Total | 34 | |||||||||
Aditya Enterprise | P51800004821 | Konkan | Mumbai Suburban | CC006000000141118 | 2019 | Oct | Complete | N | N | 1 |
Aditya Enterprise Total | 1 | |||||||||
ADITYA ENTERPRISES | P51800009006 | Konkan | Mumbai Suburban | CC006000000001580 | 2017 | Oct | Complete | N | N | 1 |
CC006000000023311 | 2018 | Feb | Complete | Y | Y | 1 | ||||
P51800013097 | Konkan | Mumbai Suburban | CC006000000056485 | 2018 | Oct | Complete | N | N | 1 | |
ADITYA ENTERPRISES Total | 3 | |||||||||
Admire Revive Builder & Developer | P51800002086 | Konkan | Mumbai Suburban | CC006000000022866 | 2018 | Aug | Complete | N | N | 1 |
CC006000000056257 | 2018 | Sep | Complete | Y | N | 1 | ||||
Admire Revive Builder & Developer Total | 2 | |||||||||
ADVENT DEVELOPERS PRIVATE LIMITED | P51800002649 | Konkan | Mumbai Suburban | CC006000000192125 | 2020 | Feb | Complete | N | N | 1 |
ADVENT DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
AHIMSA BUILDER | P51800007486 | Konkan | Mumbai Suburban | CC006000000023643 | 2018 | May | Complete | N | N | 1 |
CC006000000057755 | 2019 | Jan | Complete | N | N | 1 | ||||
AHIMSA BUILDER Total | 2 | |||||||||
AIBANI ENTERPRISE | P51800009415 | Konkan | Mumbai Suburban | CC006000000022885 | 2018 | Feb | Complete | N | N | 1 |
CC006000000022927 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000022929 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000022949 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000022950 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000090169 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000100184 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000193089 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193090 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193091 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193092 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193093 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193094 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193095 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193096 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193097 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193098 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193099 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193104 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193105 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193106 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193107 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193109 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193110 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193119 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193121 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193122 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193123 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193124 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193125 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
AIBANI ENTERPRISE Total | 30 | |||||||||
Aishwarya Avant Builders LLP | P51800009299 | Konkan | Mumbai Suburban | CC006000000057111 | 2019 | Jan | Complete | N | N | 1 |
CC006000000078221 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000079406 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089666 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000090049 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000110796 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000110862 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000161270 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000171946 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000194255 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195467 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195761 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000196933 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197316 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
P51800015537 | Konkan | Mumbai Suburban | CC006000000171648 | 2019 | Nov | Complete | N | N | 1 | |
CC006000000192629 | 2020 | Feb | Pending | N | N | 1 | ||||
Aishwarya Avant Builders LLP Total | 16 | |||||||||
AISHWARYA LIGHT CONSTRUCTION COMPANY | P51800006084 | Konkan | Mumbai Suburban | CC006000000141152 | 2019 | Oct | Complete | N | N | 1 |
AISHWARYA LIGHT CONSTRUCTION COMPANY Total | 1 | |||||||||
AJANTA AIRAVAT INFRASTRUCTURE LIMITED LIABILITY PARTNERSHIP | P51800013296 | Konkan | Mumbai Suburban | CC006000000012116 | 2017 | Dec | Complete | N | N | 1 |
CC006000000023950 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000044182 | 2018 | Apr | Complete | Y | N | 1 | ||||
CC006000000192876 | 2020 | Apr | Complete | N | N | 1 | ||||
CC006000000195489 | 2021 | Jan | Complete | N | N | 1 | ||||
AJANTA AIRAVAT INFRASTRUCTURE LIMITED LIABILITY PARTNERSHIP Total | 5 | |||||||||
Ajanta Karmvir Constructions LLP | P51800005894 | Konkan | Mumbai Suburban | CC006000000100617 | 2019 | Aug | Complete | Y | N | 1 |
Ajanta Karmvir Constructions LLP Total | 1 | |||||||||
AJAY SITARAM SURVE | P51800013678 | Konkan | Mumbai Suburban | CC006000000057625 | 2019 | Jan | Complete | N | N | 1 |
CC006000000193334 | 2020 | Jun | Complete | N | N | 1 | ||||
AJAY SITARAM SURVE Total | 2 | |||||||||
Ajmera Realty & Infra India Ltd. | P51800000776 | Konkan | Mumbai Suburban | CC006000000089828 | 2019 | Jun | Complete | N | N | 1 |
CC006000000198058 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Ajmera Realty & Infra India Ltd. Total | 2 | |||||||||
Akar Creations Private Limited | P51800010382 | Konkan | Mumbai Suburban | CC006000000171727 | 2019 | Nov | Complete | N | N | 1 |
Akar Creations Private Limited Total | 1 | |||||||||
Akruti GM Joint Venture | P51800009175 | Konkan | Mumbai Suburban | CC006000000055382 | 2018 | Jul | Complete | N | N | 1 |
CC006000000057122 | 2018 | Dec | Complete | N | N | 1 | ||||
Akruti GM Joint Venture Total | 2 | |||||||||
AKSHAY GRUHPRAVESH LLP | P51800000487 | Konkan | Mumbai Suburban | CC006000000054818 | 2018 | Jun | Complete | N | N | 1 |
AKSHAY GRUHPRAVESH LLP Total | 1 | |||||||||
Akshay Sthapatya H.S.A. | P51800004991 | Konkan | Mumbai Suburban | CC006000000000717 | 2017 | Sep | Complete | Y | Y | 1 |
CC006000000001392 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000057525 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078911 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079022 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000141113 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000195936 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000198482 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Akshay Sthapatya H.S.A. Total | 8 | |||||||||
ALTAA BUIILDERS | P51800010872 | Konkan | Mumbai Suburban | CC006000000057643 | 2019 | Jan | Hearing Schedule | N | N | 1 |
CC006000000209621 | 2022 | Jan | Pending | N | N | 1 | ||||
ALTAA BUIILDERS Total | 2 | |||||||||
AMAR ENTERPRISES | P51800011527 | Konkan | Mumbai Suburban | CC006000000057022 | 2018 | Nov | Complete | N | N | 1 |
AMAR ENTERPRISES Total | 1 | |||||||||
AMARDEEP CONSTRUCTIONS | P51800006653 | Konkan | Mumbai Suburban | CC006000000193396 | 2020 | Jul | Complete | Y | N | 1 |
CC006000000193397 | 2020 | Jul | Complete | Y | N | 1 | ||||
CC006000000198895 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198896 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198898 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198899 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198906 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198908 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198909 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198924 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198925 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198927 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198928 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198933 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198934 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198935 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198937 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
AMARDEEP CONSTRUCTIONS Total | 17 | |||||||||
AMAZON MANA & ASSOCIATES AOP | P51800006074 | Konkan | Mumbai Suburban | CC006000000058079 | 2019 | Feb | Complete | N | N | 1 |
CC006000000192881 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000194417 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000196385 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
AMAZON MANA & ASSOCIATES AOP Total | 4 | |||||||||
Anaya Infrastructure Pvt. Ltd. | P51800001504 | Konkan | Mumbai Suburban | CC006000000001393 | 2017 | Dec | Complete | N | N | 1 |
Anaya Infrastructure Pvt. Ltd. Total | 1 | |||||||||
ANGEL CONSTRUCTION COMPANY | P51800032085 | Konkan | Mumbai Suburban | CC006000000209481 | 2021 | Dec | Hearing Schedule | N | N | 1 |
ANGEL CONSTRUCTION COMPANY Total | 1 | |||||||||
ANI ANU DEVELOPERS PRIVATE LIMITED | P51800006089 | Konkan | Mumbai Suburban | CC006000000193650 | 2020 | Aug | Hearing Schedule | N | N | 1 |
ANI ANU DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
Anil Arora | P51800005593 | Konkan | Mumbai Suburban | CC006000000193680 | 2020 | Aug | Hearing Schedule | N | N | 1 |
Anil Arora Total | 1 | |||||||||
Aniline Properties Private Limited | P51800003202 | Konkan | Mumbai Suburban | CC006000000055935 | 2018 | Sep | Complete | N | N | 1 |
CC006000000057949 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000079185 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079187 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000141104 | 2019 | Oct | Complete | N | N | 1 | ||||
Aniline Properties Private Limited Total | 5 | |||||||||
Anis Yakub Khan | P51800005115 | Konkan | Mumbai Suburban | CC006000000001609 | 2018 | Jan | Complete | Y | Y | 1 |
CC006000000090128 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000090129 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000090131 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000090132 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000090133 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000090137 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000090143 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000090147 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000110724 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000193241 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195879 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195880 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195883 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195885 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195889 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195893 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000196772 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
Anis Yakub Khan Total | 18 | |||||||||
Ankit Overseas | P51800002495 | Konkan | Mumbai Suburban | CC006000000078871 | 2019 | Apr | Complete | N | N | 1 |
Ankit Overseas Total | 1 | |||||||||
ANKUR SHUBHAM DEVELOPERS | P51800006885 | Konkan | Mumbai Suburban | CC006000000057766 | 2019 | Jan | Complete | N | N | 1 |
ANKUR SHUBHAM DEVELOPERS Total | 1 | |||||||||
ANMOL ALLIANCE | P51800004209 | Konkan | Mumbai Suburban | CC006000000023100 | 2018 | Jan | Complete | N | N | 1 |
CC006000000044442 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000090029 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090030 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090031 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090032 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090033 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090034 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090035 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090036 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000110662 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000161276 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000181966 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000193667 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000198473 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198474 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198475 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198478 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198479 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198509 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198510 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198522 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
ANMOL ALLIANCE Total | 22 | |||||||||
Antariksh Infraprojects LLP | P51800000903 | Konkan | Mumbai Suburban | CC006000000089616 | 2019 | Jun | Complete | N | N | 1 |
Antariksh Infraprojects LLP Total | 1 | |||||||||
Anubhav Anilkumar Aggarwal | P51800005383 | Konkan | Mumbai Suburban | CC006000000078389 | 2019 | Mar | Complete | N | N | 1 |
Anubhav Anilkumar Aggarwal Total | 1 | |||||||||
Anuradha Real Estate Developers Pvt Ltd | P51800011594 | Konkan | Mumbai Suburban | CC006000000001941 | 2017 | Nov | Complete | N | N | 1 |
CC006000000197147 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197225 | 2021 | Jun | Pending | N | N | 1 | ||||
Anuradha Real Estate Developers Pvt Ltd Total | 3 | |||||||||
ANUSHKA DEVELOPERS | P51800020573 | Konkan | Mumbai Suburban | CC006000000196720 | 2021 | Apr | Hearing Schedule | N | N | 1 |
ANUSHKA DEVELOPERS Total | 1 | |||||||||
ANUSMERA REALTY & INFRA PRIVATE LIMITED | P51800002260 | Konkan | Mumbai Suburban | CC006000000197013 | 2021 | May | Hearing Schedule | N | N | 1 |
ANUSMERA REALTY & INFRA PRIVATE LIMITED Total | 1 | |||||||||
APCON CONSTRUCTION COMPANY | P51800015420 | Konkan | Mumbai Suburban | CC006000000023708 | 2018 | Mar | Complete | N | N | 1 |
CC006000000195496 | 2021 | Jan | Complete | Y | N | 1 | ||||
APCON CONSTRUCTION COMPANY Total | 2 | |||||||||
APT REALCON | P51800006899 | Konkan | Mumbai Suburban | CC006000000055980 | 2018 | Aug | Complete | Y | Y | 1 |
CC006000000055981 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056017 | 2018 | Aug | Complete | Y | Y | 1 | ||||
APT REALCON Total | 3 | |||||||||
ARHAM ENGINEERS | P51800005828 | Konkan | Mumbai Suburban | CC006000000012207 | 2018 | Nov | Complete | N | N | 1 |
CC006000000056834 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057219 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057786 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000100437 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000171548 | 2019 | Nov | Complete | N | N | 1 | ||||
ARHAM ENGINEERS Total | 6 | |||||||||
ARIHANT ASSOCIATES | P51800005015 | Konkan | Mumbai Suburban | CC006000000055576 | 2018 | Aug | Complete | Y | N | 1 |
CC006000000055577 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055578 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055579 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055623 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055625 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000171494 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171518 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171520 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171521 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000181956 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192134 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
ARIHANT ASSOCIATES Total | 12 | |||||||||
ARIHANT INFRASTRUCTURE COMPANY | P51800008281 | Konkan | Mumbai Suburban | CC006000000195570 | 2021 | Jan | Hearing Schedule | N | N | 1 |
CC006000000198917 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
ARIHANT INFRASTRUCTURE COMPANY Total | 2 | |||||||||
ARIHANT REALTORS | P51800011649 | Konkan | Mumbai Suburban | CC006000000197543 | 2021 | Jul | Hearing Schedule | N | N | 1 |
ARIHANT REALTORS Total | 1 | |||||||||
ARIISTO DEVELOPERS PRIVATE LIMITED | P51800002847 | Konkan | Mumbai Suburban | CC006000000000982 | 2017 | Oct | Complete | N | N | 1 |
CC006000000022976 | 2018 | Jan | Complete | Y | N | 1 | ||||
CC006000000078534 | 2019 | Mar | Complete | N | N | 1 | ||||
P51800005285 | Konkan | Mumbai Suburban | CC006000000001668 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000022887 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000044438 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054900 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000056109 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056239 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000057275 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078495 | 2019 | Mar | Complete | N | N | 1 | ||||
ARIISTO DEVELOPERS PRIVATE LIMITED Total | 11 | |||||||||
ARISTOCRAT REALTY PVT LTD | P51800005783 | Konkan | Mumbai Suburban | CC006000000194206 | 2020 | Oct | Hearing Schedule | N | N | 1 |
ARISTOCRAT REALTY PVT LTD Total | 1 | |||||||||
ARJUN ANANT WAGHMARE | P51800004827 | Konkan | Mumbai Suburban | CC006000000057487 | 2018 | Dec | Complete | N | N | 1 |
CC006000000198352 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000209593 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
ARJUN ANANT WAGHMARE Total | 3 | |||||||||
Arkade Developers Private Limited | P51800004750 | Konkan | Mumbai Suburban | CC006000000079094 | 2019 | May | Complete | N | N | 1 |
P51800014422 | Konkan | Mumbai Suburban | CC006000000195656 | 2021 | Jan | Pending | N | N | 1 | |
CC006000000198558 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000209425 | 2021 | Dec | Pending | N | N | 1 | ||||
Arkade Developers Private Limited Total | 4 | |||||||||
ARYAMAN INFRATECH INDIA PVT LTD | P51800009494 | Konkan | Mumbai Suburban | CC006000000056318 | 2018 | Sep | Complete | N | N | 1 |
P51800012284 | Konkan | Mumbai Suburban | CC006000000000430 | 2017 | Sep | Complete | N | N | 1 | |
CC006000000056574 | 2018 | Oct | Complete | Y | Y | 1 | ||||
ARYAMAN INFRATECH INDIA PVT LTD Total | 3 | |||||||||
ASHAPURA DEVELOPERS | P51800007105 | Konkan | Mumbai Suburban | CC006000000110784 | 2019 | Oct | Complete | N | N | 1 |
ASHAPURA DEVELOPERS Total | 1 | |||||||||
ASHAPURA HOMES PRIVATE LIMITED | P51800005944 | Konkan | Mumbai Suburban | CC006000000195103 | 2020 | Dec | Pending | N | N | 1 |
CC006000000198329 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
ASHAPURA HOMES PRIVATE LIMITED Total | 2 | |||||||||
ASHAPURA HOUSING PRIVATE LIMITED | P51800005475 | Konkan | Mumbai Suburban | CC006000000057431 | 2018 | Dec | Complete | N | N | 1 |
CC006000000078250 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000193264 | 2020 | Jun | Complete | N | N | 1 | ||||
CC006000000193740 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193743 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193744 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193746 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193748 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193749 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193799 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193800 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193801 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193833 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000195805 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000196051 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000197050 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197424 | 2021 | Jun | Pending | N | N | 1 | ||||
CC006000000197987 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198833 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199084 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
ASHAPURA HOUSING PRIVATE LIMITED Total | 20 | |||||||||
Ashok Rajaram Gupta | P51800010062 | Konkan | Mumbai Suburban | CC006000000012333 | 2020 | Feb | Complete | N | N | 1 |
CC006000000012336 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000012643 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000044001 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000054848 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000058070 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078262 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078263 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078586 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078795 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078883 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079065 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079075 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000079157 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089707 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000090096 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000090100 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000090103 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000090105 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000090126 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100444 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100473 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100475 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000120987 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000171498 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171515 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171516 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171582 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171590 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171676 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171711 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171840 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192127 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192143 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192163 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192164 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192166 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192167 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192169 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192177 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192179 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192180 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192182 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192185 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192186 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192189 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192190 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192745 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192847 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192848 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192849 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192851 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192852 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192853 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192854 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192857 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192858 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192870 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192871 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192872 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192873 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192874 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192875 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192877 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192878 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192879 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192906 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192910 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192911 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192913 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193379 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000196344 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000197785 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198396 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Ashok Rajaram Gupta Total | 74 | |||||||||
Ashoka Developers | P51800005798 | Konkan | Mumbai Suburban | CC006000000056129 | 2018 | Sep | Complete | N | N | 1 |
CC006000000089526 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000182010 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000182022 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192521 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000193161 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195301 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000197578 | 2021 | Jul | Complete | N | N | 1 | ||||
CC006000000198901 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Ashoka Developers Total | 9 | |||||||||
ASHVI DEVELOPERS PRIVATE LIMITED | P51800009848 | Konkan | Mumbai Suburban | CC006000000056158 | 2018 | Sep | Complete | N | N | 1 |
CC006000000057811 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078962 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078963 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078966 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078967 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079042 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089922 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000110623 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000141123 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000192131 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192376 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000195175 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196949 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
ASHVI DEVELOPERS PRIVATE LIMITED Total | 14 | |||||||||
ASHWAMEDH BUILDERS AND DEVELOPERS MUMBAI | P51800005636 | Konkan | Mumbai Suburban | CC006000000054570 | 2018 | May | Complete | Y | Y | 1 |
ASHWAMEDH BUILDERS AND DEVELOPERS MUMBAI Total | 1 | |||||||||
ASHWINI AJIT KARANDIKAR | P51800005872 | Konkan | Mumbai Suburban | CC006000000195352 | 2020 | Dec | Pending | N | N | 1 |
ASHWINI AJIT KARANDIKAR Total | 1 | |||||||||
ASPY PHIROZE CAPTAIN | P51800006599 | Konkan | Mumbai Suburban | CC006000000056242 | 2018 | Sep | Complete | Y | N | 1 |
CC006000000057544 | 2019 | Jan | Complete | Y | N | 1 | ||||
ASPY PHIROZE CAPTAIN Total | 2 | |||||||||
ATHARVA DEVELOPERS | P51800007651 | Konkan | Mumbai Suburban | CC006000000078653 | 2019 | Apr | Complete | N | N | 1 |
ATHARVA DEVELOPERS Total | 1 | |||||||||
Atharva Realtors | P51800012451 | Konkan | Mumbai Suburban | CC006000000054809 | 2018 | Jun | Complete | Y | Y | 1 |
Atharva Realtors Total | 1 | |||||||||
ATLANTA ASSOCIATES | P51800003044 | Konkan | Mumbai Suburban | CC006000000000348 | 2017 | Sep | Complete | N | N | 1 |
CC006000000001874 | 2017 | Dec | Complete | N | N | 1 | ||||
ATLANTA ASSOCIATES Total | 2 | |||||||||
Atmosphere Realty Pvt Ltd | P51800001243 | Konkan | Mumbai Suburban | CC006000000001047 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001779 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000044486 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000057413 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000089949 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100282 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000193495 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
P51800019950 | Konkan | Mumbai Suburban | CC006000000196482 | 2021 | Mar | Hearing Schedule | N | N | 1 | |
Atmosphere Realty Pvt Ltd Total | 8 | |||||||||
ATUL CORPORATES | P51800006783 | Konkan | Mumbai Suburban | CC006000000023720 | 2018 | Apr | Complete | N | N | 1 |
ATUL CORPORATES Total | 1 | |||||||||
ATUL PROJECTS INDIA PRIVATE LIMITED | P51800010900 | Konkan | Mumbai Suburban | CC006000000078758 | 2019 | Apr | Complete | N | N | 1 |
ATUL PROJECTS INDIA PRIVATE LIMITED Total | 1 | |||||||||
Avant Jakhar Natural Resources LLP | P51800022151 | Konkan | Mumbai Suburban | CC006000000196251 | 2021 | Mar | Hearing Schedule | N | N | 1 |
Avant Jakhar Natural Resources LLP Total | 1 | |||||||||
Avi Housing | P51800012724 | Konkan | Mumbai Suburban | CC006000000195782 | 2021 | Jan | Pending | N | N | 1 |
CC006000000197753 | 2021 | Jul | Complete | N | N | 1 | ||||
Avi Housing Total | 2 | |||||||||
AVIATION HOTELS PVT. LTD. | P51800005153 | Konkan | Mumbai Suburban | CC006000000058101 | 2019 | Feb | Complete | Y | Y | 1 |
CC006000000195468 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000195469 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000195720 | 2021 | Feb | Complete | Y | N | 1 | ||||
CC006000000196431 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000198734 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000209727 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
AVIATION HOTELS PVT. LTD. Total | 7 | |||||||||
Axiom Realty Pvt ltd | P51800012463 | Konkan | Mumbai Suburban | CC006000000197903 | 2021 | Aug | Pending | N | N | 1 |
CC006000000198376 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198378 | 2021 | Sep | Pending | N | N | 1 | ||||
Axiom Realty Pvt ltd Total | 3 | |||||||||
AYODHYA CONSTRUCTION CO | P51800007485 | Konkan | Mumbai Suburban | CC006000000001708 | 2017 | Nov | Complete | N | N | 1 |
CC006000000056871 | 2018 | Nov | Complete | Y | N | 1 | ||||
CC006000000078628 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079066 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
AYODHYA CONSTRUCTION CO Total | 4 | |||||||||
AYYAPPA DEVELOPERS PVT. LTD. | P51800005812 | Konkan | Mumbai Suburban | CC006000000055374 | 2018 | Jul | Complete | Y | Y | 1 |
CC006000000055386 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055607 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000057933 | 2019 | Feb | Complete | Y | Y | 1 | ||||
CC006000000089827 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000161442 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000161443 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000196398 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196450 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196453 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
AYYAPPA DEVELOPERS PVT. LTD. Total | 10 | |||||||||
BAJAJ INTERNATIONAL REALTY PRIVATE LIMITED | P51800012464 | Konkan | Mumbai Suburban | CC006000000000958 | 2017 | Sep | Complete | N | N | 1 |
CC006000000161393 | 2019 | Nov | Complete | N | N | 1 | ||||
BAJAJ INTERNATIONAL REALTY PRIVATE LIMITED Total | 2 | |||||||||
Balaji Construction Co. | P51800009622 | Konkan | Mumbai Suburban | CC006000000055118 | 2018 | Jul | Complete | N | N | 1 |
CC006000000079482 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000192778 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000194706 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195552 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000197884 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198548 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198549 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198550 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198551 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198552 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198554 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198555 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
Balaji Construction Co. Total | 13 | |||||||||
BALAJI DEVELOPERS | P51800003420 | Konkan | Mumbai Suburban | CC006000000057608 | 2019 | Jan | Complete | Y | N | 1 |
CC006000000192988 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
BALAJI DEVELOPERS Total | 2 | |||||||||
BALAJI ENTERPRISE | P51800008986 | Konkan | Mumbai Suburban | CC006000000195708 | 2021 | Jan | Pending | N | N | 1 |
BALAJI ENTERPRISE Total | 1 | |||||||||
Balkrishna Construction | P51800005852 | Konkan | Mumbai Suburban | CC006000000044029 | 2018 | Apr | Complete | Y | Y | 1 |
Balkrishna Construction Total | 1 | |||||||||
BEAUTY GANRAJ CONSTRUCTION LLP | P51800023266 | Konkan | Mumbai Suburban | CC006000000196733 | 2021 | May | Complete | N | N | 1 |
BEAUTY GANRAJ CONSTRUCTION LLP Total | 1 | |||||||||
BEEJAY REALTORS PRIVATE LIMITED | P51800009796 | Konkan | Mumbai Suburban | CC006000000012349 | 2017 | Dec | Complete | N | N | 1 |
CC006000000209607 | 2022 | Jan | Pending | N | N | 1 | ||||
BEEJAY REALTORS PRIVATE LIMITED Total | 2 | |||||||||
BEHOLD SPACE DEVELOPERS PRIVATE LIMITED | P51800001443 | Konkan | Mumbai Suburban | CC006000000199118 | 2021 | Nov | Hearing Schedule | N | N | 1 |
CC006000000199145 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
BEHOLD SPACE DEVELOPERS PRIVATE LIMITED Total | 2 | |||||||||
BENCHMARK PROJECTS PVT LTD | P51800006237 | Konkan | Mumbai Suburban | CC006000000056049 | 2018 | Sep | Complete | N | N | 1 |
CC006000000056050 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000079266 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000079268 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079273 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000196874 | 2021 | May | Pending | N | N | 1 | ||||
BENCHMARK PROJECTS PVT LTD Total | 6 | |||||||||
BETTER BUILDERS AND INFRASTRUCTURE PRIVATE LTD | P51800004762 | Konkan | Mumbai Suburban | CC006000000090135 | 2019 | Jul | Complete | Y | N | 1 |
CC006000000090138 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000090139 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000090140 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000090141 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000193742 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193783 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193784 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
BETTER BUILDERS AND INFRASTRUCTURE PRIVATE LTD Total | 8 | |||||||||
BHARAT MAHAN DEVELOPERS & BUILDERS | P51800005064 | Konkan | Mumbai Suburban | CC006000000000500 | 2017 | Sep | Complete | N | N | 1 |
CC006000000023078 | 2018 | Jan | Complete | N | N | 1 | ||||
BHARAT MAHAN DEVELOPERS & BUILDERS Total | 2 | |||||||||
BHARAT MANUBHAI PATEL | P51800013319 | Konkan | Mumbai Suburban | CC006000000001432 | 2017 | Oct | Complete | N | N | 1 |
BHARAT MANUBHAI PATEL Total | 1 | |||||||||
BHARAT NAVINCHANDRA GALA | P51800002243 | Konkan | Mumbai Suburban | CC006000000192552 | 2020 | Feb | Hearing Schedule | N | N | 1 |
P51800007795 | Konkan | Mumbai Suburban | CC006000000078383 | 2019 | Mar | Complete | N | N | 1 | |
CC006000000195376 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195546 | 2021 | Jan | Complete | N | N | 1 | ||||
BHARAT NAVINCHANDRA GALA Total | 4 | |||||||||
BHARAT PRANJIVAN VALIA | P51800001306 | Konkan | Mumbai Suburban | CC006000000193258 | 2020 | Jun | Hearing Schedule | N | N | 1 |
BHARAT PRANJIVAN VALIA Total | 1 | |||||||||
BHATIA BUILDERS AND DEVELOPERS PVT LTDC | P51800007805 | Konkan | Mumbai Suburban | CC006000000023026 | 2018 | Jan | Complete | N | N | 1 |
CC006000000171538 | 2019 | Nov | Complete | N | N | 1 | ||||
BHATIA BUILDERS AND DEVELOPERS PVT LTDC Total | 2 | |||||||||
BHAVANI DEVELOPERS PVT LTD | P51800012042 | Konkan | Mumbai Suburban | CC006000000196111 | 2021 | Feb | Hearing Schedule | N | N | 1 |
CC006000000198600 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198601 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
BHAVANI DEVELOPERS PVT LTD Total | 3 | |||||||||
Bhaveshwar Properties Pvt Ltd | P51800002669 | Konkan | Mumbai Suburban | CC006000000193193 | 2020 | May | Hearing Schedule | N | N | 1 |
Bhaveshwar Properties Pvt Ltd Total | 1 | |||||||||
BHOLANATH KAPILDEV GUPTA | P51800009449 | Konkan | Mumbai Suburban | CC006000000056941 | 2018 | Nov | Complete | N | N | 1 |
CC006000000194201 | 2020 | Oct | Complete | Y | N | 1 | ||||
CC006000000194233 | 2020 | Oct | Complete | Y | N | 1 | ||||
CC006000000194252 | 2020 | Oct | Complete | Y | N | 1 | ||||
CC006000000197153 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
BHOLANATH KAPILDEV GUPTA Total | 5 | |||||||||
BHS HOUSING PRIVATE LIMITED | P51800012044 | Konkan | Mumbai Suburban | CC006000000193829 | 2020 | Sep | Pending | N | N | 1 |
BHS HOUSING PRIVATE LIMITED Total | 1 | |||||||||
Bhushan Enterprises | P51800012948 | Konkan | Mumbai Suburban | CC006000000023964 | 2018 | May | Complete | N | N | 1 |
Bhushan Enterprises Total | 1 | |||||||||
BLUE CANYON REALTY PVT LTD | P51800014896 | Konkan | Mumbai Suburban | CC006000000192631 | 2020 | Feb | Complete | Y | Y | 1 |
BLUE CANYON REALTY PVT LTD Total | 1 | |||||||||
BP INFRA PROJECTS LLP | P51800024694 | Konkan | Mumbai Suburban | CC006000000192922 | 2020 | Apr | Hearing Schedule | N | N | 1 |
BP INFRA PROJECTS LLP Total | 1 | |||||||||
BUILDPRO | P51800006435 | Konkan | Mumbai Suburban | CC006000000110769 | 2019 | Oct | Hearing Schedule | N | N | 1 |
CC006000000194442 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
BUILDPRO Total | 2 | |||||||||
BUILDTECH GROUP | P51800009965 | Konkan | Mumbai Suburban | CC006000000054755 | 2018 | Jun | Complete | Y | N | 1 |
CC006000000054768 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054769 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000057926 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078204 | 2019 | Feb | Complete | Y | N | 1 | ||||
BUILDTECH GROUP Total | 5 | |||||||||
C G HOUSING INFRA PVT LTD C G HOUSING INFRA PVT LTD C G HOUSING INFRA PVT LTD | P51800000603 | Konkan | Mumbai Suburban | CC006000000195071 | 2020 | Nov | Hearing Schedule | N | N | 1 |
CC006000000197700 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
C G HOUSING INFRA PVT LTD C G HOUSING INFRA PVT LTD C G HOUSING INFRA PVT LTD Total | 2 | |||||||||
Castle Floors PMS Pvt Ltd | P51800015109 | Konkan | Mumbai Suburban | CC006000000196259 | 2021 | Mar | Complete | N | N | 1 |
CC006000000209497 | 2021 | Dec | Pending | N | N | 1 | ||||
Castle Floors PMS Pvt Ltd Total | 2 | |||||||||
CCI PROJECTS PRIVATE LIMITED | P51800002287 | Konkan | Mumbai Suburban | CC006000000000834 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000835 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000836 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000935 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000955 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000044340 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000100486 | 2019 | Aug | Complete | N | N | 1 | ||||
P51800003067 | Konkan | Mumbai Suburban | CC006000000001752 | 2020 | Dec | Hearing Schedule | N | N | 1 | |
CC006000000012599 | 2017 | Dec | Complete | Y | N | 1 | ||||
CC006000000022900 | 2019 | Nov | Complete | Y | Y | 1 | ||||
CC006000000023191 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023579 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044076 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044118 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000054636 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054777 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000054855 | 2018 | Jun | Hearing Schedule | Y | Y | 1 | ||||
CC006000000054956 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000055491 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055723 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055728 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056115 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056117 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056120 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056532 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000057389 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000068148 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078611 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000078815 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079150 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000079241 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000079308 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000079357 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000100485 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100522 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000110671 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000110736 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000120991 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000141144 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000141159 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000151223 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000151225 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000161239 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000161287 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161358 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000161363 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161364 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000171479 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171482 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171567 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171579 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171746 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171760 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171767 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171771 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171799 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000171805 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171816 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171817 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171830 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171834 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171839 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000171918 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000171932 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000181958 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000182025 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000182039 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000182059 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000182062 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000182066 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000192156 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000192188 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192390 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000192499 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192529 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192533 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192534 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192535 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192536 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192537 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192539 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192540 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192541 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192542 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192544 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192553 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192554 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192555 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192557 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192559 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192560 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192561 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192562 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192563 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192565 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192566 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192567 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192568 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192583 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192585 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192586 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192587 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192590 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192591 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192592 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192593 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192601 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192602 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192603 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192604 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192605 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192606 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192607 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192608 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192610 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192660 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192740 | 2020 | Mar | Complete | Y | N | 1 | ||||
CC006000000193146 | 2020 | Mar | Complete | Y | N | 1 | ||||
CC006000000193656 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193659 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193683 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193693 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193723 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193795 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000193815 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193854 | 2020 | Aug | Complete | N | N | 1 | ||||
CC006000000193858 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193885 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193886 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193903 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193916 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000193926 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193930 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193941 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193943 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193944 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193968 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193990 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000193993 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194015 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194063 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000194064 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194066 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194068 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194069 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194070 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194071 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194075 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194076 | 2020 | Sep | Complete | Y | N | 1 | ||||
CC006000000194107 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194114 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000194121 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194123 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194124 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194126 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194127 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194128 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194129 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194130 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194131 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194133 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194134 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194139 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194141 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194142 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194143 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194145 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194146 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000194147 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194168 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194170 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194172 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194173 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194174 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194175 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194256 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194260 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194336 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194357 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194404 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194446 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194529 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194538 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194565 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194567 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194572 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194573 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194580 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194665 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194675 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194708 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194723 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194744 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194745 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194747 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194750 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194752 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194773 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194780 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194782 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194783 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194784 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194785 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194786 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194787 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194820 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194827 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194905 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194906 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194911 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194912 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194913 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194914 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194915 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194933 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194938 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194962 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194963 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194980 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194989 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194990 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195017 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195021 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195030 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195040 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195044 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195048 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195056 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195057 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195060 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195061 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195062 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195080 | 2020 | Dec | Pending | N | N | 1 | ||||
CC006000000195144 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195156 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195180 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195191 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195237 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195240 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195241 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195251 | 2020 | Dec | Pending | N | N | 1 | ||||
CC006000000195259 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195287 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195318 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195320 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195324 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195330 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195333 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195334 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195339 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195341 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195349 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195350 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195359 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195366 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195381 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195398 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195430 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195436 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195444 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195445 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195455 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195494 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195597 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195599 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195663 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195700 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195722 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195723 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195957 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195962 | 2021 | Feb | Pending | N | N | 1 | ||||
CC006000000195963 | 2021 | Feb | Pending | N | N | 1 | ||||
CC006000000196008 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196010 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196034 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196332 | 2021 | Mar | Pending | N | N | 1 | ||||
CC006000000196497 | 2021 | Jun | Complete | N | N | 1 | ||||
CC006000000196535 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196553 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196561 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196575 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196579 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196582 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196589 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196591 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196592 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196603 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196619 | 2021 | Apr | Pending | N | N | 1 | ||||
CC006000000196625 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196631 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196633 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196642 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196646 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196651 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196654 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196660 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196680 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196794 | 2021 | Apr | Pending | N | N | 1 | ||||
CC006000000196815 | 2021 | Apr | Pending | N | N | 1 | ||||
CC006000000196991 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197010 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197451 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197537 | 2021 | Jul | Complete | N | N | 1 | ||||
CC006000000197587 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197676 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197818 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000198002 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198006 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198243 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198245 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198476 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198486 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198684 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000209355 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209366 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CCI PROJECTS PRIVATE LIMITED Total | 315 | |||||||||
CELLO SONAL CONSTRUCTION | P51800002490 | Konkan | Mumbai Suburban | CC006000000033969 | 2018 | Apr | Complete | N | N | 1 |
CC006000000192611 | 2020 | Feb | Complete | N | N | 1 | ||||
CELLO SONAL CONSTRUCTION Total | 2 | |||||||||
CHANDIWALA ENTERPRISES | P51800010505 | Konkan | Mumbai Suburban | CC006000000197950 | 2021 | Aug | Hearing Schedule | N | N | 1 |
CHANDIWALA ENTERPRISES Total | 1 | |||||||||
CHAUBEY REALTIES PRIVATE LIMITED | P51800004538 | Konkan | Mumbai Suburban | CC006000000001069 | 2017 | Oct | Complete | N | N | 1 |
CC006000000056694 | 2018 | Oct | Complete | N | N | 1 | ||||
CHAUBEY REALTIES PRIVATE LIMITED Total | 2 | |||||||||
Chetna Global | P51800000906 | Konkan | Mumbai Suburban | CC006000000199204 | 2021 | Nov | Hearing Schedule | N | N | 1 |
Chetna Global Total | 1 | |||||||||
CHINNAIAH VENKATESH GOWDA | P51800002790 | Konkan | Mumbai Suburban | CC006000000197791 | 2021 | Jul | Hearing Schedule | N | N | 1 |
P51800009157 | Konkan | Mumbai Suburban | CC006000000023306 | 2018 | Feb | Complete | Y | Y | 1 | |
CC006000000044355 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000044380 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000055093 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055136 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000057047 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078477 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078489 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000195391 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CHINNAIAH VENKATESH GOWDA Total | 10 | |||||||||
CHINTAN ARUN ZAVERI | P51800006507 | Konkan | Mumbai Suburban | CC006000000054596 | 2018 | Jun | Complete | N | N | 1 |
CC006000000056652 | 2018 | Oct | Complete | Y | N | 1 | ||||
P51800009670 | Konkan | Mumbai Suburban | CC006000000055406 | 2018 | Jul | Complete | Y | N | 1 | |
CHINTAN ARUN ZAVERI Total | 3 | |||||||||
CHOICE ENTERPRISES | P51800009779 | Konkan | Mumbai Suburban | CC006000000197265 | 2021 | Jun | Hearing Schedule | N | N | 1 |
CHOICE ENTERPRISES Total | 1 | |||||||||
Citimake Builders Private Limtied | P51800002996 | Konkan | Mumbai Suburban | CC006000000193878 | 2020 | Sep | Complete | N | N | 1 |
CC006000000197236 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
Citimake Builders Private Limtied Total | 2 | |||||||||
CONCRETE BUILDERS | P51800017405 | Konkan | Mumbai Suburban | CC006000000057545 | 2019 | Jan | Complete | N | N | 1 |
CONCRETE BUILDERS Total | 1 | |||||||||
Conoor Builders Private Limited | P51800002922 | Konkan | Mumbai Suburban | CC006000000057098 | 2018 | Nov | Complete | N | N | 1 |
CC006000000161461 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171459 | 2019 | Nov | Pending | Y | N | 1 | ||||
CC006000000171612 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171758 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192256 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000192261 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000193270 | 2020 | Jun | Pending | Y | N | 1 | ||||
CC006000000193558 | 2020 | Jul | Complete | Y | N | 1 | ||||
CC006000000193705 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000195664 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195665 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195666 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000198335 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Conoor Builders Private Limited Total | 14 | |||||||||
CONSOLIDATED CROP PROTECTION PRIVATE LIMITED | P51800011758 | Konkan | Mumbai Suburban | CC006000000197154 | 2021 | Jun | Hearing Schedule | N | N | 1 |
CC006000000197156 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CONSOLIDATED CROP PROTECTION PRIVATE LIMITED Total | 2 | |||||||||
CONWOOD REALTY PRIVATE LIMITED | P51800008188 | Konkan | Mumbai Suburban | CC006000000001858 | 2017 | Nov | Complete | N | N | 1 |
CC006000000001871 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012368 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000012705 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023569 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023570 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000055278 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055555 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055558 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055559 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055560 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000057003 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000078456 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000194356 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195818 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000197622 | 2021 | Jul | Pending | N | N | 1 | ||||
P51800012007 | Konkan | Mumbai Suburban | CC006000000056829 | 2018 | Nov | Complete | N | N | 1 | |
CC006000000195544 | 2021 | Jan | Complete | N | N | 1 | ||||
CONWOOD REALTY PRIVATE LIMITED Total | 18 | |||||||||
CORDCON BUILDERS PVT LTD | P51800010364 | Konkan | Mumbai Suburban | CC006000000012775 | 2018 | Jan | Complete | N | N | 1 |
CC006000000100297 | 2019 | Aug | Complete | Y | N | 1 | ||||
CORDCON BUILDERS PVT LTD Total | 2 | |||||||||
Cosmos Homes India Pvt. Ltd. | P51800012114 | Konkan | Mumbai Suburban | CC006000000000989 | 2017 | Sep | Complete | N | N | 1 |
CC006000000023493 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044286 | 2018 | Apr | Complete | N | N | 1 | ||||
Cosmos Homes India Pvt. Ltd. Total | 3 | |||||||||
CRESCENT AMITY REALTORS PVT.LTD | P51800008480 | Konkan | Mumbai Suburban | CC006000000199013 | 2021 | Nov | Hearing Schedule | N | N | 1 |
CC006000000209434 | 2021 | Dec | Pending | N | N | 1 | ||||
CRESCENT AMITY REALTORS PVT.LTD Total | 2 | |||||||||
CRESCENT REALTY DEVELOPERS PRIVATE LIMITED | P51800010460 | Konkan | Mumbai Suburban | CC006000000022915 | 2018 | Jan | Complete | N | N | 1 |
CRESCENT REALTY DEVELOPERS PRIVATE LIMITED Total | 1 | |||||||||
D. K. REALTY (INDIA) PVT. LTD. | P51800000340 | Konkan | Mumbai Suburban | CC006000000057845 | 2019 | Jan | Hearing Schedule | N | N | 1 |
CC006000000181992 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000196366 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196845 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197382 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198249 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
D. K. REALTY (INDIA) PVT. LTD. Total | 6 | |||||||||
D. S. KULKARNI DEVELOPERS LIMITED | P51800009465 | Konkan | Mumbai Suburban | CC006000000012065 | 2017 | Nov | Complete | Y | N | 1 |
CC006000000055709 | 2018 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000056176 | 2018 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000056245 | 2019 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000057144 | 2018 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000057149 | 2019 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000057152 | 2018 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000057179 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057830 | 2019 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000057969 | 2019 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000057988 | 2019 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000058073 | 2019 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000078359 | 2019 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000141208 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000161260 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
D. S. KULKARNI DEVELOPERS LIMITED Total | 15 | |||||||||
D.G.LAND DEVELOPERS PRIVATE LIMITED | P51800000446 | Konkan | Mumbai Suburban | CC006000000056675 | 2018 | Oct | Complete | Y | Y | 1 |
CC006000000110760 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000171568 | 2019 | Nov | Complete | N | N | 1 | ||||
P51800006581 | Konkan | Mumbai Suburban | CC006000000078225 | 2019 | Feb | Complete | N | N | 1 | |
D.G.LAND DEVELOPERS PRIVATE LIMITED Total | 4 | |||||||||
D.G.REALTY | P51800004398 | Konkan | Mumbai Suburban | CC006000000056500 | 2018 | Oct | Complete | N | N | 1 |
CC006000000056994 | 2018 | Nov | Complete | N | N | 1 | ||||
D.G.REALTY Total | 2 | |||||||||
Damodar Suruchi Developers Pvt. Ltd. | P51800007275 | Konkan | Mumbai Suburban | CC006000000001233 | 2017 | Oct | Complete | N | N | 1 |
CC006000000012681 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000054770 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000078501 | 2019 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000079504 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000100204 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000194302 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
Damodar Suruchi Developers Pvt. Ltd. Total | 7 | |||||||||
DENNIS JAMES FERNANDES | P51800009781 | Konkan | Mumbai Suburban | CC006000000001939 | 2017 | Nov | Complete | Y | N | 1 |
CC006000000057815 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000194857 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194858 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000199181 | 2021 | Nov | Pending | N | N | 1 | ||||
CC006000000199182 | 2021 | Nov | Pending | N | N | 1 | ||||
DENNIS JAMES FERNANDES Total | 6 | |||||||||
DEV LAND & HOUSING PRIVATE LIMITED | P51800005170 | Konkan | Mumbai Suburban | CC006000000089643 | 2019 | Jun | Complete | N | N | 1 |
DEV LAND & HOUSING PRIVATE LIMITED Total | 1 | |||||||||
DEV LAND & HOUSING PVT LTD | P51800003604 | Konkan | Mumbai Suburban | CC006000000001675 | 2017 | Nov | Complete | N | N | 1 |
DEV LAND & HOUSING PVT LTD Total | 1 | |||||||||
DEV REALITY CORPORATION | P51800011326 | Konkan | Mumbai Suburban | CC006000000056082 | 2018 | Sep | Complete | N | N | 1 |
CC006000000209474 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209475 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209489 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209498 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209502 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000209503 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209513 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209518 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209521 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209522 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
DEV REALITY CORPORATION Total | 11 | |||||||||
DEVNANI DEVELOPERS | P51800017580 | Konkan | Mumbai Suburban | CC006000000079207 | 2019 | May | Complete | N | N | 1 |
DEVNANI DEVELOPERS Total | 1 | |||||||||
DHAN INTERNATIONAL PVT LTD | P51800001637 | Konkan | Mumbai Suburban | CC006000000044519 | 2018 | May | Complete | Y | N | 1 |
DHAN INTERNATIONAL PVT LTD Total | 1 | |||||||||
DHANJI GELABHAI GALA | P51800012468 | Konkan | Mumbai Suburban | CC006000000171619 | 2019 | Nov | Complete | N | N | 1 |
DHANJI GELABHAI GALA Total | 1 | |||||||||
DHANSHREE DEVELOPERS PVT LTD | P51800012859 | Konkan | Mumbai Suburban | CC006000000001855 | 2017 | Nov | Complete | N | N | 1 |
CC006000000023855 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023856 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023864 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023877 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023929 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044077 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000055035 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055131 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000056149 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056233 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056237 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056306 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056520 | 2018 | Oct | Complete | N | N | 1 | ||||
P51800013116 | Konkan | Mumbai Suburban | CC006000000100471 | 2019 | Aug | Complete | N | N | 1 | |
CC006000000120981 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000161247 | 2019 | Oct | Complete | N | N | 1 | ||||
DHANSHREE DEVELOPERS PVT LTD Total | 17 | |||||||||
Dharmesh Constructions Private Limited | P51800002030 | Konkan | Mumbai Suburban | CC006000000056989 | 2018 | Nov | Complete | Y | N | 1 |
CC006000000193323 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000193823 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000194751 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000195002 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000196718 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196729 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000198364 | 2021 | Sep | Pending | N | N | 1 | ||||
CC006000000198429 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000199111 | 2021 | Nov | Pending | N | N | 1 | ||||
P51800004402 | Konkan | Mumbai Suburban | CC006000000079120 | 2019 | Jun | Complete | N | N | 1 | |
CC006000000194699 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000195869 | 2021 | Feb | Pending | N | N | 1 | ||||
CC006000000196466 | 2021 | Mar | Pending | N | N | 1 | ||||
CC006000000197157 | 2021 | Jun | Pending | N | N | 1 | ||||
P51800005395 | Konkan | Mumbai Suburban | CC006000000195104 | 2020 | Dec | Pending | N | N | 1 | |
P51800006759 | Konkan | Mumbai Suburban | CC006000000199188 | 2021 | Nov | Hearing Schedule | N | N | 1 | |
Dharmesh Constructions Private Limited Total | 17 | |||||||||
DHEERAJ P VOHRA | P51800011782 | Konkan | Mumbai Suburban | CC006000000057115 | 2018 | Nov | Complete | N | N | 1 |
DHEERAJ P VOHRA Total | 1 | |||||||||
DHOOT DEVELOPERS PVT. LTD. | P51800008534 | Konkan | Mumbai Suburban | CC006000000197294 | 2021 | Jun | Complete | N | N | 1 |
DHOOT DEVELOPERS PVT. LTD. Total | 1 | |||||||||
DHRUVI PROPERTIES PVT LTD | P51800007232 | Konkan | Mumbai Suburban | CC006000000023328 | 2018 | Feb | Complete | N | N | 1 |
CC006000000055802 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056855 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000100392 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100424 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000195685 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000198679 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
DHRUVI PROPERTIES PVT LTD Total | 7 | |||||||||
DILIP HIRALAL DOSHI | P51800009426 | Konkan | Mumbai Suburban | CC006000000209430 | 2021 | Dec | Pending | N | N | 1 |
DILIP HIRALAL DOSHI Total | 1 | |||||||||
Dimension Housing Realty LLP | P51800001222 | Konkan | Mumbai Suburban | CC006000000100584 | 2019 | Aug | Complete | N | N | 1 |
Dimension Housing Realty LLP Total | 1 | |||||||||
Dinesh C Agarwal | P51800011231 | Konkan | Mumbai Suburban | CC006000000023908 | 2018 | Mar | Complete | N | N | 1 |
Dinesh C Agarwal Total | 1 | |||||||||
DINESH S CHANDNANI | P51800004753 | Konkan | Mumbai Suburban | CC006000000012246 | 2017 | Dec | Complete | N | N | 1 |
CC006000000012316 | 2017 | Dec | Complete | N | N | 1 | ||||
DINESH S CHANDNANI Total | 2 | |||||||||
Dipti Spaces Pvt. Ltd. | P51900002676 | Konkan | Mumbai Suburban | CC006000000044322 | 2018 | May | Complete | Y | Y | 1 |
CC006000000194832 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194876 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000197993 | 2021 | Aug | Complete | N | N | 1 | ||||
Dipti Spaces Pvt. Ltd. Total | 4 | |||||||||
Dolphin Developers | P51800009033 | Konkan | Mumbai Suburban | CC006000000209403 | 2021 | Dec | Pending | N | N | 1 |
Dolphin Developers Total | 1 | |||||||||
Drushti Realtors | P51800007499 | Konkan | Mumbai Suburban | CC006000000000517 | 2017 | Sep | Complete | N | N | 1 |
CC006000000044453 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055947 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055958 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055959 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055969 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056345 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000057762 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078345 | 2019 | Mar | Complete | N | N | 1 | ||||
Drushti Realtors Total | 9 | |||||||||
DYNAMIX CONTRACTORS & BUILDERS PRIVATE LIMITED | P51800018784 | Konkan | Mumbai Suburban | CC006000000195632 | 2021 | Jan | Hearing Schedule | N | N | 1 |
DYNAMIX CONTRACTORS & BUILDERS PRIVATE LIMITED Total | 1 | |||||||||
EAST AND WEST BUILDERS | P51800002906 | Konkan | Mumbai Suburban | CC006000000057612 | 2019 | Jan | Complete | N | N | 1 |
CC006000000058085 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000110787 | 2019 | Sep | Complete | N | N | 1 | ||||
P51800009296 | Konkan | Mumbai Suburban | CC006000000196393 | 2021 | Mar | Hearing Schedule | N | N | 1 | |
CC006000000196396 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196404 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
EAST AND WEST BUILDERS Total | 6 | |||||||||
EASTERN SAI SWAYAM | P51800009824 | Konkan | Mumbai Suburban | CC006000000057494 | 2019 | Jan | Complete | N | N | 1 |
EASTERN SAI SWAYAM Total | 1 | |||||||||
ECC-DB JOINT VENTURE | P51800012155 | Konkan | Mumbai Suburban | CC006000000000441 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000497 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000055239 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055984 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000100232 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000192744 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000195431 | 2020 | Dec | Pending | N | N | 1 | ||||
CC006000000195434 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195438 | 2020 | Dec | Pending | N | N | 1 | ||||
CC006000000195440 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196602 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
ECC-DB JOINT VENTURE Total | 11 | |||||||||
Ecohomes Constructions Pvt. Ltd. | P51800002116 | Konkan | Mumbai Suburban | CC006000000199246 | 2021 | Dec | Pending | N | N | 1 |
Ecohomes Constructions Pvt. Ltd. Total | 1 | |||||||||
Ecopark Developers LLP | P51800000639 | Konkan | Mumbai Suburban | CC006000000193973 | 2020 | Sep | Hearing Schedule | N | N | 1 |
Ecopark Developers LLP Total | 1 | |||||||||
EKTA EVERGLADE HOMES PRIVATE LIMITED | P51800000731 | Konkan | Mumbai Suburban | CC006000000044008 | 2018 | Apr | Complete | N | N | 1 |
CC006000000110706 | 2019 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000192203 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000199169 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
P51800000947 | Konkan | Mumbai Suburban | CC006000000000113 | 2017 | Aug | Complete | Y | Y | 1 | |
CC006000000012703 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000054656 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056721 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000057923 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000089941 | 2019 | Jul | Complete | N | N | 1 | ||||
2020 | Dec | Complete | N | N | 1 | |||||
CC006000000090164 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000151216 | 2019 | Oct | Pending | N | N | 1 | ||||
CC006000000161434 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000161455 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000171529 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171797 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192835 | 2020 | Mar | Pending | N | N | 1 | ||||
CC006000000192977 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193895 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000194343 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194799 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195024 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195507 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195508 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000198875 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199156 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000209428 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209554 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209758 | 2022 | Jan | Pending | N | N | 1 | ||||
EKTA EVERGLADE HOMES PRIVATE LIMITED Total | 30 | |||||||||
EKTA SHUBHAM VENTURE | P51800000141 | Konkan | Mumbai Suburban | CC006000000171593 | 2020 | Jan | Complete | Y | N | 1 |
P51800001112 | Konkan | Mumbai Suburban | CC006000000044266 | 2018 | Apr | Complete | N | N | 1 | |
EKTA SHUBHAM VENTURE Total | 2 | |||||||||
Ekta Supreme Corporation | P51800000908 | Konkan | Mumbai Suburban | CC006000000001097 | 2017 | Oct | Complete | N | N | 1 |
CC006000000023132 | 2018 | Feb | Complete | N | N | 1 | ||||
Ekta Supreme Corporation Total | 2 | |||||||||
EKTA WORLD PRIVATE LIMITED | P51800021089 | Konkan | Mumbai Suburban | CC006000000199068 | 2021 | Dec | Hearing Schedule | N | N | 1 |
EKTA WORLD PRIVATE LIMITED Total | 1 | |||||||||
ENTEE DEVELOPERS | P51800002874 | Konkan | Mumbai Suburban | CC006000000056641 | 2018 | Oct | Complete | N | N | 1 |
CC006000000056701 | 2018 | Oct | Complete | N | N | 1 | ||||
ENTEE DEVELOPERS Total | 2 | |||||||||
EPITOME RESIDENCY PRIVATE LIMITED | P51800003270 | Konkan | Mumbai Suburban | CC006000000001071 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001627 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000044119 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000044204 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044398 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054950 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000057670 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078533 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000089970 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090150 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000110896 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000110897 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141025 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000181965 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192230 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192262 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000192323 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192512 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000193081 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193082 | 2020 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000193254 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000196315 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000199198 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209491 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209492 | 2021 | Dec | Pending | N | N | 1 | ||||
EPITOME RESIDENCY PRIVATE LIMITED Total | 25 | |||||||||
ERA REALTORS PRIVATE LIMITED | P51800010463 | Konkan | Mumbai Suburban | CC006000000001028 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001783 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000001908 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000001919 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012202 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000012376 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000023920 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044186 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000044309 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054567 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054677 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054856 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000056045 | 2019 | Feb | Complete | Y | Y | 1 | ||||
CC006000000057087 | 2018 | Dec | Complete | Y | N | 1 | ||||
CC006000000057248 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057858 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000058049 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000058061 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058126 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078224 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078239 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000079233 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079234 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079235 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089596 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100264 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100494 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100511 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100600 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000141005 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141011 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141012 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141013 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141145 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000171571 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171587 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171604 | 2019 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000171794 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000171944 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000192282 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000193128 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193280 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000193387 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000193609 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193623 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000193731 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000193767 | 2020 | Aug | Complete | Y | N | 1 | ||||
CC006000000193792 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000193954 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000193955 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000193982 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000194232 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194298 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194379 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000194835 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195073 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195323 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195517 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195601 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195603 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195605 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195606 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195607 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195615 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195620 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195621 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195623 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195654 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000195755 | 2021 | Jan | Pending | N | N | 1 | ||||
CC006000000195922 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000195940 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196244 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000196479 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196494 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196530 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196638 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196687 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196704 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196742 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196790 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196796 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196797 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196805 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196847 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196928 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197062 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197096 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197138 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197412 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197972 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000197998 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198082 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198088 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198089 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198450 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198512 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198561 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199339 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209351 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209404 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209451 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209454 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209476 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209735 | 2022 | Jan | Pending | N | N | 1 | ||||
ERA REALTORS PRIVATE LIMITED Total | 104 | |||||||||
ESSAR CONSTRUCTION COMPANY | P51800006762 | Konkan | Mumbai Suburban | CC006000000023550 | 2018 | Mar | Complete | N | N | 1 |
ESSAR CONSTRUCTION COMPANY Total | 1 | |||||||||
ETCO BUILDERS PRIVATE LIMITED | P51800002429 | Konkan | Mumbai Suburban | CC006000000089992 | 2019 | Jul | Hearing Schedule | N | N | 1 |
CC006000000090097 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000090098 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000090099 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000090104 | 2019 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000192453 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000192454 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000192803 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000198873 | 2021 | Nov | Pending | N | N | 1 | ||||
ETCO BUILDERS PRIVATE LIMITED Total | 9 | |||||||||
Ethics Infra Development Pvt. Ltd. | P51800000078 | Konkan | Mumbai Suburban | CC006000000198202 | 2021 | Dec | Hearing Schedule | N | N | 1 |
Ethics Infra Development Pvt. Ltd. Total | 1 | |||||||||
EVERSHINE BUILDERS PRIVATE LIMITED | P51800003631 | Konkan | Mumbai Suburban | CC006000000001761 | 2017 | Nov | Complete | N | N | 1 |
CC006000000090013 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000090014 | 2019 | Jul | Complete | Y | N | 1 | ||||
EVERSHINE BUILDERS PRIVATE LIMITED Total | 3 | |||||||||
Evie Real Estate Private Limited | P51800001296 | Konkan | Mumbai Suburban | CC006000000001068 | 2017 | Oct | Complete | N | N | 1 |
CC006000000001820 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000023332 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000044025 | 2018 | Apr | Complete | N | N | 1 | ||||
2020 | Jan | Complete | N | N | 1 | |||||
CC006000000056002 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000195613 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000209443 | 2021 | Dec | Pending | N | N | 1 | ||||
P51800001670 | Konkan | Mumbai Suburban | CC006000000194273 | 2020 | Oct | Hearing Schedule | N | N | 1 | |
P51800001903 | Konkan | Mumbai Suburban | CC006000000023588 | 2018 | Mar | Complete | N | N | 1 | |
CC006000000056166 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000171815 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
P51800005684 | Konkan | Mumbai Suburban | CC006000000012174 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000023050 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000056705 | 2018 | Nov | Complete | N | N | 1 | ||||
Evie Real Estate Private Limited Total | 15 | |||||||||
Excel Enterprises | P51800014623 | Konkan | Mumbai Suburban | CC006000000012692 | 2018 | Jan | Complete | N | N | 1 |
Excel Enterprises Total | 1 | |||||||||
FAIRMONT CONSTRUCTIONS PRIVATE LIMITED | P51800003351 | Konkan | Mumbai Suburban | CC006000000195368 | 2020 | Dec | Hearing Schedule | N | N | 1 |
FAIRMONT CONSTRUCTIONS PRIVATE LIMITED Total | 1 | |||||||||
Fairmont Lifespaces LLP | P51800014750 | Konkan | Mumbai Suburban | CC006000000194087 | 2020 | Sep | Pending | N | N | 1 |
Fairmont Lifespaces LLP Total | 1 | |||||||||
FALCON DWELLERS PRIVATE LIMITED | P51800004662 | Konkan | Mumbai Suburban | CC006000000056389 | 2018 | Oct | Complete | N | N | 1 |
CC006000000056416 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056542 | 2018 | Oct | Complete | Y | N | 1 | ||||
CC006000000194083 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000195759 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000197823 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
P51800007188 | Konkan | Mumbai Suburban | CC006000000110921 | 2019 | Sep | Complete | Y | N | 1 | |
CC006000000120936 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000197829 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197831 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
FALCON DWELLERS PRIVATE LIMITED Total | 10 | |||||||||
FATCAT INFRASTRCTURE PRIVATE LIMITED | P51800008276 | Konkan | Mumbai Suburban | CC006000000057231 | 2018 | Dec | Hearing Schedule | N | N | 1 |
FATCAT INFRASTRCTURE PRIVATE LIMITED Total | 1 | |||||||||
FATIMA ARCH & DEVELOPERS | P51800013857 | Konkan | Mumbai Suburban | CC006000000193262 | 2020 | Jun | Complete | N | N | 1 |
CC006000000193265 | 2020 | Jun | Pending | N | N | 1 | ||||
CC006000000193268 | 2020 | Jun | Pending | N | N | 1 | ||||
CC006000000193307 | 2020 | Jun | Complete | N | N | 1 | ||||
CC006000000193595 | 2020 | Jul | Complete | N | N | 1 | ||||
FATIMA ARCH & DEVELOPERS Total | 5 | |||||||||
FORBES & COMPANY LIMITED | P51800002564 | Konkan | Mumbai Suburban | CC006000000195085 | 2020 | Nov | Hearing Schedule | N | N | 1 |
CC006000000195107 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000195226 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195235 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195296 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195326 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195329 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196395 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196706 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196777 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196781 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196934 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197165 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198138 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
FORBES & COMPANY LIMITED Total | 14 | |||||||||
Forefront Private Limited | P51800010015 | Konkan | Mumbai Suburban | CC006000000023293 | 2018 | Feb | Complete | N | N | 1 |
Forefront Private Limited Total | 1 | |||||||||
Forum Homes Pvt Ltd | P51800011662 | Konkan | Mumbai Suburban | CC006000000078849 | 2019 | Apr | Complete | N | N | 1 |
CC006000000197447 | 2021 | Jun | Pending | N | N | 1 | ||||
Forum Homes Pvt Ltd Total | 2 | |||||||||
G A Builders Pvt Ltd. | P51800004855 | Konkan | Mumbai Suburban | CC006000000012265 | 2017 | Dec | Complete | N | N | 1 |
P51800009310 | Konkan | Mumbai Suburban | CC006000000195337 | 2020 | Dec | Hearing Schedule | N | N | 1 | |
G A Builders Pvt Ltd. Total | 2 | |||||||||
G F REALITY PRIVATE LIMITED | P51800015512 | Konkan | Mumbai Suburban | CC006000000057594 | 2019 | Jan | Complete | Y | Y | 1 |
G F REALITY PRIVATE LIMITED Total | 1 | |||||||||
G.S. DEVELOPERS | P51800003297 | Konkan | Mumbai Suburban | CC006000000193880 | 2020 | Aug | Hearing Schedule | N | N | 1 |
G.S. DEVELOPERS Total | 1 | |||||||||
GADIRAJU SUBRAMANYAM RAJU PROPRIETOR OF TIRUPATHI ENTERPRISES | P51800000118 | Konkan | Mumbai Suburban | CC006000000079076 | 2019 | May | Complete | N | N | 1 |
CC006000000194561 | 2020 | Oct | Complete | N | N | 1 | ||||
GADIRAJU SUBRAMANYAM RAJU PROPRIETOR OF TIRUPATHI ENTERPRISES Total | 2 | |||||||||
Gadkari Builders & Associates | P51900011095 | Konkan | Mumbai Suburban | CC006000000001763 | 2017 | Nov | Complete | Y | N | 1 |
CC006000000023437 | 2018 | Feb | Complete | Y | N | 1 | ||||
CC006000000056142 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056153 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056155 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056159 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056160 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056224 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056358 | 2018 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000056565 | 2018 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000089820 | 2019 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000195464 | 2020 | Dec | Complete | N | N | 1 | ||||
Gadkari Builders & Associates Total | 12 | |||||||||
Gajaanan Property Developers Private Limited | P51800020208 | Konkan | Mumbai Suburban | CC006000000209567 | 2022 | Jan | Pending | N | N | 1 |
CC006000000209578 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209664 | 2022 | Jan | Pending | N | N | 1 | ||||
CC006000000209666 | 2022 | Jan | Pending | N | N | 1 | ||||
Gajaanan Property Developers Private Limited Total | 4 | |||||||||
Garnet Construction Limited | P51800005369 | Konkan | Mumbai Suburban | CC006000000171745 | 2019 | Dec | Complete | N | N | 1 |
Garnet Construction Limited Total | 1 | |||||||||
Geetai Developers Private Limited | P51800008680 | Konkan | Mumbai Suburban | CC006000000000361 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000572 | 2017 | Sep | Complete | Y | N | 1 | ||||
CC006000000001103 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000001967 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012037 | 2017 | Nov | Complete | Y | N | 1 | ||||
CC006000000012475 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000012483 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000012610 | 2017 | Dec | Complete | Y | N | 1 | ||||
CC006000000012799 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000012805 | 2018 | Jan | Complete | Y | N | 1 | ||||
CC006000000023228 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000023680 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000023697 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000023728 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023967 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000068142 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068149 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068151 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068161 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078282 | 2019 | Feb | Complete | Y | N | 1 | ||||
CC006000000198920 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000209546 | 2021 | Dec | Pending | N | N | 1 | ||||
Geetai Developers Private Limited Total | 22 | |||||||||
Geetaraj Realtors | P51800010293 | Konkan | Mumbai Suburban | CC006000000001058 | 2017 | Oct | Complete | N | N | 1 |
CC006000000194970 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
Geetaraj Realtors Total | 2 | |||||||||
GEOPRENEUR CORP PVT LTD | P51800008439 | Konkan | Mumbai Suburban | CC006000000198545 | 2021 | Oct | Hearing Schedule | N | N | 1 |
GEOPRENEUR CORP PVT LTD Total | 1 | |||||||||
Geopreneur Spire Realty | P51800011901 | Konkan | Mumbai Suburban | CC006000000054698 | 2018 | Jun | Complete | N | N | 1 |
CC006000000209756 | 2022 | Jan | Pending | N | N | 1 | ||||
Geopreneur Spire Realty Total | 2 | |||||||||
GIRIRAJ ENTERPRISES | P51800009344 | Konkan | Mumbai Suburban | CC006000000044023 | 2018 | Apr | Complete | N | N | 1 |
GIRIRAJ ENTERPRISES Total | 1 | |||||||||
GITANJALI INFRATECH LIMITED | P51800004498 | Konkan | Mumbai Suburban | CC006000000054940 | 2018 | Jun | Complete | N | N | 1 |
CC006000000054952 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000056350 | 2018 | Sep | Complete | Y | N | 1 | ||||
CC006000000193948 | 2020 | Sep | Pending | N | N | 1 | ||||
GITANJALI INFRATECH LIMITED Total | 4 | |||||||||
GLASSWOOD REALTY PRIVATE LIMITED | P51800006266 | Konkan | Mumbai Suburban | CC006000000141206 | 2019 | Oct | Complete | N | N | 1 |
CC006000000161224 | 2019 | Oct | Complete | N | N | 1 | ||||
GLASSWOOD REALTY PRIVATE LIMITED Total | 2 | |||||||||
Global Developers | P51800010825 | Konkan | Mumbai Suburban | CC006000000195672 | 2021 | Feb | Hearing Schedule | N | N | 1 |
Global Developers Total | 1 | |||||||||
GLOBAL HOUSING VENTURES | P51800009478 | Konkan | Mumbai Suburban | CC006000000056961 | 2018 | Dec | Complete | N | N | 1 |
CC006000000196714 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
GLOBAL HOUSING VENTURES Total | 2 | |||||||||
GLOBAL ORICON DEVELOPERS | P51800003722 | Konkan | Mumbai Suburban | CC006000000100462 | 2019 | Aug | Complete | N | N | 1 |
GLOBAL ORICON DEVELOPERS Total | 1 | |||||||||
Glomore constructions | P51800006404 | Konkan | Mumbai Suburban | CC006000000056785 | 2018 | Oct | Complete | N | N | 1 |
CC006000000089809 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100552 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000193435 | 2020 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000194207 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194290 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000195142 | 2020 | Dec | Complete | Y | N | 1 | ||||
CC006000000195183 | 2020 | Dec | Complete | Y | N | 1 | ||||
CC006000000195186 | 2020 | Dec | Complete | Y | N | 1 | ||||
CC006000000195187 | 2020 | Dec | Complete | Y | N | 1 | ||||
CC006000000195492 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195504 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000195637 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000195705 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195794 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196543 | 2021 | May | Complete | Y | N | 1 | ||||
CC006000000196546 | 2021 | May | Complete | Y | N | 1 | ||||
CC006000000197815 | 2021 | Jul | Complete | N | N | 1 | ||||
CC006000000198128 | 2021 | Sep | Complete | N | N | 1 | ||||
CC006000000198709 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199141 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209496 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209500 | 2021 | Dec | Pending | N | N | 1 | ||||
CC006000000209508 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
Glomore constructions Total | 24 | |||||||||
Godrej Landmark Redevelopers Private Limited | P51800001107 | Konkan | Mumbai Suburban | CC006000000043992 | 2018 | Apr | Complete | N | N | 1 |
CC006000000043993 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000054576 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056249 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056998 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000079338 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089654 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000192640 | 2020 | Feb | Pending | N | N | 1 | ||||
CC006000000192676 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000193732 | 2020 | Aug | Pending | N | N | 1 | ||||
CC006000000193869 | 2020 | Aug | Pending | N | N | 1 | ||||
CC006000000193881 | 2020 | Sep | Pending | N | N | 1 | ||||
Godrej Landmark Redevelopers Private Limited Total | 12 | |||||||||
Godrej Projects Development Limited | P51800023915 | Konkan | Mumbai Suburban | CC006000000198261 | 2021 | Sep | Hearing Schedule | N | N | 1 |
Godrej Projects Development Limited Total | 1 | |||||||||
Godrej Properties Limited | P51800000158 | Konkan | Mumbai Suburban | CC006000000193718 | 2020 | Aug | Hearing Schedule | N | N | 1 |
P51800000161 | Konkan | Mumbai Suburban | CC006000000141048 | 2019 | Dec | Complete | N | N | 1 | |
P51800000165 | Konkan | Mumbai Suburban | CC006000000001024 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000151210 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171900 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000198870 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
P51800028364 | Konkan | Mumbai Suburban | CC006000000197011 | 2021 | May | Hearing Schedule | N | N | 1 | |
Godrej Properties Limited Total | 7 | |||||||||
Godrej Redevelopers (Mumbai) Pvt. Ltd. | P51800000519 | Konkan | Mumbai Suburban | CC006000000193227 | 2020 | May | Complete | N | N | 1 |
CC006000000198485 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Godrej Redevelopers (Mumbai) Pvt. Ltd. Total | 2 | |||||||||
GOODBUILD (INDIA) PRIVATE LIMITED | P51800004539 | Konkan | Mumbai Suburban | CC006000000079440 | 2019 | May | Complete | N | N | 1 |
GOODBUILD (INDIA) PRIVATE LIMITED Total | 1 | |||||||||
Grace Estate Builders | P51800007498 | Konkan | Mumbai Suburban | CC006000000078992 | 2019 | Apr | Complete | N | N | 1 |
Grace Estate Builders Total | 1 | |||||||||
Grace Estate Development Venture | P51800010438 | Konkan | Mumbai Suburban | CC006000000192349 | 2020 | Feb | Hearing Schedule | N | N | 1 |
Grace Estate Development Venture Total | 1 | |||||||||
GRACE URBAN DEVELOPMENT CORPORATION | P51800012210 | Konkan | Mumbai Suburban | CC006000000078369 | 2019 | Mar | Complete | Y | N | 1 |
GRACE URBAN DEVELOPMENT CORPORATION Total | 1 | |||||||||
Greenery Rock LLP | P51800001980 | Konkan | Mumbai Suburban | CC006000000012157 | 2017 | Nov | Complete | N | N | 1 |
Greenery Rock LLP Total | 1 | |||||||||
GURUASHISH CONSTRUCTION PRIVATE LIMITED | P51800011383 | Konkan | Mumbai Suburban | CC006000000001144 | 2017 | Oct | Complete | N | N | 1 |
CC006000000055533 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000141121 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161296 | 2019 | Oct | Complete | N | N | 1 | ||||
GURUASHISH CONSTRUCTION PRIVATE LIMITED Total | 4 | |||||||||
Gurukrupa Developers | P51800003522 | Konkan | Mumbai Suburban | CC006000000056195 | 2018 | Sep | Complete | N | N | 1 |
CC006000000196178 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000197881 | 2021 | Aug | Complete | N | N | 1 | ||||
Gurukrupa Developers Total | 3 | |||||||||
Gurumauli Developers | P51800007074 | Konkan | Mumbai Suburban | CC006000000078736 | 2019 | Apr | Complete | N | N | 1 |
CC006000000161245 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000192281 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
Gurumauli Developers Total | 3 | |||||||||
H RISHABRAJ DEVELOPERS | P51800010479 | Konkan | Mumbai Suburban | CC006000000000615 | 2017 | Sep | Complete | N | N | 1 |
CC006000000000682 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000804 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000023601 | 2018 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000054948 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055836 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056539 | 2018 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000100412 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100413 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100414 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000100415 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000161282 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000161285 | 2019 | Oct | Complete | N | N | 1 | ||||
CC006000000171810 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000197465 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197628 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000198655 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199126 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000199135 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000209606 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
H RISHABRAJ DEVELOPERS Total | 20 | |||||||||
H.K.PUJARA BUILDERS | P51800004626 | Konkan | Mumbai Suburban | CC006000000194656 | 2020 | Oct | Hearing Schedule | N | N | 1 |
H.K.PUJARA BUILDERS Total | 1 | |||||||||
HARI OM CONSTRUCTION | P51800010436 | Konkan | Mumbai Suburban | CC006000000194346 | 2020 | Oct | Hearing Schedule | N | N | 1 |
HARI OM CONSTRUCTION Total | 1 | |||||||||
Hari Om Developers | P51800010174 | Konkan | Mumbai Suburban | CC006000000000973 | 2017 | Oct | Complete | N | N | 1 |
CC006000000078308 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000197199 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000198113 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198114 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000209370 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
Hari Om Developers Total | 6 | |||||||||
Hariom Sayaji Properties LLP | P51800001550 | Konkan | Mumbai Suburban | CC006000000044056 | 2018 | Apr | Complete | N | N | 1 |
Hariom Sayaji Properties LLP Total | 1 | |||||||||
Haritara Construction Company | P51800004528 | Konkan | Mumbai Suburban | CC006000000110731 | 2019 | Aug | Hearing Schedule | N | N | 1 |
CC006000000192283 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192302 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
Haritara Construction Company Total | 3 | |||||||||
Heena Builders and Developers | P51800012140 | Konkan | Mumbai Suburban | CC006000000078819 | 2019 | Apr | Complete | N | N | 1 |
Heena Builders and Developers Total | 1 | |||||||||
Heena Lifestyles | P51800001533 | Konkan | Mumbai Suburban | CC006000000197586 | 2021 | Jul | Hearing Schedule | N | N | 1 |
P51800006989 | Konkan | Mumbai Suburban | CC006000000078661 | 2019 | May | Complete | Y | N | 1 | |
CC006000000078828 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079342 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079345 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089842 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000196940 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
Heena Lifestyles Total | 7 | |||||||||
Hemant Vinaykant Parikh | P51800012841 | Konkan | Mumbai Suburban | CC006000000023126 | 2018 | Jan | Complete | Y | N | 1 |
CC006000000056949 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000197732 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
Hemant Vinaykant Parikh Total | 3 | |||||||||
Heritage Lifestyles & Developers Pvt. Ltd.e | P51800001655 | Konkan | Mumbai Suburban | CC006000000193630 | 2020 | Aug | Complete | N | N | 1 |
Heritage Lifestyles & Developers Pvt. Ltd.e Total | 1 | |||||||||
Hetali Enterprises | P51800000826 | Konkan | Mumbai Suburban | CC006000000197390 | 2021 | Jun | Hearing Schedule | N | N | 1 |
Hetali Enterprises Total | 1 | |||||||||
HGP Community Pvt. Ltd. | P51800000143 | Konkan | Mumbai Suburban | CC006000000195344 | 2020 | Dec | Hearing Schedule | N | N | 1 |
CC006000000195345 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
P51800000154 | Konkan | Mumbai Suburban | CC006000000078227 | 2019 | Feb | Complete | N | N | 1 | |
CC006000000194898 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194902 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194904 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
P51800000405 | Konkan | Mumbai Suburban | CC006000000193403 | 2020 | Jul | Complete | N | N | 1 | |
CC006000000193406 | 2020 | Jul | Complete | N | N | 1 | ||||
HGP Community Pvt. Ltd. Total | 8 | |||||||||
Hillcrest Joint Venture | P51800002556 | Konkan | Mumbai Suburban | CC006000000056483 | 2018 | Oct | Complete | N | N | 1 |
CC006000000057119 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000078973 | 2019 | Apr | Complete | N | N | 1 | ||||
Hillcrest Joint Venture Total | 3 | |||||||||
HINDUSTAN BUILDER | P51800013658 | Konkan | Mumbai Suburban | CC006000000022858 | 2018 | Feb | Complete | N | N | 1 |
CC006000000110910 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000196832 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196838 | 2021 | Apr | Complete | N | N | 1 | ||||
HINDUSTAN BUILDER Total | 4 | |||||||||
HIRAL HOMES | P51800008326 | Konkan | Mumbai Suburban | CC006000000078169 | 2019 | Feb | Complete | Y | N | 1 |
CC006000000078306 | 2019 | Feb | Complete | Y | N | 1 | ||||
HIRAL HOMES Total | 2 | |||||||||
HIRANIMANTHAN BUILDERS AND DEVELOPERS | P51800003741 | Konkan | Mumbai Suburban | CC006000000196738 | 2021 | Apr | Hearing Schedule | N | N | 1 |
P51800008227 | Konkan | Mumbai Suburban | CC006000000198573 | 2021 | Oct | Hearing Schedule | N | N | 1 | |
HIRANIMANTHAN BUILDERS AND DEVELOPERS Total | 2 | |||||||||
HITECH HAFIZI TOWN DEVELOPERS | P51800015510 | Konkan | Mumbai Suburban | CC006000000141192 | 2019 | Oct | Complete | Y | N | 1 |
CC006000000196855 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
HITECH HAFIZI TOWN DEVELOPERS Total | 2 | |||||||||
HOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED | P51800029444 | Konkan | Mumbai Suburban | CC006000000198369 | 2021 | Sep | Hearing Schedule | N | N | 1 |
CC006000000198495 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198681 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
HOMAI MAHAL PREMISES CO-OP SOCIETY LIMITED Total | 3 | |||||||||
HORIZON DREAM HOMES PRIVATE LIMITED | P51800004409 | Konkan | Mumbai Suburban | CC006000000012252 | 2017 | Dec | Complete | Y | N | 1 |
P51800010972 | Konkan | Mumbai Suburban | CC006000000023166 | 2018 | Feb | Complete | Y | N | 1 | |
CC006000000192855 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
HORIZON DREAM HOMES PRIVATE LIMITED Total | 3 | |||||||||
HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD | P51800004431 | Konkan | Mumbai Suburban | CC006000000001925 | 2017 | Nov | Complete | N | N | 1 |
CC006000000044320 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000055159 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000056715 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000057653 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078776 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000078855 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079053 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079138 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000141004 | 2019 | Oct | Complete | N | N | 1 | ||||
P51800007283 | Konkan | Mumbai Suburban | CC006000000001716 | 2017 | Nov | Complete | N | N | 1 | |
CC006000000012325 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000023201 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023727 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000043978 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000054568 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054665 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055018 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055021 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055026 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055028 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055029 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055031 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055032 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055033 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055037 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055038 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055039 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055040 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055041 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055043 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055044 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055045 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055046 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055047 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055050 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055052 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055053 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055055 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055056 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055057 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055058 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055067 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055070 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055071 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000055082 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000055083 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055084 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055085 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055162 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055171 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055289 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055359 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055421 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055477 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055903 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055927 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055928 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055929 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055931 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055933 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055949 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055966 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055990 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056112 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056143 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056211 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056212 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056231 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056263 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056533 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056571 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056573 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056731 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056925 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057555 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000058032 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058048 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078434 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078637 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078756 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078757 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078981 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000078985 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000078986 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079031 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079070 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079080 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079082 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079083 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079126 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079130 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079225 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079227 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079287 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079294 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079321 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079339 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079385 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079415 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079449 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079451 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089539 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089627 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089636 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089641 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089667 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089674 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089727 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089728 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089740 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089818 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089877 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089923 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089946 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089974 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090047 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000090161 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100216 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100290 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100320 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100322 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100325 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000100344 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100359 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110632 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110646 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110684 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110689 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110725 | 2019 | Aug | Complete | N | N | 1 | ||||
P51800007809 | Konkan | Mumbai Suburban | CC006000000000192 | 2018 | Aug | Complete | N | N | 1 | |
CC006000000000483 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000023586 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023843 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000044555 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055794 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055915 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000056269 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056289 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056693 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000057294 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057417 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057865 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057919 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057936 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057952 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057955 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057962 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057973 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000057999 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058000 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058001 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058008 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058009 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058012 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058037 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000058058 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058104 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058130 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058138 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068146 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068147 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078190 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078231 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078267 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078305 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078335 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078816 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078831 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078843 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078857 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000078858 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079051 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000079093 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000100391 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000110644 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000141128 | 2019 | Oct | Complete | N | N | 1 | ||||
P51800007814 | Konkan | Mumbai Suburban | CC006000000057237 | 2019 | Feb | Complete | N | N | 1 | |
P51800009742 | Konkan | Mumbai Suburban | CC006000000000945 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000023933 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000057257 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057930 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058006 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000058118 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000068153 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078597 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000078862 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079052 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000089630 | 2019 | Jun | Complete | Y | N | 1 | ||||
P51800010758 | Konkan | Mumbai Suburban | CC006000000001570 | 2018 | Jul | Complete | N | N | 1 | |
CC006000000054859 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000054862 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000054863 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000054865 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000054988 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056977 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057998 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078891 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089749 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089750 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089752 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089753 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089755 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089756 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089757 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089758 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000089910 | 2019 | Aug | Complete | N | N | 1 | ||||
P51800012577 | Konkan | Mumbai Suburban | CC006000000012420 | 2017 | Dec | Complete | N | N | 1 | |
CC006000000057617 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000058129 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078674 | 2019 | Mar | Complete | N | N | 1 | ||||
P51800016598 | Konkan | Mumbai Suburban | CC006000000054831 | 2018 | Jun | Complete | Y | Y | 1 | |
CC006000000056981 | 2018 | Nov | Complete | Y | N | 1 | ||||
HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD Total | 213 | |||||||||
Hubtown Limited | P51800001202 | Konkan | Mumbai Suburban | CC006000000023060 | 2018 | Jan | Complete | N | N | 1 |
CC006000000023562 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023766 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000055636 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055638 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000055682 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000198299 | 2021 | Sep | Pending | N | N | 1 | ||||
P51800001465 | Konkan | Mumbai Suburban | CC006000000192315 | 2020 | Jan | Hearing Schedule | N | N | 1 | |
P51800002671 | Konkan | Mumbai Suburban | CC006000000196649 | 2021 | Apr | Pending | N | N | 1 | |
P51800005224 | Konkan | Mumbai Suburban | CC006000000193708 | 2020 | Aug | Pending | N | N | 1 | |
Hubtown Limited Total | 10 | |||||||||
HUGES REAL ESTATES DEVELOPERS LLP | P51800009485 | Konkan | Mumbai Suburban | CC006000000023510 | 2018 | Mar | Complete | N | N | 1 |
CC006000000194641 | 2020 | Oct | Pending | N | N | 1 | ||||
CC006000000195655 | 2021 | Jan | Complete | Y | N | 1 | ||||
CC006000000196616 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197699 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
HUGES REAL ESTATES DEVELOPERS LLP Total | 5 | |||||||||
ICON DEVELOPERS | P51800012300 | Konkan | Mumbai Suburban | CC006000000194355 | 2020 | Oct | Hearing Schedule | N | N | 1 |
ICON DEVELOPERS Total | 1 | |||||||||
Incline Realty Private Limited | P51800003582 | Konkan | Mumbai Suburban | CC006000000000179 | 2017 | Aug | Complete | N | N | 1 |
CC006000000023534 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000089995 | 2019 | Jul | Complete | N | N | 1 | ||||
Incline Realty Private Limited Total | 3 | |||||||||
Infina Ashapura Homes LLP | P51800007427 | Konkan | Mumbai Suburban | CC006000000054631 | 2018 | Jun | Complete | N | N | 1 |
CC006000000089960 | 2019 | Jul | Complete | N | N | 1 | ||||
Infina Ashapura Homes LLP Total | 2 | |||||||||
INNERSPACE | P51800007470 | Konkan | Mumbai Suburban | CC006000000056740 | 2018 | Nov | Complete | Y | Y | 1 |
CC006000000089683 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100327 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
INNERSPACE Total | 3 | |||||||||
Integrated Spaces Limited | P51800004521 | Konkan | Mumbai Suburban | CC006000000197800 | 2021 | Jul | Hearing Schedule | N | N | 1 |
Integrated Spaces Limited Total | 1 | |||||||||
IRENE EDWYN DMELLO | P51800013457 | Konkan | Mumbai Suburban | CC006000000001616 | 2017 | Oct | Complete | N | N | 1 |
CC006000000090048 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000171690 | 2019 | Nov | Complete | Y | N | 1 | ||||
CC006000000171764 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000182085 | 2020 | Jan | Hearing Schedule | Y | N | 1 | ||||
CC006000000182090 | 2020 | Jan | Hearing Schedule | Y | N | 1 | ||||
CC006000000193738 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193761 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193762 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193763 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198829 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
IRENE EDWYN DMELLO Total | 11 | |||||||||
ISPAT CORPORATION | P51800012754 | Konkan | Mumbai Suburban | CC006000000197600 | 2021 | Jul | Pending | N | N | 1 |
ISPAT CORPORATION Total | 1 | |||||||||
ITMC Developers Pvt. Ltd. | P51800006372 | Konkan | Mumbai Suburban | CC006000000000525 | 2017 | Oct | Complete | Y | Y | 1 |
CC006000000000599 | 2017 | Sep | Complete | Y | N | 1 | ||||
CC006000000001106 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001140 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001155 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001403 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001413 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001435 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001478 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001678 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012211 | 2017 | Dec | Complete | Y | N | 1 | ||||
CC006000000054796 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000192515 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192965 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000196490 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196544 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196667 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197277 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197677 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000198231 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000209517 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000209519 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
ITMC Developers Pvt. Ltd. Total | 22 | |||||||||
J V REALTY AND DEVELOPERS | P51800008691 | Konkan | Mumbai Suburban | CC006000000000949 | 2017 | Sep | Complete | N | N | 1 |
J V REALTY AND DEVELOPERS Total | 1 | |||||||||
Jaliyan Developer | P51800012925 | Konkan | Mumbai Suburban | CC006000000192506 | 2020 | Feb | Complete | N | N | 1 |
Jaliyan Developer Total | 1 | |||||||||
Jangid Home pvt Ltd | P51800008642 | Konkan | Mumbai Suburban | CC006000000054954 | 2018 | Jun | Complete | N | N | 1 |
Jangid Home pvt Ltd Total | 1 | |||||||||
Jasmina Constructions Pvt. Ltd. | P51800005876 | Konkan | Mumbai Suburban | CC006000000197093 | 2021 | May | Hearing Schedule | N | N | 1 |
CC006000000197095 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
Jasmina Constructions Pvt. Ltd. Total | 2 | |||||||||
JASPAL SINGH SURI | P51800014152 | Konkan | Mumbai Suburban | CC006000000078507 | 2019 | Mar | Complete | N | N | 1 |
CC006000000079229 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000100384 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100386 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000197033 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000197034 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
JASPAL SINGH SURI Total | 6 | |||||||||
Jay Construction India | P51800008046 | Konkan | Mumbai Suburban | CC006000000194148 | 2020 | Sep | Hearing Schedule | N | N | 1 |
CC006000000198921 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Jay Construction India Total | 2 | |||||||||
Jay Vee Construction | P51800009021 | Konkan | Mumbai Suburban | CC006000000056235 | 2018 | Sep | Complete | Y | N | 1 |
CC006000000078180 | 2019 | Feb | Complete | Y | N | 1 | ||||
Jay Vee Construction Total | 2 | |||||||||
JAYANT SONI | P51800005022 | Konkan | Mumbai Suburban | CC006000000023529 | 2018 | May | Complete | N | N | 1 |
CC006000000141085 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000196850 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000198877 | 2021 | Nov | Pending | N | N | 1 | ||||
JAYANT SONI Total | 4 | |||||||||
JE AND VEE INFRASTRUCTURE | P51800020431 | Konkan | Mumbai Suburban | CC006000000209463 | 2021 | Dec | Pending | N | N | 1 |
JE AND VEE INFRASTRUCTURE Total | 1 | |||||||||
JEEVANDEEP DEVELOPERS | P51800014999 | Konkan | Mumbai Suburban | CC006000000079101 | 2019 | May | Complete | N | N | 1 |
CC006000000079270 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000196276 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196423 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000196510 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000197195 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
JEEVANDEEP DEVELOPERS Total | 6 | |||||||||
JINAM K2 REALTORS | P51800005864 | Konkan | Mumbai Suburban | CC006000000195873 | 2021 | Feb | Hearing Schedule | N | N | 1 |
JINAM K2 REALTORS Total | 1 | |||||||||
Jitendra Shankerlal Brahmbhatt | P51800003330 | Konkan | Mumbai Suburban | CC006000000078818 | 2019 | Apr | Complete | N | N | 1 |
P51800003375 | Konkan | Mumbai Suburban | CC006000000171622 | 2019 | Nov | Complete | N | N | 1 | |
CC006000000192705 | 2020 | Feb | Pending | N | N | 1 | ||||
CC006000000194746 | 2020 | Nov | Pending | N | N | 1 | ||||
CC006000000195041 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000195268 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000197079 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197080 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197081 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000198121 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198659 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198787 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000199122 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000199137 | 2021 | Dec | Pending | N | N | 1 | ||||
P51800003502 | Konkan | Mumbai Suburban | CC006000000001577 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000044469 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000056344 | 2018 | Sep | Complete | N | N | 1 | ||||
Jitendra Shankerlal Brahmbhatt Total | 17 | |||||||||
JMS REALTY | P51800009537 | Konkan | Mumbai Suburban | CC006000000171547 | 2019 | Nov | Complete | N | N | 1 |
JMS REALTY Total | 1 | |||||||||
JOHN DENNIS CONSTRUCTIONS PVT. LTD. | P51800022435 | Konkan | Mumbai Suburban | CC006000000209639 | 2022 | Jan | Pending | N | N | 1 |
JOHN DENNIS CONSTRUCTIONS PVT. LTD. Total | 1 | |||||||||
JOY AND SAYLA REALTORS | P51800012448 | Konkan | Mumbai Suburban | CC006000000171913 | 2019 | Dec | Complete | N | N | 1 |
JOY AND SAYLA REALTORS Total | 1 | |||||||||
Joynest Premises Private Limited | P51800002350 | Konkan | Mumbai Suburban | CC006000000012210 | 2017 | Nov | Complete | N | N | 1 |
P51800002373 | Konkan | Mumbai Suburban | CC006000000055495 | 2018 | Jul | Complete | N | N | 1 | |
CC006000000055685 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000196920 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197603 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
Joynest Premises Private Limited Total | 5 | |||||||||
JP Infra (Mumbai) Pvt. Ltd. | P51800001488 | Konkan | Mumbai Suburban | CC006000000012236 | 2017 | Nov | Complete | N | N | 1 |
CC006000000023962 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044425 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055486 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056678 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056681 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056687 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056688 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056872 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000056873 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000056874 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000056875 | 2018 | Nov | Complete | N | N | 1 | ||||
CC006000000057929 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000110735 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000171911 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192338 | 2020 | Feb | Complete | N | N | 1 | ||||
JP Infra (Mumbai) Pvt. Ltd. Total | 16 | |||||||||
JVPD Properties Private Limited | P51800011181 | Konkan | Mumbai Suburban | CC006000000000367 | 2017 | Oct | Complete | N | N | 1 |
CC006000000000381 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000505 | 2017 | Sep | Complete | Y | N | 1 | ||||
CC006000000000712 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000000737 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000776 | 2017 | Sep | Complete | Y | Y | 1 | ||||
CC006000000000794 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000936 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000000969 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000994 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000001312 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001348 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001358 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001440 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001460 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001502 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001504 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001505 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001523 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001527 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001567 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001574 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001576 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001578 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001583 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001587 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001595 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001599 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001601 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001605 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001607 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001610 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001613 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001615 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001617 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001619 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001621 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001622 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001625 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001626 | 2017 | Oct | Complete | Y | N | 1 | ||||
CC006000000001629 | 2017 | Oct | Complete | Y | Y | 1 | ||||
CC006000000001631 | 2017 | Nov | Complete | Y | N | 1 | ||||
CC006000000001638 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001651 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001676 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000001700 | 2017 | Nov | Complete | Y | N | 1 | ||||
CC006000000001728 | 2017 | Nov | Complete | Y | N | 1 | ||||
CC006000000001730 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001731 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001758 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001770 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001776 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001814 | 2017 | Nov | Complete | Y | Y | 1 | ||||
CC006000000001962 | 2017 | Nov | Complete | Y | N | 1 | ||||
CC006000000012138 | 2017 | Dec | Complete | Y | Y | 1 | ||||
CC006000000012225 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000012250 | 2017 | Dec | Complete | Y | Y | 1 | ||||
CC006000000012507 | 2017 | Dec | Complete | N | N | 1 | ||||
CC006000000022870 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000023014 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000023020 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000023029 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000023169 | 2018 | Jan | Complete | Y | Y | 1 | ||||
CC006000000023329 | 2018 | Feb | Complete | Y | N | 1 | ||||
CC006000000023490 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023657 | 2018 | Mar | Complete | Y | Y | 1 | ||||
CC006000000023679 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000023797 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000044007 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000044247 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000044273 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000044316 | 2018 | Apr | Complete | Y | Y | 1 | ||||
CC006000000044317 | 2018 | Apr | Complete | Y | N | 1 | ||||
CC006000000044403 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000054590 | 2018 | May | Complete | Y | Y | 1 | ||||
CC006000000054751 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000054784 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054790 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054791 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000054793 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054795 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054800 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054802 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054806 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000054905 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000055049 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000055090 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000055148 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055150 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055153 | 2018 | Jul | Complete | Y | Y | 1 | ||||
CC006000000055154 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055268 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055271 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055631 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055738 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000055902 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055939 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000055940 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000056065 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000056077 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000056183 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000056226 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000056278 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000056279 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000056371 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056374 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000056379 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056407 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000056413 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056519 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056602 | 2018 | Dec | Complete | Y | Y | 1 | ||||
CC006000000056683 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000056684 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000056685 | 2018 | Oct | Complete | Y | Y | 1 | ||||
CC006000000057817 | 2019 | Feb | Complete | Y | Y | 1 | ||||
CC006000000057818 | 2019 | Feb | Complete | Y | Y | 1 | ||||
CC006000000078874 | 2019 | Apr | Complete | Y | Y | 1 | ||||
CC006000000078894 | 2019 | Apr | Complete | Y | Y | 1 | ||||
CC006000000090041 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000100227 | 2019 | Jul | Complete | Y | Y | 1 | ||||
CC006000000100410 | 2019 | Aug | Complete | Y | Y | 1 | ||||
CC006000000110798 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141027 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141028 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141134 | 2019 | Oct | Complete | Y | Y | 1 | ||||
CC006000000192243 | 2020 | Jan | Complete | Y | Y | 1 | ||||
CC006000000192328 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192381 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192384 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192385 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192388 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192389 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192391 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192393 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192395 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192408 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192412 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192432 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192433 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192434 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192435 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192437 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192438 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192439 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192440 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192466 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192467 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192472 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192473 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192474 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192475 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192479 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192480 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192481 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192482 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192487 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192493 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192504 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192524 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192546 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192547 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192570 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192571 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192572 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192574 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192577 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192579 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192614 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192615 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192616 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192617 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192665 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192666 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192668 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192669 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192671 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192672 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192673 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192674 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192675 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192677 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192678 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192679 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192680 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192681 | 2020 | Feb | Complete | Y | Y | 1 | ||||
CC006000000192682 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192684 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192685 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192687 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192698 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192701 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000192717 | 2020 | Feb | Complete | Y | N | 1 | ||||
CC006000000192827 | 2020 | Mar | Complete | Y | N | 1 | ||||
CC006000000192863 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192962 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192979 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192985 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192990 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000192991 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193001 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000193702 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193840 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000194546 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000196346 | 2021 | Mar | Complete | N | N | 1 | ||||
CC006000000197075 | 2021 | May | Complete | N | N | 1 | ||||
CC006000000197204 | 2021 | Jul | Complete | N | N | 1 | ||||
CC006000000198422 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000199138 | 2021 | Dec | Pending | N | N | 1 | ||||
JVPD Properties Private Limited Total | 208 | |||||||||
JYOTI BUILDERS | P51800006438 | Konkan | Mumbai Suburban | CC006000000197788 | 2021 | Jul | Hearing Schedule | N | N | 1 |
JYOTI BUILDERS Total | 1 | |||||||||
K D Builders | P51800008606 | Konkan | Mumbai Suburban | CC006000000012191 | 2017 | Dec | Complete | N | N | 1 |
K D Builders Total | 1 | |||||||||
K D Lite Developers Pvt Ltd | P51800004525 | Konkan | Mumbai Suburban | CC006000000001969 | 2017 | Nov | Complete | N | N | 1 |
CC006000000023645 | 2018 | Mar | Complete | N | N | 1 | ||||
CC006000000023650 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000054739 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000079466 | 2019 | Jun | Complete | Y | Y | 1 | ||||
CC006000000089790 | 2019 | Jun | Complete | Y | Y | 1 | ||||
CC006000000089791 | 2019 | Jun | Complete | Y | Y | 1 | ||||
CC006000000089792 | 2019 | Jun | Complete | Y | N | 1 | ||||
CC006000000089793 | 2019 | Jun | Complete | Y | N | 1 | ||||
CC006000000110738 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000110741 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000141086 | 2019 | Oct | Complete | Y | Y | 1 | ||||
CC006000000171731 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000171872 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000192128 | 2020 | Jan | Complete | Y | N | 1 | ||||
CC006000000192254 | 2020 | Jan | Complete | N | N | 1 | ||||
CC006000000192471 | 2020 | Feb | Pending | N | N | 1 | ||||
CC006000000193362 | 2020 | Jun | Pending | N | N | 1 | ||||
CC006000000193364 | 2020 | Jun | Pending | N | N | 1 | ||||
CC006000000193442 | 2020 | Jul | Complete | Y | N | 1 | ||||
CC006000000194000 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000194214 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000194392 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194639 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000194801 | 2020 | Nov | Complete | N | N | 1 | ||||
CC006000000194974 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194975 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000194976 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195564 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000197442 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197630 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197841 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198025 | 2021 | Aug | Pending | N | N | 1 | ||||
K D Lite Developers Pvt Ltd Total | 33 | |||||||||
K K KRISHNAN CONSTRUCTION COMPANY PVT LTD | P51800008657 | Konkan | Mumbai Suburban | CC006000000141044 | 2019 | Sep | Complete | N | N | 1 |
P51800009326 | Konkan | Mumbai Suburban | CC006000000194978 | 2020 | Nov | Hearing Schedule | N | N | 1 | |
CC006000000199333 | 2021 | Dec | Hearing Schedule | N | N | 1 | ||||
K K KRISHNAN CONSTRUCTION COMPANY PVT LTD Total | 3 | |||||||||
K MANIAR | P51800009020 | Konkan | Mumbai Suburban | CC006000000193325 | 2021 | Dec | Pending | N | N | 1 |
CC006000000193388 | 2021 | Dec | Pending | N | N | 1 | ||||
K MANIAR Total | 2 | |||||||||
K Mordani Constructions LLP | P51800006835 | Konkan | Mumbai Suburban | CC006000000056104 | 2018 | Sep | Complete | N | N | 1 |
K Mordani Constructions LLP Total | 1 | |||||||||
K T GROUP | P51800003447 | Konkan | Mumbai Suburban | CC006000000044504 | 2018 | May | Complete | Y | Y | 1 |
CC006000000193259 | 2020 | Jun | Hearing Schedule | N | N | 1 | ||||
P51800004002 | Konkan | Mumbai Suburban | CC006000000078603 | 2019 | Jun | Complete | N | N | 1 | |
P51800005494 | Konkan | Mumbai Suburban | CC006000000001001 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000078347 | 2019 | Mar | Complete | N | N | 1 | ||||
CC006000000209427 | 2021 | Dec | Pending | N | N | 1 | ||||
P51800006904 | Konkan | Mumbai Suburban | CC006000000000384 | 2018 | Feb | Complete | Y | N | 1 | |
CC006000000000983 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000054625 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054743 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000054970 | 2018 | Jun | Complete | Y | Y | 1 | ||||
CC006000000055878 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000089670 | 2019 | Jun | Complete | N | N | 1 | ||||
P51800008083 | Konkan | Mumbai Suburban | CC006000000055648 | 2018 | Aug | Complete | N | N | 1 | |
CC006000000057895 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000089870 | 2019 | Jul | Complete | N | N | 1 | ||||
P51800008567 | Konkan | Mumbai Suburban | CC006000000012764 | 2018 | Feb | Complete | N | N | 1 | |
CC006000000023000 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000023732 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000023733 | 2018 | Mar | Complete | Y | N | 1 | ||||
CC006000000044428 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000044498 | 2018 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000054624 | 2018 | May | Complete | Y | N | 1 | ||||
CC006000000054804 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000055011 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000057554 | 2019 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000079483 | 2019 | May | Hearing Schedule | N | N | 1 | ||||
K T GROUP Total | 27 | |||||||||
K. Nakrani Associates | P51800011401 | Konkan | Mumbai Suburban | CC006000000197814 | 2021 | Jul | Hearing Schedule | N | N | 1 |
K. Nakrani Associates Total | 1 | |||||||||
KABRA AND ASSOCIATES | P51800005550 | Konkan | Mumbai Suburban | CC006000000057380 | 2018 | Dec | Complete | N | N | 1 |
KABRA AND ASSOCIATES Total | 1 | |||||||||
KAILASH PUNWASI YADAV | P51800016497 | Konkan | Mumbai Suburban | CC006000000057574 | 2019 | Jan | Complete | N | N | 1 |
CC006000000057584 | 2019 | Jan | Complete | N | N | 1 | ||||
KAILASH PUNWASI YADAV Total | 2 | |||||||||
Kalpataru Properties Pvt. Ltd. | P51800004029 | Konkan | Mumbai Suburban | CC006000000199114 | 2021 | Nov | Hearing Schedule | N | N | 1 |
Kalpataru Properties Pvt. Ltd. Total | 1 | |||||||||
Kalpataru Property Ventures LLP | P51800000442 | Konkan | Mumbai Suburban | CC006000000195252 | 2020 | Dec | Pending | N | N | 1 |
Kalpataru Property Ventures LLP Total | 1 | |||||||||
Kalpataru Retail Ventures Private Limited | P51800023768 | Konkan | Mumbai Suburban | CC006000000194935 | 2020 | Nov | Pending | N | N | 1 |
CC006000000198283 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
Kalpataru Retail Ventures Private Limited Total | 2 | |||||||||
KAMAL JAYANTILAL JOSHI | P51800011783 | Konkan | Mumbai Suburban | CC006000000161451 | 2019 | Nov | Complete | N | N | 1 |
CC006000000197956 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
KAMAL JAYANTILAL JOSHI Total | 2 | |||||||||
KAMALNATH UNIVERSAL PRIVATE LIMITED | P51800005722 | Konkan | Mumbai Suburban | CC006000000001149 | 2017 | Nov | Complete | N | N | 1 |
CC006000000001311 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001558 | 2017 | Oct | Complete | N | N | 1 | ||||
KAMALNATH UNIVERSAL PRIVATE LIMITED Total | 3 | |||||||||
Kamla Ranjit Singh | P51800012677 | Konkan | Mumbai Suburban | CC006000000023382 | 2018 | Feb | Complete | Y | Y | 1 |
CC006000000023384 | 2018 | Feb | Complete | Y | Y | 1 | ||||
CC006000000023385 | 2018 | Feb | Complete | Y | Y | 1 | ||||
Kamla Ranjit Singh Total | 3 | |||||||||
KANAKIA SPACES REALTY PRIVATE LIMITED | P51800000121 | Konkan | Mumbai Suburban | CC006000000055860 | 2018 | Aug | Complete | N | N | 1 |
CC006000000055861 | 2018 | Aug | Complete | N | N | 1 | ||||
P51800000122 | Konkan | Mumbai Suburban | CC006000000057782 | 2019 | Jan | Complete | N | N | 1 | |
CC006000000110693 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000161349 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000161430 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000161431 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000171717 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000194185 | 2020 | Sep | Complete | N | N | 1 | ||||
CC006000000195779 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000197675 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
P51800000123 | Konkan | Mumbai Suburban | CC006000000199225 | 2021 | Dec | Hearing Schedule | N | N | 1 | |
P51800000223 | Konkan | Mumbai Suburban | CC006000000044363 | 2018 | Jun | Complete | N | N | 1 | |
CC006000000056501 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000078808 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000120983 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000192401 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000192634 | 2020 | Feb | Complete | N | N | 1 | ||||
CC006000000197696 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
P51800000224 | Konkan | Mumbai Suburban | CC006000000193848 | 2020 | Sep | Hearing Schedule | N | N | 1 | |
CC006000000195718 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000196165 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000197906 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
P51800000388 | Konkan | Mumbai Suburban | CC006000000000726 | 2018 | Jan | Complete | N | N | 1 | |
CC006000000078222 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000194985 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195713 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000195877 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000196585 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196586 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000196587 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
P51800008343 | Konkan | Mumbai Suburban | CC006000000079462 | 2019 | May | Complete | N | N | 1 | |
CC006000000171512 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000195363 | 2020 | Dec | Complete | N | N | 1 | ||||
P51800018007 | Konkan | Mumbai Suburban | CC006000000196906 | 2021 | May | Hearing Schedule | N | N | 1 | |
P51800018113 | Konkan | Mumbai Suburban | CC006000000195895 | 2021 | Feb | Hearing Schedule | N | N | 1 | |
CC006000000195896 | 2021 | Feb | Hearing Schedule | N | N | 1 | ||||
P51800022936 | Konkan | Mumbai Suburban | CC006000000193796 | 2020 | Sep | Hearing Schedule | N | N | 1 | |
KANAKIA SPACES REALTY PRIVATE LIMITED Total | 38 | |||||||||
KANDIVALI PRITI SANGAM CO-OP HOS SOC LTD | P51800011235 | Konkan | Mumbai Suburban | CC006000000079446 | 2019 | May | Complete | N | N | 1 |
CC006000000195537 | 2021 | Jan | Complete | N | N | 1 | ||||
KANDIVALI PRITI SANGAM CO-OP HOS SOC LTD Total | 2 | |||||||||
KANDUR CORPORATION | P51800006880 | Konkan | Mumbai Suburban | CC006000000012561 | 2017 | Dec | Complete | N | N | 1 |
KANDUR CORPORATION Total | 1 | |||||||||
KARAN DEVELOPERS | P51800006196 | Konkan | Mumbai Suburban | CC006000000078924 | 2019 | Apr | Complete | N | N | 1 |
KARAN DEVELOPERS Total | 1 | |||||||||
Karmvir Mumbai Housing Private Limited | P51800007330 | Konkan | Mumbai Suburban | CC006000000198297 | 2021 | Sep | Hearing Schedule | N | N | 1 |
CC006000000198317 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198722 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198972 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
Karmvir Mumbai Housing Private Limited Total | 4 | |||||||||
KARVIR & RAMBHIA PROPERTIES PRIVATE LIMITED | P51800008237 | Konkan | Mumbai Suburban | CC006000000194039 | 2020 | Sep | Hearing Schedule | N | N | 1 |
CC006000000194054 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194088 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
KARVIR & RAMBHIA PROPERTIES PRIVATE LIMITED Total | 3 | |||||||||
KASHTAMANDUP DEVELOPERS PVT LTD | P51800001863 | Konkan | Mumbai Suburban | CC006000000090163 | 2019 | Aug | Complete | N | N | 1 |
CC006000000196751 | 2021 | Apr | Complete | N | N | 1 | ||||
CC006000000196788 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
KASHTAMANDUP DEVELOPERS PVT LTD Total | 3 | |||||||||
KAVYA CONSTRUCTION COMPANY | P51800007183 | Konkan | Mumbai Suburban | CC006000000044036 | 2018 | Apr | Complete | Y | N | 1 |
CC006000000100564 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000196989 | 2021 | May | Pending | N | N | 1 | ||||
KAVYA CONSTRUCTION COMPANY Total | 3 | |||||||||
KBJ Developers Private Limited | P51800001933 | Konkan | Mumbai Suburban | CC006000000000643 | 2017 | Sep | Complete | N | N | 1 |
CC006000000023540 | 2018 | Mar | Complete | N | N | 1 | ||||
KBJ Developers Private Limited Total | 2 | |||||||||
KCD Heritage Private Limited | P51800017307 | Konkan | Mumbai Suburban | CC006000000079132 | 2019 | May | Complete | N | N | 1 |
KCD Heritage Private Limited Total | 1 | |||||||||
KDI HOLDINGS PVT. LTD. | P51800004899 | Konkan | Mumbai Suburban | CC006000000171802 | 2019 | Dec | Complete | N | N | 1 |
KDI HOLDINGS PVT. LTD. Total | 1 | |||||||||
Keemaya Build Private Limited | P51800007085 | Konkan | Mumbai Suburban | CC006000000012175 | 2017 | Nov | Complete | N | N | 1 |
CC006000000195661 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000196215 | 2021 | Jun | Pending | N | N | 1 | ||||
Keemaya Build Private Limited Total | 3 | |||||||||
KERSI JAMSHED RANDERIA | P51800009207 | Konkan | Mumbai Suburban | CC006000000209732 | 2022 | Jan | Hearing Schedule | N | N | 1 |
CC006000000209739 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000209740 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000209741 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000209743 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000209745 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
KERSI JAMSHED RANDERIA Total | 6 | |||||||||
Keystone Realtors Private Limited | P51800003590 | Konkan | Mumbai Suburban | CC006000000068145 | 2019 | Feb | Complete | N | N | 1 |
CC006000000078529 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000110848 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000193180 | 2020 | Apr | Complete | N | N | 1 | ||||
CC006000000196135 | 2021 | Feb | Complete | N | N | 1 | ||||
Keystone Realtors Private Limited Total | 5 | |||||||||
Keystone Realtors Pvt. Ltd. | P51800001433 | Konkan | Mumbai Suburban | CC006000000056365 | 2018 | Sep | Complete | N | N | 1 |
CC006000000110720 | 2019 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193631 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
P51800011978 | Konkan | Mumbai Suburban | CC006000000000521 | 2017 | Sep | Complete | N | N | 1 | |
CC006000000044483 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000054613 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000079040 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000089669 | 2019 | Jun | Complete | N | N | 1 | ||||
Keystone Realtors Pvt. Ltd. Total | 8 | |||||||||
KHOKER SYNERGY DEVELOPERS | P51800006143 | Konkan | Mumbai Suburban | CC006000000161348 | 2019 | Oct | Complete | N | N | 1 |
CC006000000161350 | 2019 | Oct | Complete | N | N | 1 | ||||
KHOKER SYNERGY DEVELOPERS Total | 2 | |||||||||
KINGS EMPIRE HEIGHTS PVT LTD | P51800004044 | Konkan | Mumbai Suburban | CC006000000000261 | 2017 | Aug | Complete | N | N | 1 |
CC006000000023443 | 2018 | Feb | Complete | N | N | 1 | ||||
KINGS EMPIRE HEIGHTS PVT LTD Total | 2 | |||||||||
KIRTI JUGRAJ KANTHER | P51800003738 | Konkan | Mumbai Suburban | CC006000000195418 | 2020 | Dec | Complete | N | N | 1 |
KIRTI JUGRAJ KANTHER Total | 1 | |||||||||
Kiyana Ventures LLP | P51800000482 | Konkan | Mumbai Suburban | CC006000000110892 | 2019 | Dec | Hearing Schedule | N | N | 1 |
CC006000000171610 | 2019 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000192312 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192945 | 2020 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000193698 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000194344 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000195075 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000198312 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198846 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000209676 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
P51800000579 | Konkan | Mumbai Suburban | CC006000000000993 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000044145 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000171744 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192216 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192221 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192305 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192306 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192307 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192308 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000193699 | 2020 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000193971 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194043 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000194077 | 2020 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000195374 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195412 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195424 | 2021 | Jan | Complete | N | N | 1 | ||||
CC006000000196415 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196826 | 2021 | May | Hearing Schedule | N | N | 1 | ||||
CC006000000196869 | 2021 | Jun | Hearing Schedule | N | N | 1 | ||||
CC006000000197455 | 2021 | Jul | Complete | N | N | 1 | ||||
CC006000000197569 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197928 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198394 | 2021 | Oct | Pending | N | N | 1 | ||||
CC006000000209588 | 2022 | Jan | Hearing Schedule | N | N | 1 | ||||
P51800000591 | Konkan | Mumbai Suburban | CC006000000023575 | 2018 | Mar | Complete | N | N | 1 | |
CC006000000023939 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000141045 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000171743 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000193053 | 2020 | Mar | Complete | N | N | 1 | ||||
CC006000000194969 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000195089 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195098 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000195230 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000197295 | 2021 | Jun | Complete | N | N | 1 | ||||
CC006000000197584 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197604 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000198449 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
P51800000810 | Konkan | Mumbai Suburban | CC006000000000702 | 2017 | Sep | Complete | N | N | 1 | |
CC006000000193027 | 2020 | Mar | Pending | N | N | 1 | ||||
CC006000000194363 | 2020 | Oct | Complete | N | N | 1 | ||||
CC006000000196695 | 2021 | Apr | Pending | N | N | 1 | ||||
CC006000000196899 | 2021 | May | Complete | N | N | 1 | ||||
CC006000000197494 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197497 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000198191 | 2021 | Sep | Pending | N | N | 1 | ||||
Kiyana Ventures LLP Total | 55 | |||||||||
Klassik Vinyl Products LLP | P51800020262 | Konkan | Mumbai Suburban | CC006000000209645 | 2022 | Jan | Pending | N | N | 1 |
Klassik Vinyl Products LLP Total | 1 | |||||||||
Kohinoor Developers | P51800003258 | Konkan | Mumbai Suburban | CC006000000000189 | 2017 | Sep | Complete | N | N | 1 |
CC006000000001647 | 2017 | Nov | Complete | N | N | 1 | ||||
CC006000000044153 | 2018 | Apr | Complete | N | N | 1 | ||||
CC006000000044509 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000055213 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055542 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000055561 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000056216 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056250 | 2018 | Sep | Complete | Y | Y | 1 | ||||
CC006000000056502 | 2018 | Oct | Complete | Y | N | 1 | ||||
CC006000000056513 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056580 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056819 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000056856 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057336 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000057827 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057964 | 2019 | Feb | Complete | N | N | 1 | ||||
CC006000000078984 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079033 | 2019 | Apr | Complete | Y | N | 1 | ||||
CC006000000089781 | 2019 | Jun | Complete | N | N | 1 | ||||
CC006000000100248 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000141009 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141014 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000141122 | 2019 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000171555 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000171556 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000192236 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192258 | 2020 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000192898 | 2021 | Jan | Hearing Schedule | N | N | 1 | ||||
CC006000000194109 | 2020 | Sep | Pending | N | N | 1 | ||||
CC006000000195367 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
CC006000000196939 | 2021 | May | Pending | N | N | 1 | ||||
CC006000000197678 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
CC006000000197701 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197722 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197744 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197745 | 2021 | Jul | Pending | N | N | 1 | ||||
CC006000000197858 | 2021 | Aug | Pending | N | N | 1 | ||||
CC006000000198270 | 2021 | Sep | Pending | N | N | 1 | ||||
Kohinoor Developers Total | 39 | |||||||||
KOLTE-PATIL DEVELOPERS LIMITED | P51800004446 | Konkan | Mumbai Suburban | CC006000000193290 | 2020 | Jun | Pending | N | N | 1 |
CC006000000193600 | 2020 | Sep | Pending | N | N | 1 | ||||
KOLTE-PATIL DEVELOPERS LIMITED Total | 2 | |||||||||
KONSHILA INFRASTRUCTURES PRIVATE LIMITED | P51800006042 | Konkan | Mumbai Suburban | CC006000000195248 | 2021 | Jan | Hearing Schedule | N | N | 1 |
KONSHILA INFRASTRUCTURES PRIVATE LIMITED Total | 1 | |||||||||
Krishna Developers Pvt. Ltd | P51800005340 | Konkan | Mumbai Suburban | CC006000000012258 | 2017 | Dec | Complete | Y | Y | 1 |
CC006000000012262 | 2017 | Dec | Complete | Y | Y | 1 | ||||
CC006000000056027 | 2018 | Sep | Complete | N | N | 1 | ||||
CC006000000056467 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000056469 | 2018 | Oct | Complete | N | N | 1 | ||||
CC006000000089528 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000110913 | 2019 | Sep | Complete | Y | Y | 1 | ||||
CC006000000195422 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000196422 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000198244 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198457 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198463 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198464 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198465 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198466 | 2021 | Sep | Complete | N | N | 1 | ||||
CC006000000198786 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198887 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
Krishna Developers Pvt. Ltd Total | 17 | |||||||||
KSHATRIYA PARSHVANATH VENTURES PRIVATE LIMITED | P51800010826 | Konkan | Mumbai Suburban | CC006000000195253 | 2020 | Dec | Pending | N | N | 1 |
CC006000000195254 | 2020 | Dec | Pending | N | N | 1 | ||||
KSHATRIYA PARSHVANATH VENTURES PRIVATE LIMITED Total | 2 | |||||||||
Kuldeep s Pednekar | P51800006384 | Konkan | Mumbai Suburban | CC006000000044424 | 2018 | May | Complete | Y | Y | 1 |
Kuldeep s Pednekar Total | 1 | |||||||||
KUMAR BUILDERS MUMBAI REALTY PVT LTD | P51800009338 | Konkan | Mumbai Suburban | CC006000000056420 | 2018 | Oct | Complete | N | N | 1 |
CC006000000056421 | 2018 | Oct | Complete | N | N | 1 | ||||
P51800012150 | Konkan | Mumbai Suburban | CC006000000000629 | 2017 | Oct | Complete | N | N | 1 | |
CC006000000000965 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001063 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000192812 | 2020 | Mar | Complete | N | N | 1 | ||||
KUMAR BUILDERS MUMBAI REALTY PVT LTD Total | 6 | |||||||||
Kusum Associates | P51800005568 | Konkan | Mumbai Suburban | CC006000000198298 | 2021 | Sep | Pending | N | N | 1 |
Kusum Associates Total | 1 | |||||||||
L&T Asian Realty Project LLP | P51800004566 | Konkan | Mumbai Suburban | CC006000000110754 | 2019 | Aug | Hearing Schedule | N | N | 1 |
P51800005456 | Konkan | Mumbai Suburban | CC006000000193599 | 2020 | Jul | Complete | N | N | 1 | |
CC006000000195803 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
P51800023075 | Konkan | Mumbai Suburban | CC006000000209654 | 2022 | Jan | Pending | N | N | 1 | |
CC006000000209655 | 2022 | Jan | Pending | N | N | 1 | ||||
L&T Asian Realty Project LLP Total | 5 | |||||||||
Labh Homes Creations And Holdings Pvt. Ltd. | P51800005306 | Konkan | Mumbai Suburban | CC006000000198882 | 2021 | Oct | Hearing Schedule | N | N | 1 |
Labh Homes Creations And Holdings Pvt. Ltd. Total | 1 | |||||||||
Ladam Homes Pvt Ltd. | P51800002692 | Konkan | Mumbai Suburban | CC006000000023179 | 2018 | Feb | Complete | Y | Y | 1 |
CC006000000055065 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055815 | 2018 | Aug | Complete | Y | Y | 1 | ||||
CC006000000057633 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000079392 | 2019 | May | Complete | N | N | 1 | ||||
CC006000000141037 | 2019 | Sep | Complete | N | N | 1 | ||||
CC006000000161368 | 2019 | Nov | Complete | N | N | 1 | ||||
CC006000000195014 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000196449 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
Ladam Homes Pvt Ltd. Total | 9 | |||||||||
LAKADAWALA DEVELOPERS PVT LTD | P51800012170 | Konkan | Mumbai Suburban | CC006000000023750 | 2018 | Mar | Complete | N | N | 1 |
CC006000000056958 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000057062 | 2018 | Nov | Complete | Y | N | 1 | ||||
CC006000000192695 | 2020 | Feb | Hearing Schedule | N | N | 1 | ||||
CC006000000195215 | 2020 | Dec | Complete | N | N | 1 | ||||
CC006000000196525 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196526 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196528 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196529 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196830 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
CC006000000197269 | 2021 | Jun | Complete | N | N | 1 | ||||
CC006000000197760 | 2021 | Aug | Complete | N | N | 1 | ||||
CC006000000197792 | 2021 | Sep | Hearing Schedule | N | N | 1 | ||||
CC006000000198054 | 2021 | Aug | Hearing Schedule | N | N | 1 | ||||
CC006000000198747 | 2021 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000198874 | 2021 | Nov | Hearing Schedule | N | N | 1 | ||||
LAKADAWALA DEVELOPERS PVT LTD Total | 16 | |||||||||
Larsen & Toubro Ltd. (Realty Division) | P51800002230 | Konkan | Mumbai Suburban | CC006000000000044 | 2017 | Aug | Complete | N | N | 1 |
CC006000000056757 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000056800 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000056809 | 2018 | Nov | Complete | Y | Y | 1 | ||||
CC006000000057656 | 2019 | Jan | Complete | Y | Y | 1 | ||||
CC006000000057669 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000057747 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000078573 | 2019 | Mar | Complete | Y | N | 1 | ||||
CC006000000078994 | 2019 | Apr | Complete | N | N | 1 | ||||
CC006000000079515 | 2019 | May | Complete | Y | N | 1 | ||||
CC006000000089576 | 2019 | Jun | Complete | Y | N | 1 | ||||
CC006000000100256 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000171836 | 2019 | Dec | Complete | N | N | 1 | ||||
CC006000000192984 | 2020 | Mar | Pending | N | N | 1 | ||||
P51800003307 | Konkan | Mumbai Suburban | CC006000000000230 | 2017 | Aug | Complete | N | N | 1 | |
CC006000000000515 | 2017 | Sep | Complete | N | N | 1 | ||||
CC006000000000999 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001117 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001223 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001230 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001269 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001313 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000001423 | 2017 | Oct | Complete | N | N | 1 | ||||
CC006000000012373 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000022886 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023140 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000023296 | 2018 | Feb | Complete | N | N | 1 | ||||
CC006000000055437 | 2018 | Jul | Complete | Y | N | 1 | ||||
CC006000000057215 | 2018 | Dec | Complete | N | N | 1 | ||||
CC006000000089713 | 2019 | Jun | Hearing Schedule | N | N | 1 | ||||
P51800005072 | Konkan | Mumbai Suburban | CC006000000022881 | 2018 | Jan | Complete | N | N | 1 | |
CC006000000044130 | 2018 | May | Complete | N | N | 1 | ||||
CC006000000089885 | 2019 | Jul | Complete | N | N | 1 | ||||
CC006000000089947 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000090083 | 2019 | Jul | Complete | Y | N | 1 | ||||
CC006000000100393 | 2019 | Aug | Complete | N | N | 1 | ||||
CC006000000100430 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000110645 | 2019 | Aug | Complete | Y | N | 1 | ||||
CC006000000110894 | 2019 | Sep | Complete | Y | N | 1 | ||||
CC006000000182003 | 2019 | Dec | Complete | Y | N | 1 | ||||
CC006000000195958 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195970 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195979 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195982 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195994 | 2021 | Feb | Complete | N | N | 1 | ||||
CC006000000195995 | 2021 | Feb | Complete | N | N | 1 | ||||
P51800013052 | Konkan | Mumbai Suburban | CC006000000055664 | 2018 | Aug | Complete | N | N | 1 | |
CC006000000193453 | 2020 | Jul | Complete | N | N | 1 | ||||
CC006000000209461 | 2021 | Dec | Pending | N | N | 1 | ||||
P51800013214 | Konkan | Mumbai Suburban | CC006000000194159 | 2020 | Sep | Complete | N | N | 1 | |
CC006000000196853 | 2021 | Apr | Hearing Schedule | N | N | 1 | ||||
Larsen & Toubro Ltd. (Realty Division) Total | 51 | |||||||||
LAXMIDEVI DEVELOPERS | P51800010929 | Konkan | Mumbai Suburban | CC006000000196022 | 2021 | Feb | Hearing Schedule | N | N | 1 |
LAXMIDEVI DEVELOPERS Total | 1 | |||||||||
LINKPROMOTERS & POKAR ENTERPRISES | P51800005290 | Konkan | Mumbai Suburban | CC006000000001667 | 2017 | Nov | Complete | N | N | 1 |
LINKPROMOTERS & POKAR ENTERPRISES Total | 1 | |||||||||
LOHITKA PROPERTIES LLP | P51800000735 | Konkan | Mumbai Suburban | CC006000000001590 | 2019 | Jan | Complete | N | N | 1 |
CC006000000022946 | 2018 | Jan | Complete | N | N | 1 | ||||
CC006000000054735 | 2018 | Jun | Complete | Y | N | 1 | ||||
CC006000000054987 | 2018 | Jun | Complete | N | N | 1 | ||||
CC006000000055423 | 2018 | Jul | Complete | N | N | 1 | ||||
CC006000000055679 | 2018 | Aug | Complete | N | N | 1 | ||||
CC006000000057497 | 2019 | Jan | Complete | N | N | 1 | ||||
CC006000000089579 | 2019 | Jun | Complete | Y | N | 1 | ||||
CC006000000195242 | 2020 | Dec | Hearing Schedule | N | N | 1 | ||||
P51800014539 | Konkan | Mumbai Suburban | CC006000000078198 | 2019 | Feb | Complete | N | N | 1 | |
P51800017754 | Konkan | Mumbai Suburban | CC006000000057788 | 2019 | Jan | Complete | N | N | 1 | |
CC006000000194882 | 2020 | Nov | Hearing Schedule | N | N | 1 | ||||
CC006000000197492 | 2021 | Jul | Hearing Schedule | N | N | 1 | ||||
LOHITKA PROPERTIES LLP Total | 13 | |||||||||
Lotus Grih Nirman Private Limited | P51800005163 | Konkan | Mumbai Suburban | CC006000000192918 | 2020 | Mar | Hearing Schedule | N | N | 1 |
Lotus Grih Nirman Private Limited Total | 1 | |||||||||
Lotus Logistics and Developers Private Limited | P51800006403 | Konkan | Mumbai Suburban | CC006000000078396 | 2019 | Mar | Complete | N | N | 1 |
CC006000000161235 | 2019 | Oct | Complete | Y | N | 1 | ||||
CC006000000194655 | 2020 | Oct | Complete | N | N | 1 | ||||
Lotus Logistics and Developers Private Limited Total | 3 | |||||||||
Lotus Logistics and Developers Pvt Ltd | P51800005655 | Konkan | Mumbai Suburban | CC006000000196819 | 2021 | Apr | Pending | N | N | 1 |
Lotus Logistics and Developers Pvt Ltd Total | 1 | |||||||||
M PATANKAR BUILD CONS PRIVATE LIMITED | P51800009931 | Konkan | Mumbai Suburban | CC006000000055627 | 2018 | Aug | Complete | Y | N | 1 |
CC006000000055630 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000055640 | 2018 | Aug | Complete | Y | N | 1 | ||||
CC006000000194440 | 2020 | Oct | Hearing Schedule | N | N | 1 | ||||
CC006000000196052 | 2021 | Mar | Pending | N | N | 1 | ||||
CC006000000196055 | 2021 | Mar | Pending | N | N | 1 | ||||
CC006000000196056 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196057 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196058 | 2021 | Mar | Hearing Schedule | N | N | 1 | ||||
CC006000000196669 | 2021 | Apr | Pending | N | N |